ML102871124

From kanterella
Jump to navigation Jump to search

Lic 109 Acceptance Review - Fermi 2 - LAR - ME4761 - Revision to Fermi 2 Radiological Emergency Response Preparedness Plan to Change Staff Augmentation Times
ML102871124
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/12/2010
From: Mahesh Chawla
Plant Licensing Branch III
To: Hassoun A
Detroit Edison
Chawla M, NRR/DORL, 415-8371
References
TAC ME4761
Download: ML102871124 (2)


Text

From: Chawla, Mahesh Sent: Tuesday, October 12, 2010 2:56 PM To: Alan I Hassoun Cc: Norris, Michael; Anderson, Joseph; Pascarelli, Robert; Meighan, Sean; Lingam, Siva; Boyle, Patrick

Subject:

LIC 109 Acceptance Review - Fermi 2 - LAR - ME4761 - Revision to Fermi 2 Radiological Emergency Response Preparedness Plan to Change Staff Augmentation Times By letter dated September 24, 2010 (ADAMS Accession No. ML102700478), Detroit Edison submitted a license amendment request for Fermi 2 Nuclear Power Plant (Fermi 2). The proposed amendment would revise the Fermi 2 Radiological Emergency Response Preparedness Plan to Change Staff Augmentation Times. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact me

@(301) 415-8371 or Mahesh.chawla@nrc.gov. Thanks Mahesh Chawla, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties ()

Subject:

LIC 109 Acceptance Review - Fermi 2 - LAR - ME4761 - Revision to Fermi 2 Radiological Emergency Response Preparedness Plan to Change Staff Augmentation Times Sent Date: 10/12/2010 2:49:28 PM Received Date: 10/12/2010 2:55:00 PM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients:

hassouna@dteenergy.com (Alan I Hassoun)

Tracking Status: None Michael.Norris@nrc.gov (Norris, Michael)

Tracking Status: None Joseph.Anderson@nrc.gov (Anderson, Joseph)

Tracking Status: None Robert.Pascarelli@nrc.gov (Pascarelli, Robert)

Tracking Status: None Sean.Meighan@nrc.gov (Meighan, Sean)

Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)

Tracking Status: None Patrick.Boyle@nrc.gov (Boyle, Patrick)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 14082 10/12/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: