CR3 Outage Containment Repair Project - Level 3 Schedule
ML102871044
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/04/2010
From:
- No Known Affiliation
To:
Office of Information Services
References
FOIA/PA-2010-0116
Download: ML102871044 (16)


Text

CR3 Outage Containment Repair Project - Level 3 Schedule Row Activity Lecripi

.iySts Eal4 ROWes Doc Jan Feb F~~P inish Dur 28 04 11 18 25 01 08 15 22 01 Apr 22 29 05 Mar I ij 2

DELACT010

-Issue Level 2 Schedule That Includes Input from Engineering &

11/171090701/07/1012 34 C13300 EPC Contractor

-Ensure the Installation of 3

DELACT012 Containment Equip Hatch is Factored 11/17/0907 01/07/10 12 34 C13300 into CRT Sch 4

DELACT009

-Prepare & Issue SGT Containment 12/01/090701/06/1012 2

Repair Scope of Work Document 5 DLACOO5

-Prepare & Issue SGT Staffing &

112/01/09 07' 01/09/1012 58 C13300 5 DELCT005 Mobilization Plan / Task Plans 4-toe L-1o 2 Sottl." That

,.7/019 07 01M131012 6

DELACT008

-Establish When SGT Takes Control 109 9

of Schedule Function.

12/01/0907 0111311012 94 C13300 8

DELLOG008

-Tent #R39 Move Tent From MTF to 12/18/0907 01/06/1017 23 C62100 MLV & Replower 9

ELLOG005

-Move P. Ingersol Crew From Trailer 1118/09 1 71 23 C62100 9 ELOGO5

  1. 24 to Trailer #5 7

1/7(1 10 DELLO011

-Tent # 80 Move Tent From MTF to 01/04/10 1401/25/1008 144 C^^1^

L O

MLYT & Repower l01/04/10 14u01//

144 C62100

-P. Fagan Crew Move Personnel &

ill DELLOG014 TheirlItems from Trailer # 1to Trailer 101/04/10 1401/25/10 081144 C62100

  1. 24
12 DELLOG017 FabTaen Phsia Owerhi
fR 01/11110 07101/22/10 17! 100 C62100 Fab Ten #4

-TolS# 39 Move Teat From SMTF toMLY &

-Move P. Ingeesw Cleaw Fro Traloer#24 to lroer#5 WIU17 01ew 1i17 0 -Tet #80 Mo.

'T o MLY &

11 -.

F r

01/04/1014 01, 12 0111l 13 1 01111 I

Tent From Mov at. Phtysical O0WW*W of 3R Fab TOMt

  1. 46 1007 01/22/10 17 ra10 #24 Demo to alelr 1s & 18 1007 01/2r/1017 14 MRsa.

POW o T

0tIt8/1007 0W/21/1017 t5 -Take Physical ownership of SGR Decon Tent # 6 02/01/1007 02/12/10 17 13 14 15 DELLOG02O DELLOG023 DELLOG026

-Trailer # 24 Demob to Trailers 16 18 101/11/10 07 01/29/1017

-Restore the Parking in The Main Parking Lot

-Take Physical Ownership of SGR Decon Tent # 86 01/18/1007 02/01/1007 01/29/1017 02/12/1017 150 C62100 100 C62100 100 C62100

-74E Develop Root Gauss0 17 DELRCA058

-PE Develop Root Cause Document (AR 358724358724 10/21/090J7W0124/10 19 245 C45500 li ROM Earty SWui Finish D

O w a Docuirand (AR !.!124 l

1M/ /u IM/

Ulav4il 19 11 18 i

25 01 Row Acivt Descriptim 28 04 L.9.W:

Dec Jan January 04, 2010 05:16:37 PM 08 1

is 22 01 08 "s

5 is 1

22 29 05 Feb Mar Apr Page of ii Rev D

Row Actvit DescripticIi CR3 Outa e Containment Repair Project - Level 3 Schedule WDc Jan

-Feb_

Fiih wn 04 1

i8,25 01 08 15 22 01 Ar Mar s

15 22 29 05 18 DELRCA060 19 DELRCA056

-PII Develop Suppod/Refute Root 1 10/25/09 07 01/12110 19 88 C45500 Cause Analysis Documentation

-PII Analyze, Develop & Issue Final 11/1510916101r21/1019 Root Cause Analysis Report 1197 45500 lirz 07 0

0109 sI0peetd 19

=

Z111=6oOovke 4

20 21 DELRCA061 DELRCA086

-PE Perform Owners Review of Support/Refute Root Cause Analysis Documentation PiI Tune Abaqus Model w/ Creep Test Results, Creep Gradient, ASR 11/24/0907 01/14/10 19 112 C45500 12/23/09 14 01/08/1014 96 C45500 22 DELRCA082

-PII Expand Nastran Model 12/23/09 14 01/06110 02 36 C45500 23 DELRCA080

-PII Procure Super Computer Use 12/23/09 14 01/06/10 02 36 C45500 24 DELRCA084 Pnt Load Expand Model on Abaqus 01/06110 02 01/08/10 02 48 C45500 125 DELRCA057

-PIt Analyze, Analysis of MPR 01/08/1007048 045500 Detension Scope & Sequence 10__8100 01/11/10_191

'26 DELRCA088 PIM Cross Check Abaqus & Merin 01/08/10 14 01/10/10 14 48 C45500 Models 27 DELRCA071 PIt Perform FEM Analysis with Lab 01/10/101401/10/1019 5

C45500 Test Results 28 DELRCA056C PE Perform Owners Review of Final 01/22/1007 01/23/10191 24 C45500 Root Cause Analysis Report 11/15M916 01/21110 19

-PE Padrkm Ome w

, t$

1lJ2448 07 01/110 19 2P Two Akqu Mide=

M o 12"&

14 01/st 1

22 -P11 Enoed Naeofr Model W-11, -

Ir 0101e!{ 002 12r23/0914 0t/06/1i02 24 PH1 Load EA Ol A.02 25 MPR D 01/18/1007 PI C

  • 26 Me"d 01/081101, 27 01 101110/1 1000100200 01/11110
  • Chao Ah.

6m"011010 P910 Lo7 Too FEM 14 0..I

&s.

4 29 30 DELRCA059 DELRCA059M PNSC Review & Approve Root Cause Determination Root Cause Analysis Complete/Approved MILESTONE 01/25/100701/27/1019 36 C45500 01/27/10 19 01/27/10 19 0

G45500 10 19 08of Fin Root Coao-Aroyli 010211007 010311019 2M PNSC R eview & Ap RRoo C0o-Deternlosse 01/2511007 01/27110 19 30 RRof Cm-se -

M CoPmete/APPro4 MILEST

  • 127110 19 01/27/1019 32 Dear s*-

Compil MILESTONE

  • 2/;'0 130 02/0011013 EC 6031: Revise EC Sawd w Tendon T ioon Co to 010911018 01/28/1014 I-I-I-i 32 DELDBA-3M Design Basis Analysis Complete MILESTONE 02/05/1013 02/0511013 0

C45100 EC 63016: Revise EC Based on 33 DELDBA-0030 Tendon Tension Calc to support Fuel 01/25/10 18 01/28/10 18 72 C43200 Load Raw Act~t Decito rf tW l

1 r 28 04 11 18 25 01 08 15 22 01 08 15 22 29 05 Dec Jan Feb Mar Anr West-InProg-s Acdoy January 04, 2010 05:16:37 PM P.

2.0 11 Rev D

CR3 Outage Containment Repair Project - Level 3 Schedule Row A.0.U*

fbaft stam 28IWS o

Fay Einish m

D ac 2 04 Jan Feb Mar AIr I

1i 25 01 08 15 22 01 08 15 22 29 05

...... 1 D e..

I 34 i35

36 137 I

DELOUT-0200 DELDBA-0004 DELDBA-0009 DELDBA-0018 Interface - Complete Design Requirements Prior to Fuel Load Start

-Detensioning Calc - Incorp Additional Elements (Eq Htch)

-Detensioning Calc - Include Results of Analysis in Calc & Release for Review

-Detensioning Calc-Conduit Local Stress Analysis (MPR Calc 0102-0135-06) 01/281101801128/1018 0

C45100 12/02/0921 01/08/10101 92 C43200 Rkm/ede PdW to Fuel 128/1018 01/28/1018 12/23/09 17 01/08/1007 89 C43200 12/27/09 07 0111/10 13 167 C43200

-Detensioning Calc-Concrete 38 DELDBA-0010 Reinforcement Ratios (MPR 12/27/09 07 01106110 13 47 C43200 Calculation 0102-0135-01)

-Detensioning Calc-Concrete 39 DELDBA-0012 Strength & Elastic Modulus (MPR 12/27/0907 01/10/10 13 143 C43200 Calc 0102-0135-02)

-Detensioning Calc-Finite Element 40 DELDBA-0016 Model Descnption(MPR Calc 12/27/0907 01/13/10 13 215 C43200 0102-0135-04) 41

-Detensioning Calc-Tendon Tension 1/10/1013 143 043200 41 DELDBA-0014 (MPR Calculation 0102-0135-03) 12127/09 07 42 DELDBA-0006

-Detensioning Calc - Perform 1

Revised Calc Owners Review 01/08/1007 01112110 07 96 043200

-Detensioning Calc-Tendon 43 DELDBA-0020 Detensioning Evaluation (MPR Calc 01 /09/10 13101/14/10 131 120 C43200 0102-0135-06) 44 DELDBA-0005

-Detensioning Calc - Approve Calc 01/13/10 13101/15/10 13 48 C43200 45 DELDBA-1M Detensioning Calculation Complete 01/15/1013 01/15/1013 0

043200 MILESTONE

-Deialeehle C.k bloop Rmf of lene~oehl CC-l 1 7507

0111111013 30Reell*oe8/i Red- (MPR 1227/0007 0111011013 12J2710907 101113)1013 41 -. 0 dd4Cl-hd 42Ra~l..

0018/W100/

Dee Ca 0160/1

.8/Ocalc-C.1eo-018 011121I0 4ob400 Ced 3

0I1111

-Deta,~

/13110130 45 4.

Revie 37

.dmn 013 k0in Celo.

I 01115/10 13 46 DELDBA-0202 47 DELDBA-0204 48 DELDBA-0203 49 DELDBA-0205

-Containment Delam Calc -S&L Perform Final Analysis

-Containment Delam Calc -Perform Owners Review of S& L Calc Containment Delam Calc -S&L Issue Draft Calc for PE Review

-Containment Delam Calc -Resolve Owners Review Comments on S&L Calc 12/22109 13 01/20/1009 379 C43200 01/20/100901/23/1018 01/20110 0901/20/1009 81 C43200 0

C43200 17-Cononen 0010 Calo -

Pe.110-1 O...en Roi fo 110/10 D9 01123/lO 10 a

R0.108.&0.0010.-

R.-

M1201018 010112100 8

01/23/10 18 01/25/1018 48 C43200 28w 04UA 11rpto 8l SatEaI i

28 01

,08 15 22 01 08 15 22 29 05 Finish Dr Dec Jan Feb Mar Apr Le9end; Milestones I-Arog

_1_

_Page 3 of 16 January 04,2010 05:16:37 PM RevD

Row Actvt CR3 Outa e Containment Repair Project - Level 3 Schedule L

a w

n Im Doc Jan Feb Mar I

Apt

"" Start iiý 1).,

WDS 28 04 11 18 25 01 U

s5 22 01 88 1s 22 29 05

/

r I

r

-~

Containment Delim Calc - Issue

!50 DELDBA-0206 Final S &L Calc 51 DELDBA-0100

-Containment Bldg Calc - Finalize Computer Analysis 52 DELDBA-0104

-Containment Bldg Clc - Incorp Eq Hitch Model Details

-Containment Bldg Colc - Compile 53 DELDBA-0101 Calc to be Ready for ReviewNedfination 01/25/1018 01/15/1013 01/1511013 01/25/10 18 01/22/10 13 01/29/1013 0

C43200 168 C43200 336 C43200 51 k

011151101 62-Cont 52.1=1 01/22/10 13101/29/10 131 168 C43200 150===vle1

=="`4340 1221013 I

la013%O103 53 -Cn Ne9 Ca0 Od 0

ý.#l 1=32Ir 13V1013 025/3013 02IM

/5/13 1

-Cortak-M~ Bldg Calc C-0~ MILESTONE

~2/1;0 13 02.51013 154 DELDBA-0102 55 DELDBA-0103

-Containment Bldg Calc - Owners ReviewNerification 01/29/10 13102/03/10 131 120 C43200

-Containment Bldg Calc - Incorporate Review Comments & Approve 02/03/10 13102/05/10 13 48 C43200 56 DELDBA-2M Containment Bldg Calc Compl MILESTONE 02/05/10 13102/05/10 13 0

C43200 I

1~

58 DELDESLIM EC Implementation Design Complete MILESTONE

-EC 75000 PH 1 Concrete Cut:

59 DELDES11710 Planning Prepare W/O 01652765 Packages Complete 02/14/10 07102/14/10 07 12/26/09 10t01/15/10 07 0

C45100 257 C47100 EC lpaWk-t.0-. D.Air 2 COwralie, MILESTONE 03114/1007 2I11 E EC 75218 PH 2 Detension: Develop 60 DELDES21020M 70% Pkg 12/30/091401/11/10 20 25 C45100 61 DELDES21025 EC 75218 PH 2 Detension: Distribute 01/11/1020 01/12/10 04 8

C45100 70% Pkg for Review 62 DELDES21 11M EC 75218 PH 2 Detension: Develop 01/11/102001/16/1020 120 C45100 Final EC "Pkg for final DRB 0

63 DELDES21027 EC 75218 PH 2 Detension: Review 01/12/1004 01/13/1004 24 C45100 70% Pkg 54 C 75100 PH 1 Coae "1415/10007 So EC75218 PH 2De o

12/30/0514 01/11/t0 20 61 01/1 62 63 61 0ý C 75218 PH 9.6te 70A 11020 0

C 75218 PH evelop 15.1

/1020 0

-C 75218 P, qevlew 70%

EC 75218 F 70% Paek.

'1311002 EC 75218 1 MILESTON

'13,1004 P9 fiex RevS 12/131004 2 Detallon:

C -ftilb, 1/13/1004 r 2 Details.

a Meelio 0111311004 H 2 Detenwlee

- 70% Pkq Mb 01/1311004 64 DELDES21030 65 DELDES2120Z Raw Actvt EC 75218 PH 2 Detension: 70%

Package Meeting EC 75218 PH 2 Detension:

MILESTONE - 70% Pkg Mtg Cplt 01/13/1002101/13/1004 2

C45100 01/13/1004t01/131004 0 C45100 Early StartEarly Rom W1_

Finish~ Dur 28 04 11 18 25 01 6

15 22 01 08 15 22 29 05 Dao Jan-Feb Mar AI,.

Doc Jan Fob Mar A.r Legend; MWeso January 04, 2010 05:16:37 PM Page 4 of 14 Rev D

CR3 Outage Containment Repair Project - Level 3 Schedule Row Actvt Decrpto rt Sm Erl om Dec Jan Feb Mar Apr 28 04 11 18 25 01 08 15 22 01 08 15 22 29 05 68 DELDES2120 167 DELDES219OZ EC 75218 PH 2 Detension:

Inter-Departmental Reviews EC 75218 PH 2 Detension: Milestone

- Issued for Final Review EC 75218 PH 2 Detension: Mech /

DELDES2115M Struc - DV 01/16/1020 01/16/1020 01/16/1020 01116/10 20 01/18/1020 01/16/10 20 01/18/1020 01119/10 20 48 C45100 0

C45100 48 C45100 24 C45100 68 EC 75218 PH 2 Detension: Incorp 69 DELDES2117 Verification Comments 66EC 67 E M.

001, 70 11 Oil 70 DELDES2123 EC 75218 PH 2 Detension: Incorp 01/18/10 20 01/19/10 20 24 C45100 Review Comments 71 DELDES2125 EC 75218 PH 2 Detension: Supv 01/19/10 20 01/20110 00 4

C45100 Review Prior to Final DRB EC 75218 PH 2 Detension: Distrib 72 DELDES2125D Fn DRB Pk f Review 01/20/1000 01/20/1001 1

C45100 Final DRB Pkg for Review 73 DELDES2125R EC 75218 PH 2 Delension: Review 01/20/10 01 01/21/10 01 24 C45100 Final DRB Pkg 74 DELDES21205 EC 75218 PH 2 Detension: Final 01/21/100101/21/1003 2

C45100 DRB Meeting EC 75218 PH 2 Detension:

1/

175 DELDES21215 Incorporate Final DRB Comments 01/21/1003 01122/1003 24 045100 EC 75218 PH 2 Detansion: Obtain 76 DELDES21220 Erv75218pH 2 n

01/22/10 03101/22/1011 8

C45100 Supervisor Approval 75218 PH 2De Dreho

)20 6.1118/1020 75218 PH 2 Oet.n9io.

at16-O..1 for Fine, R

)20 01116/1020 75218 PH 2 Detr.alor ft / St" - DV

)20 061/18/10 20 EC 75218 PH 2 Detenoon:

knop *]Skatoon Co-t'ent V/10201 01119/1020 EC 75218 PH 2 8/1020 01119/1020 EC75618PH2Deten.Ionk Supv Pe.ie-Pr. to Final D 1/1t0 o0 01/20/1000 2 EC7#218PH2D Wv/0.:

Oi5b Final 0RB Pkq for R.

1/2011000 01/2011001 EC 75218 PH 2 Delnlsion:

Review Final DRB Pkg 1/20/1001 01/21/1001 EC752t8PH 20D0etion-Final DRS Maebrg 01/21/1001 01/2111003 EC 70218 PH 2 0atenslon:

756/npo0oa Fin0a ORB C-o 01/21/1003 01/22/1053 76 C 75218 PH 2 Ditensi08on obtain Supevoo Appova 01/22/1003 01/22/101l E7 C 75218 PH 2 Deten1lo:

MLESTONE-ANReview C "12 1fT10 03 01=221003 78 CC 75218 PH 2 DOelon:

SP00/ Appoval1 01/2*11011 01/23/1011 79 EC75218PH2D6tlansl.On

,PIO,101, Prepare EC Work P 01/23/1011 1/26/10 11 EC 75218 PH 2 DAete080 80 MILESTONE-OK to Start 7EC 75218 PH 2 Detension

i77 DELES MILESTONE - All Reviews Complete 01/22/10 03 01/22/10 03 0

C45100 I

78 179 80 81 DELDES21225 EC 75218 PH 2 Detension: Obtain PGM Approval DELDES21710 EC 75218 PH 2 Detension: Planning Prepare EC Work Packages EC 75218 PH 2 Detension:

DELDES214OZ MILESTONE -OK to Start Field Work DELDES3115N

-EC 75218 PH 3 Detension: Revise IWE/IWL Repair Plans 01/22/1011 01/23/10 11 01/23/1011101/26/1011 01/23/1011 01/23/10 11 12/30/09 18 01/13/10 15 24 G45100 72 C47100 0

C45100 20 C45100 81 -EC75218PH30eteWk 12 vs1 01/13WL Repair F 12m Is 01/13/10 15 I:

REarlyiyO.~pta Romt 28 '04 111 18I 25 01 '08

,15 122 01 08 15i 22 129 05 Doc Jan Feb Mar Apr PMe150o9-Actvt

_____________________Pag 5__________

P of5 18 January 04, 2010 05:16:37 PM Rev D

CR3 Outage Containment Repair Project - Level 3 Schedule fly Re-m I

Doc n

Feb

~" ~

' Flnish Owr 28 04 11, Is 25 01 08 15 22 01I Mar Row Actiit

-"rpi 22 29 05 08 1s 82 DELDES31027 EC 75219 PH 3 Removal: Review 01/04/100001/06/1014 48 C45100 30% Design Pkg 83 DELDES31 11 M

-EC 75219 PH 3 Removal: Develop 01/06/1014 01/19/1016 158 C45100 Final EC "Pkg for final DRB" 84 DELDES31O30 EC 75219 PH 3 Removal: 30%

01/07/100901107/1011 2

045100 Design Review Meeting EC 75219 PH 3 Removal:

85 DELDES312OZ MILESTONE - 30% Design Review 01/0711011 01/07/1011 0

G45100 Complete 186 DELDES3115M tuEC 75219 PH 3 Removal: MecV /

01/19/101601/25/1016 144 C45100 87 DELDES3120

-EC 75219 PH 3 Removal:

01/19/10 16 01/25/10 16 144 C45100 Inter-Departmental Reviews 88 DELDES3117 EC 75219 PH 3 Removal: lncorp 01/25/10 16 01/27/1013 45 C45100 Verification Comments 89 DELDES3123 EC 75219 PH 3 Removal: Incorp 01/25M10 18 01/27/1015 45 045100 Review Comments 90 DELDES319OZ EC 75219 PH 3 Removal: Milestone - 01/25/1018 01/25/1018 0

C45100 Issued for Final Review 91 DELDES3125 EC 75219 PH 3 Removal: Supv 01/27/10 15 01/27/10 19 4

045100 Review Prior to Final DRB 92 DELDES3125D EC 75219 PH 3 Removal: Distrib 01/27/1020 Final DRB Pkg for Review 01/27/10 19 1

G45100 U EC 7215PH 31 Review 30% Dee 01/04/1000 01/0 83-EC 75219 01/06/10 14 EC 75216 30% Deal 01/07/1O09 S C 75211 MILESTC

  • 1/07/10 11 gn Pkg 110 14 PH 3 Remorv

.1 EC "PIg f.

PH 3 P-ov 0t/071101' PH 3 R-mo 4E - 30% De0 01/07/101' 84 0,

a]

-EC 75219 PH 3 Removal:

'15/1016 01/2511081

-EC 75219 PH 3 Remova:

88 EC 75219 PH 3 Raem 9/

V.M..cow 5

890 Com"Me 01025/10 16 01/2711013 01/25/10 il 01027/1010 90EC 752W9 PH 3 Removal:

SMiles/o

- Issued for FR R 12511018 01025/1014 91 EC 75219 PH 3 Removal:

SU.v Roceve Prior to Fiial D 1017/10 15 01127/1019 EC 75219 PH 3 Removal:

192D5b Fia 9RB P9/9 for Re 01/27/1019 01027/1020 ECt5219PH3PRe/lovW Revieew FrailDRS kg 0127110 20 010/10 14 EC 75219 P113 Reeove:

Fk94 i

DRSB Mee" 101/30/1014 01130/1016 EC 75219 PH 3 Removal:

,eorpoetoe P.9O ORS Coemc 01/30/1016 2/01/10 16 EC 75219 PH 3 Removal:

2/0M0LESTONE

-All Revm 2/1110 16:* 02/01110 16 EC 75219' PH 3 Removal:

Obai o

lm rvsor*,

Appova 93 DELDES3125R 94 DELDES31205 95 DELDES31215 96 DELDES313OZ 97 DELDES31220 EC 75219 PH 3 Removal: Review Final DRB Pkg EC 75219 PH 3 Removal: Final DRB Meeting EC 75219 PH 3 Removal:

Incorporate Final DRB Comments EC 75219 PH 3 Removal:

MILESTONE - All Reviews Complete EC 75219 PH 3 Removal: Obtain Supervisor Approval 01/27/10 2C 101/30/10 14 01/30/1014 01/30/1016 01/30/10 1f 02/01/10 16 02/01/1016 02/01110 16 66 C45100 2

C45100 48 C45100 0

C45100 24 C45100 02/01/10 16 02/02/1016 0earito Early Str Eary Rom 28S Finish Dur 04 11 18 25 01 08 15 22 01 08 i5 22 29 05 Jan Feb Mar Aper kH,-W-Activily Pago6of 10 January 04, 2010 05:16:37 PM Rev D

Row.

-cbkt Desarpto CR3 Outa e Containment Repair Project - Level 3 Schedule E

RJan Feb

,Early S tar ur 289 04 1l 18 25 01 U

s 15 22 01 mar Apr 08 15 22 29 05 98 99 100 1101 DELDES31225 DELDES3171 0 DELDES314OZ DELDES41008D EC 75219 PH 3 Removal: Obtain PGM Approval EC 75219 PH 3 Removal: Planning Prepare EC Work Packages 02/02/10 16 02/03/10 07 02/03/10 07 02/06/10 07 02/03/10 07 02/03/10 07 15 C45100 72 C47100 0

C45100 67 C45100 EC 75219 PH 3 Removal:

MILESTONE - PGM Approval EC 75220 PH 4 Replacement: 30%

Design Challenge Pkg Review 12/30/09 14!01/07/10 09 10 C 15220 PH4 01 30% Daigr 12/3M0/091=4 01otemo 00 EC 75220 PH 4 Replacement:

102 DELDES41IIM Develop70% EC PkgforDesign 01/13/1015101/22/1015 216 C45100 Challenge EC 75220 PH 4 Replacement:

103 DELDES4-0011 AREVA Review & Revise Calc 01/15/100901/31/1023 398 C45100 S06-0007 for Liner Plate EC 75220 PH 4 Replacement:

104 DELDES4-0010 AREVA Issue Reinforcement 01/15/10 09 01/31/10 23 398 C45100 Calc/Dwgs 105 DELDES4-0014 EC 75220 PH 4 Replacement:

AREVA/MPR Revise Calc S06-0004 01/15/1009 01/31/1023 398 045100 108 DELDES4-0013 EC 75220 PH 4 Replacement: Void 01/15/1009 02/03/1023 470 045100 Catc S09-0025 EC 75220 PH 4 Replacement:

107 DELDES4-0008 AREVA Design Additional 01/15/10 09 01/20/10 23 134 045100 Reinforcement for Deaim Area EC 75220 PH 4 Replacement:

108 DELDES4-0006 AREVA Design Radial Reinforcement 01/15

/ 10 0 9 01/20/10231 134 C45100 EC 15220 1113/10 is 10 4 3 C 7S; 1 0 0 0EC75:

01EC 115 011151100 EC 75219 PH 3 R.eWva:

Obtai PG#J App-vi 621 l i 02103/10:07 S

02/02/1016 20210 EC 7t219PH3ReOovl:

99 n Prepa-e EC Work P 0//1 l

02/W/1007 00 EC 70219 PH 3 R.eovl:

SM LESTONE - PGM AM-10 07 02103M3007

,H4 95 Ovdo 70%

01/22/Oi I 20 PH4l wnewt AREVA 20 PH 4i wvt AREVA 1-o 01/81/1023 20 PH 4:

.eift. AREVAMNPR 20 PH 4i

-t VD Calc S09 MMMVI. 3

/01151 010023 109 110 1111 DELDES4-0009 DELDES4-0022 DELDES4-0021 EC 75220 PH 4 Replacement:

AREVA Revise Existing & Create New Reinforcement Dwgs EC 75220 PH 4 Replacement: MPR Revise Calc S09-0048 EC 75220 PH 4 Replacement: Void Calc S08-0008 EC 75220 PH 4 Replacement:

AREVA Revise Calc S09-0044 01/15/10 09 01/20/10 23 01/15/10 09 01/31/10 23 01/15/10 09102/09/10 04 134 C45100 398 C45100 595 C45100 OEc 7!

01/1t/10 (

01/15/10(

01/1/70!0 1c 71C 20PH4 AREVA 015201*023 20 PH 4

... t AREVA OIIMI0/023 20 PH 4 iwllS MPR Revise 20 PH t

-it/ Void Ca/c S0B 02/0W/1004 112 DELDES4-0024 01/15/10 09101/31/10 231398 C45100 112=/AREV 1113 DELDES4-0018 EC 75220 PH 4 Replacement:

AREVA/MPR Revise Calc S06-0005 1

01/15/10 09ý 01/31/10 23 398 C45100 113 EC 7,= 00 PH 4

-~ot AREVAMAPR MM0Il 1 23 My________________

t.

Early 28 04 is a8 25 01s 1

22 01 U8 15 22 28 U5 Row

~fl hOS* O0 1

110

_ __ _ _ _is F

h r

Doc Jan Feb Mar Apr LoP" 7t A

+______________

Pog7of 1(

L January 04,2010 05:16:37 PM Rev D

CR3 Outa e Containment Repair Project - Level 3 Schedule Row Aiamý W

I Doc J28

  • Feb Mar Aptr iio 25~~t 01a o

08f

15.

22a 01 8

4 112 08 1s 22 29 0

114 115 116 117 DE:LDES4-0016 DELDES4-0020 DELDES4-0002 DELDES41008B EC 75220 PH 4 Replacement: MPR Revise Calc S06-0002 EC 75220 PH 4 Replacement: Void Calc S06-0006 EC 75220 PH 4 Replacement: SGT Revise Formwork Spec CR3-C-0002 01/15/1009 01/15/10 09 01/15/1009 01/15/1009 01/31/1023 02/09/1004 02/02/10 23 01/15/10 09 398 C45100 595 C45100 446 C45100 0

C45100 Sýc 75:

01115/10 01 1 15EC 75:

01115110 0

16 C 75; 1R"P 118 cc 75:

11C 75.

1t9 EC 75i 01/15110(/

EC 75220 PH 4 Replacement:

Receive Design Input on Form Work from SGT 118 DELDES4-0001 EC 75220 PH 4 Replacement: SGT 01/15/10 09 02/02110 23 446 C45100 Revise Formwork Calc S08-0021 EC 75220 PH 4 Replacement:

119 DELDES4-0004 AREVA Revise Concrete Spec 101/15/10 09 01/20/1023 134 C45100 CR3-C-ooo3&Verify Mix Dan EC 75220 PH 4 Replacement: Owner 120 DELDES4-0005 Accept Revised Concrete Spec 01/20/10 23 01/21/10 23ý 24 C45100 CR3-C-0003 EC 75220 PH 4 Replacement:

121 DELDES4-0000 Receive Desgn Input from PII Root 01/21/10 19 01/21/10 21 2

C45100 Cause Analysis EC 75220 PH 4 Replacement:

122 DELDES4111M3 Receive Preliminary MPR Analysis 01/22110 13 01/22/10 15 2

C45100 Input 123 DELDES4115M EC 75220 PH 4 Replacement: Mech 01/22t101501124/1015 48 C45100 Struc - 70% DV 124 DELDES4120 EC 75220 PH 4 Replacement:

01/22/10 15 01/24/10 15 48 C45100 Inter-Departmental 70% Reviews 20 PH 4 MPR R-i.

20 PH 4:

20 PH 4:

-00nt: SGT Re0A.e D=10211523 20 PH 4 0o1151t009 20 PH 4

.e06 SGT Revise 020211023 20 PH 4i 0M-AREVA 01/0/10 23 1, EC 75220 PH 4

-elwmf OwmAccp 21120/1023 01/2111023 121 EC 75220PH 4 1 RR*-e-e-t Rmee 01M21010 19 01021110 21 122 fC 75220 PH 4 Relameent Receive 0112/10 13 01=22/1015 123 iC 75220 PH 4 SRq'a~,e e

di I Stt 0

0122/10 15 01/24/1015 124 C 75220 PH 4 Re~ce-vt 0122/10 15 0112411015 1 EC 75M PH 4

  • .1122110 15 0122/10 15 26 EC 75220 PH 4 pepk.eWt h-rp 7o0 r1/24/10 15 0125/10 15 E

C 7522 0

PH 4 RO008MWC -~

70%

01124/1015 01125110 15 EC75220 PH 4 01128t10 14 02/0/10 15

,16EC75220!PH4 01"2Rep1112 02, 03~ AI 01/31/1023 02(03/1023 125 DELDES4190Z 126 DELDES4123 127 DELDES4127 128 DELDES4111M2 129 DELDES4-0025 EC 75220 PH 4 Replacement:

Milestone - Issued for 70% Review 01/22/1015101/22/1015 0

C45100 EC 75220 PH 4 Replacement: lncorp 70% Review Comments EC 75220 PH 4 Replacement: lncorp 70% Verification Comments EC 75220 PH 4 Replacement:

Develop Final EC "Pkg for final DRB" EC 75220 PH 4 Replacement: Owner Accept Revised Calc S09-0044 01/24/1015101/25/10 15 01/24/10 15 01/25/10 15 01/28/10 14 02/05/10 15 01/31/10 23 02/03/10 23 24 C45100 24 C45100 193 C45100 72 C45100 Early 28 04 11 18 25 01 08 15 22 01 08 15 22 29 05 Row D_____

Finish Our Doc Jan Feb Mar Apr Leg weweov h,-Poogm.s if

______________P*~of 1l January 04, 2010 05:16:37 PM Rev D

CR3 Outage Containment Repair Project - Level 3 Schedule E ty R...e.

