Email from: Chou, Rich to: Lake, Louis Cc: Franke, Mark; Sykes Marvin; Ninh, Son; Morrissey, Thomas; Reyes, Rogerio; Chou, Rich Powell, Sid Dated Wednesday, December 02, 2009 9:02 Am Subject: FW: Monday NRCs Attachments: 0015_InsideAverageML102910625 |
Person / Time |
---|
Site: |
Crystal River |
---|
Issue date: |
12/02/2009 |
---|
From: |
Chou R NRC/RGN-II/DRS/EB3 |
---|
To: |
Lake L NRC/RGN-II/DRS/EB3 |
---|
References |
---|
FOIA/PA-2010-0116 |
Download: ML102910625 (4) |
|
|
---|
Category:E-Mail
MONTHYEARML24025A0952024-01-24024 January 2024 Clarifications Related to the NRC Staff'S EA for Crystal River ML23180A0562023-06-13013 June 2023 ADP-CR3, Crystal River Unit 3 Email from J. Jernigan to Tim Barvitskie Confirmation That Enclosure 22 Radiological Groundwater Characterization Report ML21117A2902021-04-26026 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Physical Securityplan ML21096A0432021-04-0505 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Emergency Plan ML19344C8052019-11-12012 November 2019 Response from NEIMA Local Community Advisory Board Questionnaire 11-12-2019 H Danenhower ML19310D8602019-10-24024 October 2019 E-Mail Dated October 24, 2019, from Mark Vansicklen, Duke Energy Florida, to John Hickman, NRC, Providing Background Information for the Crystal River Partial Site Release Request ML19344C7872019-10-0303 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-03-2019 D Taylor ML19310D8212019-09-13013 September 2019 E-Mail Dated September 13, 2019, from John Hickman, NRC, to Mark Vansicklen, Duke Energy Florida, Requesting Background Information for the Crystal River Partial Site Release Request ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19070A3112019-03-0606 March 2019 Document Title or Accession No. E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of Partial Site Release Request for Crystal River Unit 3 ML19071A0662019-03-0606 March 2019 E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of a Request to Revise the ISFSI Only Emergency Plan for Crystal River Unit 3 ML18263A1462018-09-11011 September 2018 NRR E-mail Capture - Logbook Entry: 09/11/2018 a Kemp'S Ridley Sea Turtle (Federal Endangered Species) Carcass Was Recovered from the Crystal River Energy Complex Unit 2 Fossil Unit ML16054A2402015-12-10010 December 2015 E-44108 Attachment 10 E-mail from Steven Edwards (Due Energy) to Don Shaw (Areva) for Brunswick Nuclear Plant, Oconee Nuclear Station, and Robinson Nuclear Plant ML15176A2692015-06-25025 June 2015 NRR E-mail Capture - NRC Acceptance Review for LAR #317 Regarding Changes in Managment Titles ML15043A1042015-02-0505 February 2015 NRR E-mail Capture - Mf Crystal River TAC ML15015A6722015-01-15015 January 2015 NRR E-mail Capture - NRC Acceptance Review for LAR - Application for Order Approving Transfer of License and for Conforming License Amendment ML14344A9992014-12-0909 December 2014 NRR E-mail Capture - Severe Weather Exemption ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14290A1992014-08-27027 August 2014 NRR E-mail Capture - Draft RAIs for Ep/Eal LAR ML14163A2512014-06-0303 June 2014 NRR E-mail Capture - Request for Additional Information - Exemption for Conducting Annual force-on-force Exercises ML14153A0842014-05-29029 May 2014 NRR E-mail Capture - Logbook Entry: 05/29/2014 ML14153A6912014-05-21021 May 2014 NRR E-mail Capture - Request for Additional Information - Decommissionign Trust Fund Exemption Request ML14132A2052014-05-0909 May 2014 NRR E-mail Capture - MF3089 - Defueled TS Amendment Request for Additrional Information ML14114A2792014-04-10010 April 2014 NRR E-mail Capture - MF3089 Defueled TS Request for Additional Information ML14113A3632014-04-10010 April 2014 NRR E-mail Capture - MF3415/MF2981 RAI on EP Exemptions, EAL Scheme Change and E Plan Amendment ML14118A2872014-02-20020 February 2014 NRR E-mail Capture - Request for Additional Information: Exemptions to the Radiological Emergency Plan Requirements ML14045A0012014-02-12012 