Category:Meeting Notice
MONTHYEARPMNS20241406, Pre-Submittal Meeting Regarding a Proposed License Amendment Request to Revise Various Technical Specification Shutdown Actions Mode Change Restrictions2024-11-0707 November 2024 Pre-Submittal Meeting Regarding a Proposed License Amendment Request to Revise Various Technical Specification Shutdown Actions Mode Change Restrictions PMNS20241263, Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Increase Flexibility in Mode Restraints2024-10-0202 October 2024 Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Increase Flexibility in Mode Restraints PMNS20241255, Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2024-10-0101 October 2024 Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes PMNS20240906, Southern Nuclear Operating Company (SNC) Fleet Physical Barrier Exemptions2024-07-11011 July 2024 Southern Nuclear Operating Company (SNC) Fleet Physical Barrier Exemptions PMNS20240744, Pre-submittal Meeting with Southern Nuclear Operating Company to Discuss a Proposed License Amandement Request to Revise TS 3.3.8 Engineered Safety Feature Actuation System Instrumentation, for Vogtle Units 3 and 42024-06-13013 June 2024 Pre-submittal Meeting with Southern Nuclear Operating Company to Discuss a Proposed License Amandement Request to Revise TS 3.3.8 Engineered Safety Feature Actuation System Instrumentation, for Vogtle Units 3 and 4 PMNS20240750, Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Technical Specification (TS) 3.8.2, DC (Direct Current) Sources - Shutdown, for Vogtle Electric Generating Plant (Vogtle), Units 3 and 42024-06-0404 June 2024 Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Technical Specification (TS) 3.8.2, DC (Direct Current) Sources - Shutdown, for Vogtle Electric Generating Plant (Vogtle), Units 3 and 4 PMNS20240691, Southern Nuclear Operating Company (SNC) Fleet Physical Barrier Exemptions2024-05-21021 May 2024 Southern Nuclear Operating Company (SNC) Fleet Physical Barrier Exemptions PMNS20240662, Notice of Meeting with Southern Nuclear Operating Company (SNC) Regarding the Steam Generator (SG) Tube Inspection Report for Vogtle, Unit 12024-05-13013 May 2024 Notice of Meeting with Southern Nuclear Operating Company (SNC) Regarding the Steam Generator (SG) Tube Inspection Report for Vogtle, Unit 1 PMNS20240471, Annual Assessment Meeting2024-04-17017 April 2024 Annual Assessment Meeting PMNS20240400, Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Revise Condition a (One Valve or Damper Inoperable) of Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), for Vogtle, Units 3 and2024-04-0404 April 2024 Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Revise Condition a (One Valve or Damper Inoperable) of Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), for Vogtle, Units 3 and 4 PMNS20240399, Notice of Meeting with Southern Nuclear Operating Company2024-03-19019 March 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240397, Notice of Meeting with Southern Nuclear Operating Company2024-03-19019 March 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240396, Notice of Meeting with Southern Nuclear Operating Company2024-03-19019 March 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240398, Notice of Meeting with Southern Nuclear Operating Company2024-03-19019 March 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240379, Pre-Submittal Meeting Regarding Proposed Alternative Requests to Extend Exam Interval for Specific Components at Joseph M. Farley Nuclear Plant, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1 and 22024-03-15015 March 2024 Pre-Submittal Meeting Regarding Proposed Alternative Requests to Extend Exam Interval for Specific Components at Joseph M. Farley Nuclear Plant, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1 and 2 PMNS20240263, Pre-Submittal Meeting Between NRC and Southern Nuclear Operating Company (SNC) for a Proposed License Amendment Request Related to TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections, at Vogtle, Units 3 and 42024-02-22022 February 2024 Pre-Submittal Meeting Between NRC and Southern Nuclear Operating Company (SNC) for a Proposed License Amendment Request Related to TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections, at Vogtle, Units 3 and 4 PMNS20240143, Notice of Meeting with Southern Nuclear Operating Company2024-02-0101 February 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240141, Notice of Meeting with Southern Nuclear Operating Company2024-02-0101 February 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240140, Notice of Meeting with Southern Nuclear Operating Company2024-02-0101 February 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240142, Notice of Meeting with Southern Nuclear Operating Company2024-02-0101 February 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20231396, Pre-Submittal Meeting with Southern Nuclear Operating Company (SNC) Regarding a Proposed Relief Request for Explosively Actuated Valves at Vogtle Electric Generating Plant (Vogtle), Units 3 and 42023-12-15015 December 2023 Pre-Submittal Meeting with