Jim Feb 4

1 Finish D,2 0

1t 25 01 08 15 22 01 Mar Apr 08 15 22 29 05 Raw Ac~ivt Desallptla 130 DELDES4-0023 131 DELDES4-0007 132 DELDES4-0012 1133 DELDES4-0019 EC 75220 PH 4 Replacement: Owner Accept Revised Calc S09-0048 EC 75220 PH 4 Replacement: Owner Accept New Reinforcement DesIgn/CaIc 01/31/10 23 01/31/1023 02/03/1023 02/02/1023 72 C45100 48 C45100 48 C45100 72 C45100 I

EC 75220 PH 4 Replacement: Owner Accept Revised Calc S06-0007 for Liner Plate EC 75220 PH 4 Replacement: Owner Accept Revised Calc S08-0005 01/31/1023 01/31/1023 02/02/1023 02/03/1023 134 DELDES4-0017 EC 75220 PH 4 Replacement: Owner 01131/1023 02/03/1023 72 C45100 Accept Revised Calc S06-0002 135 DELDES4-0015 EC 75220 PH 4 Replacement: Owner 01/31/1023 02/03/1023 72 C45100 Accept Revised Caic S06-0004 EC 75220 PH 4 Replacement: Owner 136 DELDES4-0003 Accept Formwork Spec CR3-C-0002 02/02)102302/03/1023 24 C45100

& Calc S08-0021 EC 75220 PH 4 Replacement:

137 DELDES4111M1 Receive Approved MPRAnalysis 02/05/10 13 02/05/10 15 2

C45100 Input 138 DELDES4120A EC 75220 PH 4 Replacement: Final

/05/101502/09/1016 97 C45100 Inter-Departmental Reviews 139 DELDES4115M1 EC 75220 PH 4 Replacement: Final 02/05/10 1502/09/1016 97 045100 Mech / Struc - DV 140 DELDES4117F EC 75220 PH 4 Replacement: lncorp 02/09/101602/10/1016 24 C45100 Final Verification Comments EC75220 PH 4 01/31/1023 02W03/1023 EC 75220iPH 4 131

~

O.e~Hp 01/31/10 23 02/02/1023 1 2 EC 75220 PH 4 MR.pa.mW& 0-A.oqA 01/31/1023 02/0W1023

,,E C 7 5 2 2 0 P H 4 01/31/1023 02/03/1023

,134 EC 752PH 4 01/31/1023 02/0311023 1

EC 75220:PH 4 3Replacenvt: O.ý Ao 01/31/1023 02/0311023 1 EC 7IP20 PH 4 02/02/ 103 02/52/1 023 137 EC 75220 PH 4 02/06/10 13 02/W510 15 138 EC 75220 PH 4 1 39EC 75=0 PH 4 02/05/1015 02/09/10 16 140 EC 75220 PH 4 Rep-et

-rop Final 02/00/1016 02/10/1016 141 EC 75220 PH 4 Replavevt /ncoP Fke 02/05/10 16 02/110 16 142 EC 7220 PH 4 SRpaceneant Oe Re/4ew 02/1J/1016 02JI0/1020 144 EC 75220 PH 4 Repl.mt Debtw FkW~

02/101020 02/11/1021 144 EC 75220 PH 4 SRq,/anme R/0r R/n*

02/10/1021 02/11/1021 14 C75220 PH 4 Repl F-t au DRB Me 02/11/1021 02/11/1023 141 142 143 144 145 DELDES4123A DELDES4125 DELDES4125D DELDES4125R DELDES41205 EC 75220 PH 4 Replacement: Incorp 02/09/1016 Final Review Comments EC 75220 PH 4 Replacement: Supv 02/10/10 16 Review Prior to Final DRB EC 75220 PH 4 Replacement: Distrib Final DRB Pkg for Review 02/10/1020 EC 75220 PH 4 Replacement:

02/10/1021 Review Final DRB Pkg EC 75220 PH 4 Replacement: Final 02/11/10 21 DRB Meeting 02/10/1016 02/10/1020 02/10/10 21 24 C45100 4

C45100 1

C45100 02/11/1021 02/11/10 23 24 C45100 2

C45100 S28 04 11818 25 01 08 15.

22 01 08 15 22 29 05 WSS Finish O

Dec Jan Feb Mar Apr Peasoh*

January 04, 2010 05:16:37 PM Rey D

CR3 Outa e Containment Repair Project - Level 3 Schedule Rom DOc Jan Feb Mar Apr F.....

.Was 2e 04.....

is 25 01

,08 15 1

22 01 1

08 o

is 1.

2 29.

05 Row Activit Demcripta 146 DELDES41215 EC 75220 PH 4 Replacement:

Incorporate Final ORB Comments 147 148 149 DELDES413OZ DELDES4122O DELDES41225 EC 75220 PH 4 Replacement:

MILESTONE - Al Reviews Complete EC 75220 PH 4 Replacement: Obtain Supervisor Approval 02/11/1023 02/12/10 23 02/12/1023 02112/1023 02/12/1023 02/13/1007 24 C45100 0 C45100 8

C45100 24 C45100 EC 75220 PH 4 0211/1023 021210 23 1 4 7 EC 75220 PH 4 Retaoenmten MILESTONE

.2/I10 23 0211023 148EC 75220 PH 4 02112/1023 02/13/1007 149 EC 75220 PH4 ReOlaosaweec Obtain PGM A a02/13/1007 02/14/1007 EC 7S220 Reptaeo MILESTONE

- PGM A,0 ti14/10 07 02/14/1007

'51 EC 75220 PH 4 02r14/1007 02/1711007 EC 75220 PH 4 Replacement: Obtain 02/13/10 07 02/14/10 07 PGM Approval 150 DELDES414OZ EC 75220 Replacement MILESTONE 02/101007i02/14/10 07 0

C45100

- PGM Approval 151 DELDES41710 EC 75220 PH 4 Replacement:

Planning Prepare EC Work Packages 02/14/10 07 02117/1007 72 C47100 152 DELDES510Z EC 75221 PH 5 Retension:

01/15/1007 01/15/1007 0

C45100 MILESTONE - Start Projecr 0

153 DELDES51005 EC 75221 PH 5 Retension: Prep /

01/15/10 07 01/15/10 09 2

C45100 Cplt Validation Plan w/Supv

'154 DELDES51008 EC 75221 PH 5 Retension: Develop 01/15/100901115/1011 2

C45100 Project Tm / Kick-Off Mtg 155 DELDES51020M EC 75221 PH 5 Retension: Develop 01/15/10 11 21/1000 133 C45100 Draft Pkg for Conceptual DRB 156 DELDES51600 EC 75221 PH 5 Retension: ID Long 01/20/1020 01/21/1000 4

C45100 Lead material to Procurement 0

20_01/21 1

EC 75221 PH 5Rtotension:

5 MILESTONE - Start Project 1/15/1007 01/15/1007 153 EC 75221 PH 5'Reteootoe:

Prop I CPR voidae. Plan w/

01/1/1007 01115/10 09 154 EC 75221 PH 5*Re*io:

Develop Prlo Tr /

01/15/1009 01115/10 11 156 EC 75221 PH 6.lNnnon:

Daft Pkg for 01115/1011 01/21/1000 15 EC r5221 PH 5 Rt..io.:

ID lon LWead matiaI to Pro 01 20/1* 20 01121/10Go 157 EC 75221 PH 5 Ratenoon:

ODeeop Fknal EC Pkg for 01/21/1400 01/22/012 1 58EC 75221 PH 5 R.Wtonad:

014/tot.e C--pbW ORB 01,21/1100 0101/10008 15, EC 75221 PH 5 Retantson:

Rneelw coept ORS Pk 01/21/11 08 01/22/1000 160 C 75221 PH 5 Roleseton.