February 2014 NRR E-mail Capture - RAI: Adminstrative Controls ML14031A1752014-01-27027 January 2014 NRR E-mail Capture - CR3 Certified Fuel Handler Training and Retraining Program Approval - RAI Request ML14017A0772014-01-16016 January 2014 NRR E-mail Capture - Brunswick 1 and 2, Crystal River Unit 3, Harris Unit 1, and Robinson Unit 2 - Acceptance for Review of License Amendment Request for Cyber Security Plan Implementaion Milestone 8 (TAC Nos. MF3263 - MF3267) ML14027A0332013-12-16016 December 2013 NRR E-mail Capture - Eplan and EAL Scheme Change Request for Additional Information (LAR #315) ML13336A9112013-12-0202 December 2013 NRR E-mail Capture - Periodic Update to the Crystal River 3 Containment Petition ML13198A1422013-07-17017 July 2013 NRR E-mail Capture - Draft RAI - Request to Amend Section 5.0 of the CR-3 Technical Specifications (MF1504) ML13157A2062013-05-31031 May 2013 NRR E-mail Capture - Logbook Entry: 5/31/2013 ML13155A2062013-05-29029 May 2013 NRR E-mail Capture - Petition Status Update - Containment for Crystal River ML13120A0412013-04-29029 April 2013 NRR E-mail Capture - Status Update for Petition on Crystal River 3 ML13095A4002013-04-0505 April 2013 E-mail - Acceptance of Requested Licensing Action Change of Licensee Name ML13052A2402013-02-0808 February 2013 LTR-13-0131 - E-mail Tom Gurdziel Concerns Crystal River, Unit 3 ML13015A2832013-01-14014 January 2013 NRR E-mail Capture - Status of 10 CFR 2.206 Petition Related to Crystal River 3 ML13011A1482013-01-10010 January 2013 NRR E-mail Capture - CR-3 EPU LAR - Additional RAI from Eeeb (ME6527) ML12304A0682012-10-26026 October 2012 NRR E-mail Capture - RAIs Regarding Crystal River 30-day Report for ECCS Model Changes Pursuant to 10 CFR 50.46 Requirements (ME8408) ML12297A3922012-10-23023 October 2012 NRR E-mail Capture - Draft Bypass Test Plan ML12268A3592012-09-24024 September 2012 NRR E-mail Capture - Acceptance Review for LAR Regarding Cyber Security Plan Implementation Schedule Milestones ML12208A0142012-07-25025 July 2012 NRR E-mail Capture - State Consultation ML12184A3442012-07-0202 July 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Discussion/Clarification of Emcb Draft RAIs ML12144A0102012-05-22022 May 2012 NRR E-mail Capture - Acceptance Review Determination: CR-3 - Relief Request #12-001-MX for Option to Use ASME Code Case N-791 for Containment Repair ML12107A0682012-04-0404 April 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (Eptb) ML12100A1022012-03-30030 March 2012 NRR E-mail Capture - Acceptance Review for CR3 - LAR 312- Departure from a Method of Evaluation for Aux Bldg Over Head Crane, Implementation Schedule Change ML12023A1272012-01-23023 January 2012 NRR E-mail Capture - Acceptance Review Determination for TAC ME7729: CR3 - Relief Request #11-001-MX, Containment Surveillance Schedule, Fourth 10-Year ISI Interval ML12019A2662012-01-17017 January 2012 NRR E-mail Capture - Crystal River Nuclear Plant - Enforcement Petition 10 C.F.R. 2.206 ML12019A2672012-01-17017 January 2012 NRR E-mail Capture - Crystal River Nuclear Plant - Enforcement Petition 10 C.F.R. 2.206 2024-01-24
[Table view] |
Text
. Skn gupta, Abhijit From: Chou, Rich Sent: Wednesday, December 02, 2009 9:02 AM To: Lake, Louis Cc: Franke, Mark; Sykes, Marvin; Ninh, Son; Morrissey, Thomas; Reyes, Rogerio; Chou, Rich; Powell, Sid
Subject:
FW: Monday NCRs Attachments: 0015_insideAverage Moblity.jpg; Nov 21 markup. Cpntainment Unfolded GraphicsIR Mosaic.pdf\ IV LOU: kg0*z*t*'
i forward the attachments for your information. The average mobility or ratio on the crack area in the first attachment is about 1.30. Per CTL testing engineer, the crack will start to be seen when the mobility or ratio is 0.7 or above. Therefore, the gap of 1/64" identified by the testing and core boring is not matched the crack criteria. Can you ask CTL to do the evaluation why the crack is so small? Is it possible another larger crack nearby and is not identified?