Southern Nuclear Operating Company (SNC) Regarding a Proposed Relief Request for Explosively Actuated Valves at Vogtle Electric Generating Plant (Vogtle), Units 3 and 4 PMNS20231383, Pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) Regarding the Proposed Transition of the Vogtle Electric Generating Plant, Units 3 and 4 Ndqam Into the SNC Fleet QATR2023-12-11011 December 2023 Pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) Regarding the Proposed Transition of the Vogtle Electric Generating Plant, Units 3 and 4 Ndqam Into the SNC Fleet QATR PMNS20231364, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231363, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231365, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231356, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231357, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231360, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231359, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231355, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231358, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231347, Notice of Public, pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) to Discuss a Proposed Fleet License Amendment Request (LAR) for Farley, Hatch, and Vogtle2023-11-29029 November 2023 Notice of Public, pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) to Discuss a Proposed Fleet License Amendment Request (LAR) for Farley, Hatch, and Vogtle PMNS20231198, Closed Meeting - Security-Related - SNC Fleet Physical Barriers Exemptions.The Basis for the Closed Meeting Is the Discussion of Official Use Only - Security-Related Information2023-10-25025 October 2023 Closed Meeting - Security-Related - SNC Fleet Physical Barriers Exemptions.The Basis for the Closed Meeting Is the Discussion of Official Use Only - Security-Related Information PMNS20231197, Pre-Submittal Meeting for Proposed License Amendment Request (LAR) to Reduce Ultimate Heat Sink (UHS) and Nuclear Service Cooling Water (NSCW) Fan Mission Times2023-10-24024 October 2023 Pre-Submittal Meeting for Proposed License Amendment Request (LAR) to Reduce Ultimate Heat Sink (UHS) and Nuclear Service Cooling Water (NSCW) Fan Mission Times PMNS20231113, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231119, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231114, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231115, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231112, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231111, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231116, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231118, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231117, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20230993, Pre-Submittal Meeting for a Proposed License Amendment Request to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves)2023-09-14014 September 2023 Pre-Submittal Meeting for a Proposed License Amendment Request to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) PMNS20231004, Notice of Meeting with Southern Nuclear Operating Company2023-09-0707 September 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231002, Notice of Meeting with Southern Nuclear Operating Company2023-09-0707 September 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231001, Notice of Meeting with Southern Nuclear Operating Company2023-09-0707 September 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231003, Notice of Meeting with Southern Nuclear Operating Company2023-09-0707 September 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20230909, Notice of Meeting with Southern Nuclear Operating Company2023-08-29029 August 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20230802, Notice of Meeting with Southern Nuclear Operating Company2023-08-11011 August 2023 Notice of Meeting with Southern Nuclear Operating Company 2024-07-11
[Table view] Category:Memoranda
MONTHYEARML24122C6202024-05-0101 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 Docket Nos.. 50-424, 50-424, 52-025, and 52-026 Meeting Number 20240471 ML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report ML24004A2192024-01-0808 January 2024 Construction Reactor Oversight Process Performance Metric Report for Calendar Year 2023 ML23303A2032023-11-0101 November 2023 October 24, 2023, Summary of Comment Gathering Public Meeting on Lessons Learned from the ITAAC Hearing Process for Vogtle Units 3 and 4 ML22348A0862023-07-25025 July 2023 Finding in Accordance with 10 CFR 52.103(G) That All Acceptance Criteria Are Met for Vogtle Electric Generating Plant, Unit 4 ML23115A0382023-05-0909 May 2023 Summary of Readiness Group Public Meeting on April 20, 2023 ML23115A0662023-05-0101 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have Presubmittal Meeting for Vogtle Electric Generating Plant, Unit 4 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 ML22214B4882023-02-0808 February 2023 Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 4 ML22355A0322023-01-0303 January 2023 Revised Charter for the Vogtle Readiness Group to Oversee the Transition to Operations for Vogtle Units 3 and 4 ML22334A0812022-12-0101 December 2022 Update to Targeted Inspections, Tests, Analysis, and Acceptance Criteria for Vogtle Electric Generating Plant Unit 4 ML22322A1672022-11-28028 November 2022 Summary of 11/15/2022 Public Meeting on Lessons Learned ML22237A0782022-08-0505 August 2022 American Nuclear Insurers, Notification of Change in the Number of Power Reactors in the Secondary Financial Protection (SFP) Program ML20290A2812022-08-0101 August 2022 103g - Final Memorandum ML22123A0652022-05-0202 May 2022 Public Meeting Summary Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 50-424, 50-425, 52-025, 52-026, Meeting Number 20220330 ML21337A0032021-12-0707 December 2021 Summary of Vogtle Readiness Group Public Meeting on December 2, 2021 ML21322A1502021-12-0202 December 2021 Summary of November 10, 2021 Public Meeting with Southern Nuclear Operating Company ML21316A0692021-11-22022 November 2021 November 4, 2021 Summary of Public Meeting with Southern Nuclear Operating Company ML21280A2962021-10-22022 October 2021 Replacement of Page 2 to Letter Dated June 30, 2020, Titled License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions (EPID L-2020-LLA0150) ML21230A0102021-08-24024 August 2021 Summary of Public Meeting with Southern Nuclear Operating Company on August 12, 2021 ML21154A2772021-07-20020 July 2021 Summary of a Public Meeting with Southern Nuclear Operating Company on May 27, 2021 ML21194A0402021-07-20020 July 2021 Summary of June 24, 2021 Public Meeting with SNC ML21190A0622021-07-16016 July 2021 Summary of July 8 2021 Public Meeting to Discuss Late-Filed Allegation Process for Vogtle Electric Generating Plant Units 3 and 4 ML21194A0392021-07-16016 July 2021 July 8, 2021 Summary of Public Meeting with Southern Nuclear Operating Company ML21124A2032021-05-0606 May 2021 ASME Alternative ALT-16 Pre-submittal Meeting Summary 4-29-21 ML21123A1432021-05-0505 May 2021 April 22, 2021, Summary of a Public Meeting with Southern Nuclear Operating Company ML20318A2422020-12-18018 December 2020 .72 50.73 Applicability Memo ML20351A2822020-12-10010 December 2020 Summary of Public Meeting with Southern Nuclear Operating Co ML20318A2412020-11-18018 November 2020 Summary of Public Meeting with Southern Nuclear Operating Company, to Discuss Topic Regarding Vogtle Electric Generating Plant, Unit 4: ITAAC Post Closure Notification for ITAAC Index Number 344 ML20303A0422020-11-0505 November 2020 Summary of October 22, 2020 Public Meeting with Southern Nuclear Operating Company NL-20-1262, Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion2020-10-30030 October 2020 Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion ML20296A2432020-10-15015 October 2020 Summary of 10-15-20 Public Meeting with Southern Nuclear Operating Company ML20283A4652020-10-15015 October 2020 Summary of Public Meeting on October 8, 2020 with Southern Nuclear Operating Company ML20279A5202020-10-0707 October 2020 October 1, 2020, Summary of Public Meeting with Southern Nuclear Operating Company ML20183A0902020-09-24024 September 2020 Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 3 ML20262G9882020-09-22022 September 2020 September 17, 2020 Summary of Public Meeting with Southern Nuclear Operating Company ML20248H3292020-09-10010 September 2020 Meeting Summary for September 3, 2020 Public Meeting with Southern Nuclear Operating Company ML20247J4812020-09-10010 September 2020 Summary for August 27, 2020 Public Meeting with Southern Nuclear Operating Company ML20191A3832020-08-14014 August 2020 Transition to Reactor Oversight Process for Vogtle Electric Generating Plant, Units 3 and 4 ML20216A6252020-08-10010 August 2020 Summary of a Public Meeting with Southern Nuclear Operating Company on July 30, 2020 ML20216A6362020-08-10010 August 2020 Summary of a Public Meeting with Southern Nuclear Operating Company on July 23, 2020 ML20205L4312020-07-29029 July 2020 Summary of a Public Meeting with Southern Nuclear Operating Company to Discuss Inspections, Tests, Analyses and Acceptance Criteria Nos. 375 and 216 ML20178A1302020-07-15015 July 2020 Memorandum Transmitting Safety Evaluation Regarding Welded Reinforcement Bar Splices at Vogtle Electric Generating Plant Units 3 and 4 ML20190A0182020-07-0808 July 2020 Summary of Meeting Regarding the Vogtle Readiness Group ML20168A3352020-06-26026 June 2020 Summary of June 11, 2020 Public Meeting with Southern Nuclear Operating Company ML20150A0092020-06-0202 June 2020 Summary of May 28, 2020 Public Meeting with Southern Nuclear Operating Company ML20154K7272020-06-0202 June 2020 EOC Meeting Summary ML20141L6182020-06-0101 June 2020 Summary of May 14, 2020 Public Meeting with Southern Nuclear Operating Company ML20141L6982020-05-26026 May 2020 Audit Report for Vogtle Electric Generating Plant Unit 3 LAR 20-001: Auxiliary Building Wall 11 Seismic Gap Requirements ML20133K1062020-05-15015 May 2020 Audit Plan for Vogtle Electric Generating Plant Units 3 and 4, Request for License Amendment: Core Makeup Tank Boron Concentration Requirements (LAR 20-004) 2024-05-01
[Table view] |