'onocephia DRO Meeing 0112V110DO 01=221008 EC 75221 PH 5 R

tension MeLESTONE cO oncep2tua 157 158 159 160 161 DELDES5111M DELDES51025 DELDES51027 DELDES51030 DELDES5120Z EC 75221 PH 5 Retension: Develop 01/21/1000 Final EC *Pkg for final DRB EC 75221 PH 5 Retension: Distribute 01/21/1000 Conceptual DRB Pkg for Review EC 75221 PH 5 Retension: Review 01/21/1008 Conceptual DRB Pkg EC 75221 PH 5 Retension:

01/22/1006 Conceptual DRB Meeting EC 75221 PH 5 Retension:

MILESTONE - Conceptual DRB Mtg 01/22/10 08 Cplt / Waived 01/2210 12 36 C45100 01/21/10 08 8

C45100 01122/1008 24 C45100 01/22/1008 2

C45100 01/22/1008 0

C45100 Raw De S

Early Ro 2

04 11 1s 25 01 08 1,

15 22 01 08 I5.

22 29 05 Finish...

Jan Feb Mar Apr Pge 10 f 1W-Po, Ppag 10n oft1 January 04, 2010 05:16:37 PM Rev D

4 CR3 Outa e Containment Repair Project - Level 3 Schedule 28 04 11 18 25 01h 08 15 22 01 08 Mar Ap Row Activity 0ecrp 15 22 29 05 EC 75221 PH 5 Retension: Milestone

- Issued for Final Review 01/22/10 12101/22/10 12 0

C45100 163 DELDES5115M 164 DELDES5120 EC 75221 PH 5 Retension: Mech /

Struc - DV EC 75221 PH 5 Retension:

Inter-Deparlmental Reviews 01r2211012 01/22/1012 01/2611012 01/26/10 12 96 C45100 96 C45100 165 DELDES5117 EC 75221 PH 5 Retension: Incorp 01/26/1012101/29/1013 73 C45100 Verification Comments 166 DELDES5123 EC 75221 PH 5 Retension: Incorp 01126/10 12 01/29/10 13 73 C45100 Review Comments 167 DELDES5125 EC 75221 PH 5 Retension: Supv 01/29/10 13 01/29/1017 4

C45100 Review Prior to Final DRB 168 DELDES5125D EC 75221 PH 5 Retension: Distrib 01/29/1017 01/29/1018 1

C45100 Final DRB Pkg for Review 169 DELDESS125R EC 75221 PH 5 Retension: Review 01/29/10 1801/30/1018 24 C45100 Final ORB Pkg EC 75221 PH 5 Retension: Final 170 DELDES51205 EC 72 HRnni 01/30/10 18 01/30/1020 2

C45100 ORB Meeting EC 75221 PH 5 Retension:

171 DELDES51215 ICorprat Fn O Cont 01/30/10 20 01/31/10 201 24 C45100 Incorporate Final DRB Comments 172 DELDES513OZ EC 75221 PH 5 Retension:

MILESTONE - All Reviews Complete 01/31/10 2001/31/1020 0

C45100 173 DELDES51220 EC 75221 PH 5 Retension: Obtain 01/31/10 20 02/01/10 04 8

C45100 Supervisor Approval EC 75221 PH 5 Retension: Obtain i174 DELDES51225 PG prvl02101/10 04 02/02/10 04 24 C45100 PGM Approval 175 DELDES5140Z EC 75221 PH 5 Retension:

02M0/0 04 02/02/10 04 0

C45100 MILESTONE - PGM Approval 176 DELDES51710 EC 75221 PH 5 Retension Planning 02/02/100402105/1004 72 C47100 Prepare EC Work Packages 1eC P

5221PH9R e

  • 01/2*J10 12 01- /0t I

01=210 12 16 tC 75221 PH 5 Rebaesbo:

w -OV 0109/1012 164 eC 75221 PH 5 R.W.eee:

01/2I=1012 01/1012 165 EC 75221 PH 5 Re041kee o106/o12 01*09/01 166 EC 75221 PH 5 Rael-e 0106/1012 0129/10 13 I16 EC 75221 PH 5

R.I.Vio.:

0.9Sp1 R.ei P/joe to F81a/0 01/29/1013 0109/1017 167 EC 75221 PH q Rtensiono 0/06 Revie wRB Phog foF Re 0109/1017 0129/1018 EC 75221 PH 6 Rotenao:

Review Final OR8 P89g 01/M1017 01030/1018 I EC 75221 PH$ Reltaeoe:

70 Fina ORB MPoSng 0130/101I s

l/r0/1020 171 EC 75221 PH 5 Reh-ion:

In*oal e P, ORB CorM 010/1020 01W/10 20 I72 EC 75221 PH 5 Reteesion:

MILESTONE -AD Reviews C 1031/0120 01031/1020 1 73 EC 75221 PH 5 Retensioh:

Obtan S.-I AW-oW 0101/1020 02/01/1004 1 7 4 EC 75221 PH 5 Rfealo.:

Obtai PO8A Appew4/

02/01/10 04 02/02/10 04 1 7 5 EC 75221 PH 5 Reteei-MILES70NE -PON!M p

  • 2/02/104, 02/02/084 17600 75291 PH 5 Reteoe

.PLanuin Piepe EC Work P 02/02/10 04 02/05/1004 Row Acivt Description Eary Star Early Rom Finish OirWS 28 04 11 18 25 01 08 15 22 01 08 15 22 29 05 fleC Jon Fwh Moe

  • kl*r Doc Jan Feb Mar Ant January 04, 2010 05:16:37 PM PFge 111 of Rev D

RawActivity CR3 Outage Containment Repair Project - Level 3 Schedule 2n S4 11ty 2n 01 6

Jan Feb Finish DIur" 1104 I

18 25 01 08 15 22 01 Mar 14 Is A2r 22 29 05 Contrac1CngCSubconacng/Pcurem 02081017 02081017 0

C51400 178 DELCONLIM ant Complete MILESTONE

180 DELCON23

-Develop Contract SGT 12/04109 07 01/05110 151 9

C15100 181 DELCON26 Contract Mailed to SGT for signature 01/05/1015 01/05/1015! 0 C15100 Execute Contract & Receive Signed 01A)6/1007 16 C15100 182 DELCON29 Contract From SGT 183 DELCON31 SGT Contract In Place 01/07/101501/07/10 15 0

C15100 185 DELCON09

-Award Hydro-Demolition Contract 12/04/09 19101/15/10 17 267 C52410 cepeeMILE 1SO -lSOevlp Co.*ao /03 1200410007 01/W010 15 181 bwM1 E-1

/

ft 0 1 Ca 102 con 010/W1007 103 SGT coo 4*1107I10 15 18 Ae-d Hy00dr seý o 12/04M00 19 01/15/1017 187 -Awa4 0.410 P/001/20100 d b SGT 1.1 tad &01 0/27

)1107/1015 01/07/1015 4/115/10 17 01115110 17 186 187 188 DELCON09M DELCON 11 DELCON11M Award Hydro-Demolition Contract Compl MILESTONE

-Award Batch Plant Contract Award Batch Plant Contract Compi MILESTONE 01/15/1017 01/15/1017 0

C52410 12/04/09 19 02/08/10 171 843 C52400 02/W0101702/01017 0

c52400 1/144 1i 010m,/1 11D 10Cel MILESTON4E 190 DELPRO-006

-Procure Forms 12/2410909 01/21/1009 403 C51400 191 DELPRO-006M Procure Forms Compl MILESTONE 01/21/1009 01/21/10 09 0

C51400 192 DELPRO-005

-EC-ED 75309 Procure Rebar/Crimp 01/04/1014 02/01/1014 672 051400 193 DELPRO-001

-EC-ED 75309 Procure Concrete 01/04/10 14 02/01/10 14 672 C51400 I

190 -P-e F-12/24/I9 09 0102110 009

  • MILESTONE5 1121110 09 0102111009

-S

-EC-Eo 75309 ionse 01/04/10 14 02111014 13 -SC-SD 753091 *~OCure 93 1/101 01/.41 II4 0/1110 14 194 DELPRO-005M EC-ED 75309 Procure Rebar/Crimp MILESTONE Raw' AdctMy DOOMPIllon 02/01/10 14102/01/1014!