From: Powell, Sid [mailto: Sid.Powell@pgnmail.com]
Sent: Wednesday, December 02, 2009 7:55 AM To: Chou, Rich
Subject:
RE: Monday NCRs The first file is the scan data for the area below the equipment hatch. The red indicates where the crack was found. The second file is the layout of 180 degrees of the building. The scan data in the first file is the 13' x 42' rectangle below the equipment hatch Sid Powell SGR Licensing x1 782 From: Chou, Rich [1]
Sent: Tuesday, December 01, 2009 4:52 PM To: Powell, Sid
Subject:
RE: Monday NCRs Sid:
Thanks. Do you have any pictures or drawings to show the location?
From: Powell, Sid [2]
Sent: Tuesday, December 01, 2009 12:47 PM To: Chou, Rich
Subject:
RE: Monday NCRs A detailed discussion has been requested by the Residents for today or tomorrow.
Here is what I know.
- 1. The area in question is a few feet below the reinforced concrete section near the lower west corner of the equipment hatch. This is on the left side when looking from outside the containment.
- 2. There is just one small area (square inches) showing the highest IR readings. The core bore was done there and confirmed a crack.
- 3. The crack is about 8 inches deep from the surface, but is not in plane with the hoop tendons.
- 4. There is a larger area of about 4' x 4' that shows possible chance of a crack.
- 5. The whole area that was scanned was 13' x 42' with other areas appearing solid.
1177
Sid Powell SGR Licensing x1 782 From: Chou, Rich [mailto: Rich.Chou@nrc.gov]
Sent: Tuesday, December 01, 2009 9:39 AM To: Powell, Sid Cc: Franke, Mark; Sykes, Marvin; Morrissey, Thomas; Reyes, Rogerio; Lake, Louis; Chou, Rich; Ninh, Son
Subject:
FW: Monday NCRs Sid:
NCR 368389 identified a crack in the containment wall inside the Intermediate Building in the area below the equipment hatch based on the Impulse Response (IR) Testing and confirmed by Core Boring. The Core Boring was in the vicinity of the highest average IR mobility value and the crack width or gap was measured at 0.009" to 0.016" which is equivalent to 1/64". Please provide the picture or drawing to show the exact location and more detail information.
As I understood when I observed the IR testing and discussed with CTL Testing Engineer, he said that the higher value of the IR is the higher or wider gap. There was a maximum gap of 2 and 1/4" identified in the Containment wall. This small gap identified might not be the real size of the gap. It is potentially that there is a bigger gap nearby and is not identified yet.
From: Powell, Sid [3]
Sent: Tuesday, December 01, 2009 8:02 AM To: Chou, Rich; richchou5@yahoo.com
Subject:
Monday NCRs See attached.
Sid Powell SGR Licensing xl 782 2
-1.39
-1.20
-1.00
-0.800
-0.600
-0.400
-0.200
-0.0710 2 3 5 4 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Column
2 3
A EL 250' Pour 16 EL 240' Pour 15
--- EL 230' IR scans completed Pour 14 per PT-407T: --- EL 220' Pour 13 210' Pour 12 200' SOR OPs"l~
190' 180' Actual IR scan output data:
Blue = no delaminatioi Yellow= transition Red = delaminated EL 150'
--- - - EL 140' Pour 5
--- EL 130' I Pour 4 Drawing scale --- EL 120' is not exact r,
EL 110' II Pour 2
....... EL 100'
--- -- -- EL 90' 1-0014 1 1-0010 WA)
QProges Enery 1