0 051400 Finish Du 104 EC-ED 70300 Procur

  • 2 Re~a/C41 MILESTONE

-2101/10 14 0201/10 14 28 04 11 1

25 01 08 15 22 01 08 15 22 28 05 nan Jan Fab Mar Pare 12 ofI January 04, 2010 05:16:37 PM Rev D

CR3 Outage Containment Repair Project - Level 3 Schedule tIm Earty 28m 4

I1 1

Dec 0I Ja 1

Feb Ffh Dw j

28 04 11 s1 25 01 011 15 22 01 Mar Apr iRow Acivt D"Criptia 08 1s 22 29 05 195 196 197 198 DELPRO-001M DELPRO-004 DELPRO-002 DELPRO-003 EC-ED 75309 Procure Concrete Mix Compi MILESTONE

-EC-ED 75308 Procure Grease

-EC-ED 75308 Procure Tendons

-EC-ED 75308 Procure Conduit 02101/11014 021/1014i 0

C51400 12/25/09 18 12/25/09 18 01/22/10 18 436 051400 01/22/1018 436 C51400

-EC-ED 70W308 Plon 1215010018 0122110 18 1

C-GEED 75308 Pr°.0 1212510 18 01/22/10 18

-S

ýEC-ED 703081Proa 12r25=00 18 01=2210 10 12/25/0918 01/22/10 18 436 C51400 i

dbc°'*

MILST C1020141014 1osEC-ED 76M P-.on

  • 1r.t aI 011221101is 20SC-ED 75304 P-.o
  • 'T140.d-C0.PI MILESTON 219 C-ED 75308 P-o.u
  • 12*2/I018 01122/1010 rod6 C-0 CoMILESTONE mio2/1 is 01f22/1 is 199 DELPRO-004M 200 DELPRO-002M 201 DELPRO-003M EC-ED 75308 Procure Grease Compl MILESTONE EC-ED 75308 Procure Tendons Compl MILESTONE EC-ED 75308 Procure Conduit Compi MILESTONE 01/22110 18 01/22/1018 0

C51400 01/22/1018 01122/10 18 01/22/10 18 01/22/1018 0

C51400 0

C51400 203 204 DELRPI-0030 DELRPI-0031 EC 74801: Remove 8 Displacement Gauges In S/G Opening & 2 in two 4" 02/19/10 07 Cores 51&81A EC 74801: Remove 22 Strain Gauges In Five 8" Cores 6AA, 30, 02/20/10 07 57A, 84A & 92 02119/10 19 12 C51400 02/20/10 19 12 C51400 205 206 207 208 DELRPI-0025 DELRPI-123A DELRPI-0026 DELRPI-121A EC 74801: Dome: GPR, Prep, Form

& Grout Repair at 7 Core Drill 102/22110 07102/23/10 071 24 C51400 Locations EC 74801: Non-Delam Bays 5-6:

GPR, Prep, Form & Grout Repair at 9 02/23/10 07 02/24/10 19i 36 C51400 Core Locations EC 74801: Dome: Strip Forms at 7 02/24/10 01 02/24/10 07 6

C51400 Grout Repair Locations EC 74801: Non-Detamn Bays 4-5:

GPR, Prep, Form & Grout Repair at 9 02t24/10 19 02/26/10 07 36 C51400 Core Locations I

0 20 3 EC 74801: Rove 8 1I ODbpk-et G-uge In SG 029/10007 02JI0110 19 2

EC 74901: R-22 24Strý GeIn.Ft.e W 02r20/10 07 0212010 19 2-s EC 74801: 0-.e: GPR.

Po Prep. Fo

& Grot Repir 02122 1007 0212211007 206 EC 74801: Non-Oe=a. Says 5-6: -PR. Prp, Foe &

02r"1'0 07 02124010 19 207 EC 74801: Do1e3: S0 I

Fo at 7 G-oA Rep*S L0c 02r2411001 02/24/1007 EC 74801: Non-D0.e1 Say.

4-5: GP, Pop, For- &

021241 019 0212011007 209 EC 74D01: No.-091. Says

~~5-6:

Sbp Fr-m of 9 Grot 0212011013 0251210 10 210 EC 74801: Non.Oal Say.

"G-1: GPR, Pop, Foo &

0212011007 02128/1019 1s 25 01 08 15 22 81 Do Is 22 29 05 209 DELRPI-123B EC 74801: Non-Delain Bays 5-6:

Strip Forms at 9 Grout Repair 02/25/10 13 Locations EC 74801: Non-Delam Bays 6-1:

GPR, Prep, Form & Grout Repair at 02/2611007 16 Core Location 02125/10 19 6

C51400 02/28/10 19 60 C51400 210 DELRPI-124A I

Row Acd i

ty Description Early Start Eal Rom Flinis Dwwa 28 04 11 Doc Jan Feb Mar Apr Milson.e Page 13 ofI1 January 04, 2010 05:16:37 PM R00D

[Row

-Ac~-t-y

--- Dsr CR3 Outa e Containment Repair Project - Level 3 Schedule Early Star

,Ery]

De "n

0 0

Feb 15 22 0.

Mar Apr 08 15 22 29 05 211 DELRPI-121B

[212 DELRPI-125A EC 74801: Non-Delain Bays 4-5:

Strip Forms at 9 Grout Repair Locations EC 74801: Non-Delam Bays 1-2:

GPR, Prep, Form & Grout Repair at 5 Core Locations 02127/1001 02128/1019 02/27/1007 03/01/1019 6

C51400 24 C51400 12 C51400 36 C51400 213 214 DELRPI-124B DELRPI-120A EC 74801: Non-Delain Bays 6-1:

Strip Forms at 16 Grout Repair Locations EC 74801: Non-Delamn Bays 2-3:

GPR, Prep, Form & Grout Repair at 8 Core Locations 03/01/1007 103/01/10 19 03/01/1019 03/03/10 07 2 1 EC 74801: No n-Detan Bays 5:S Forot 9 s

Grou 0212711001 02/2711007 212 EC 74801: Nos-Oe.

h ys 1-2: GP, prop. Fom &

02J29/10 19 03)0111019 EC 74801: Non-OD1am Bays 16-1: SrFormsat16Grout 03)0111007 03101110 19-214 EC 74801: Non-Doton. Bays M 2-3: GPRA.

P*p.

F-on 03101/1019 03103/0 07 215 EC 74901: Non-DeO1. Bays

, 1-2: Ship F-.1t15 Grout 03/10 13 03102/10 19 21, EC 74801: De.al Fey. 3-4:

GPR. P1p, Fo

& Grout 0303110 07 03/0/t1019 2, EC 74801: Nos-(1.on Bays 2-3: Srip Foros at SGrut 03IW1001 03041007 218 EC 74801: Deom Bays 3-4:

a Sltrp Foss. at 19 Grout 03/B/1l001 03M6100/19 EC 74801: Non-Delain Bays 1-2:

215 DELRPI-125B Strip Forms at 5 Grout Repair 03/02110 13 03/02110 19 6

C51400 Locations EC 74801: Delaim Bays 3-4: GPR, 216 DELRPI-0004 Prep, Form & Grout Repair at 19 03/03/10 07 03/05/10 19 60 C51400 Core Locations EC 74801: Non-Delain Bays 2-3:

217 DELRPI-120B Strip Forms at 8 Grout Repair 03/04/10 01 03/04/10 07 6

C51400 Locations 218 DELRPI-130 EC 74801: Detam Bays 3-4: Strip 03/06/10 01 03/06/10 19 18 C51400 Forms at 19 Grout Repair Locations 219 DELDES11711 EC 75000 Verification of WO Prior to 01/11/1007 01/1511007 96 C51400 Field Work EC 75000 Ph 1: Contractor 01/15/10 07101/29/1007 336 051400

ý220 DELIMP06 Implement Concrete Cut 221 DELIMP07M EC 75000 Contractor Cleared to Start 01/15/10 0701/15/10 07 0

C51400 Field Work MILESTONE 219 01/1 E 75000M Vrl/99.".

oWO k" to Fla/d Work 111007 0111511007 220 EC 75000 Ph l:*Cnrat 01/1010 07 01/A511007 222 DELIMP06M 223 DELDES21226 224 DELIMP09M 225 DELIMP08 226 DELIMP08M EC 75000 Ph 1: Contractor Implement Concrete Cut Compl 01/29/10 07 MILESTONE EC 75218 Verification of EC Prior to 01123/1011 Field Work 01/29/1007 01/28/1011 0

C51400 120 C51400 EC 75218 Contractor Cleared to Start Field Work MILESTONE 01128/10 11 01/28/10 11 0

C51400 222 EC 75000 Ph 1: Contor

.129/1007 01129/1007 22:EC75218 Vo.V1/lcon of EC 5Prir to Fildd Work 01

,1 01/28t1011 4 EC 75218 Contracto 22 09.40 to Sht Feld Work 1*1128110011 01121/1011 22C EC 77218 Ph1 2So, o

01210 13 0221210 13 22 EC 75218 Ph 2: Co.rior*

  • n-n trdnC.

EC 75218 Ph 2: Contractor Implement Detension EC 75218 Ph 2: Contractor Implement Detension Compl MILESTONE 01/29/10 13102112/10 131 336 C51400 02/12/1013 02/12/10 13 0

C51400 Eary Rom W___

20 04 11 18 25 01 08 15 22 01 08 15 22 29 05 Finish Or r DDc Jan Feb Mar Apr 4*

Page 14 of 14 January 04, 2010 05:16:37 PM Rev D

CR3 Outage Containment Repair Project - Level 3 Schedule Fail Rom I

Doc Jan Feb Mar Apr Raw Ac~ft Early Stlu Fiis DrWSD 2i 04 11 18 25 01 08 15 22 01 08 15 22 29 05

+

227 DELDES31226 EC 75219 Verification of EC Prior to 02o030100 Field Work 02/08/1007 120 C51400 02/08/10 07 0

C51400 228 DELIMP11M EC 75219 Contractor Cleared to Start 02/08/10 07 Field Work MILESTONE 9 DELIMP10 EC 75219 Ph 3: Contractor Implement Removal 230 DELIMP10M EC 75219 Ph 3: Contractor Implement Removal Compl MILESTONE 231 DELDES41226 EC 75220 Verification of EC Prior to 02/14/10 07 Field Work 232 DELIMP17M EC 75220 Contractor Cleared to Start 02/19/1007 Field Work MILESTONE 233 DELIMP12 EC 75220 Ph 4: Contractor 02/19/10 11 Implement Forming 02/19/10 07 120 C51400 02/19/10 07 0

C51400 02/27/10 13 192 C51400 EC 75220 Ph 4: Contractor 234 DELIMP12M Implement Forming Compl 02/27/10 13102/27/10 13 0

C51400 MILESTONE 235 DELIMP14 EC 75220 Ph 4: Contractor 02/27/10 13 03/09/10 13 240 C51400 Implement Placement 236EC 75220 Ph 4: Contractor 03/09/10 13 03/12/10 13 72 C51400 Implement Cure EC 75220 Ph 4: Contractor 237 DELIMP14M Implement Placement Compl 03/09/10 13 03/09/10 13 0

C51400 MILESTONE Field WoOf 02/03/1007 02,MW/10 07 228 EC 75219 Contbaclr 22 C/ared toS.tW FeIld Wok

  • 2*/01007 02108/ 007 EC 75219 Ph 3* C 02/12/10 13 D0 9f10 13 230 EC 75219 Ph 3, Cm000
  • "/19I10 13 02/19110 13 231 EC 75220 Vedcflaton of EC Prio to FWe Work 02(14/1007 02/1911007 EC 75220 Coro."

2 leared o St0r Feld Worl

  • 2/ 1/1007 02/19/1007 233 75220 Ph 4! Contracor 02/19/10 13 02/2711013 2EC 75220 Ph4: Conractor know-rao Fwondo Coo/If M

.227/10 13 02/37110 13 235EC 75220 Pho4: Con9/o 02/27/1013 03/09/10 13 237 EC 75330 Ph 4 Co4rdror 220 r o't,'I, C Cro 03/0010 1:

01210

/13 2

31 7EC 75220 Ph4, ContOdO plerr-do C-G-AML 311J10 13 0312/10 13 EC 75231 Voliao of EC Prior topFied Work 0202110 04:

02107/1004 X EC 75221 Con/odo 4

-0 Coed to 3t1. F/a/d Wort 4 07110 0402/07/100.

241 EC 75221 Ph 5: CoOodctor 031/1021 03/21/1021 22D oIColohnet Rep&/

03/2111021 03/28/1021 238 DELIMP16M 239 240 241 242 DELDES51226 DELCLOL2M DELIMP18 DELIMP20 EC 75220 Ph 4: Contractor Implement Cure Compt MILESTONE EC 75221 Verification of EC Prior to Field Work EC 75221 Contractor Cleared to Stan Field Work MILESTONE EC 75221 Ph 5: Contractor Implement Tension Demob Containment Repair Project 03/12/10 13

/002/10 04 02/07/1004 03/12/1021 03/21/1021 03/12/10 13 0

C51400 02/0711004 120 C45100 02/07/10 04 0

C45100 03/21/1021 216 C51400 03/28/1021 168 C75100 Rem.

El 28 04 11 18 25 01 08 15 22 01 08 15I 22 29 05 Raw__________________Finish________

-Dec Jan Feb Mar Apr Legend:

Me1t.0es k,1_

AP4d1y 4*

~Papg 15 of 1, January 04, 2010 05:16:37 PM Rev D

CR3 Outage Containment Repair Project - Level 3 Schedule y

Rom I

Dec Feb I

FRow ActilYty Mar Apr I-Finih Dur nI 0

11 16 25 01 08 Is 22 01 08 15 22 29 05 EC 75221 Ph 5: Contractor 243 DELIMP18M Implement Tension Compi MILESTONE 244 DELIMPUM Contractor Implement Consti Complete MILESTONE 245 DELCLOO6 Containment Repair Project Contracts Closure 246 DELCLO03 EC Closure 03/21/1021 vduction 0 103/21/10 21 203/23/10 21 03/21/1021 0

C51400 03/21/1021 0

C51400 03/28/1009 156 C82100 03/27/1005 80 C81100 2 43 EC 75221 Ph 5: Col~cto 4C rqe~n Te.bw Co-0 M 111021 03/2111021 244 CWa~~

-Mn~

1/1021 203/2110 2 24 5 Cwhwit Repi Protm Cord-acts lour 0321/11021 03/2811009 246 EC 0o-e 03/23/1021 03/27/1005 or/1 21

/MILESTO 32101 3/M81021 247 DELCLOL1M Project Closeout Complete MILESTONE 03/28/10 21103/28/10 21 0

C81000 1001 1-249 DELTST06 Perform Concrete Scan / Boring 03/21/1021103/23/10211 48 C68100 250 DELTST03 Interface Perform ILRT Test 1:251 DELTSTL1M

':252 DELCLOL12M Interface Testing/ILRT Complete MILESTONE Interface Plant Start-up Complete MILESTONE 03/23/1021 48 C68100 03/23/10 21 03/23/1021 0

C68100 03/30/1021 03/30/10 21 0

C68100 03021/1021 03/23/1021 250 Interfnce Perfnrm ILRT TeOM 0321/1021 0/23/1021 25 //nfne TesOee'ORT

=Conpete MILESTONE 3/1021 03123/1021 252 stt-n Pint

  • 3 10 2

/102 254 DELIMP2-0000 Interface Startup to Mode 4 03/23/10 21 03/25/10 21 48 C68100

-254 kntfc StWP to Mode 4 03/23/10 21 03/2/10 21 20 s*/n Mode 255 OELCLOO-0000 Interface Startup to Mode I/On-line 03/25/10 2112/1021120 C6810003121

~Ro.

Ad*Aty D"cription

ýrjy Stu, Early Finish NEW-2m 04 11 10 25 01 Jna W4 Doc "an January 04, 2010 05:16:37_PM 08 15 22 01 Feb as 15 22 n

05 Mar Apr Page 16 of14 Rev D