Email - Subject: Schedule
ML102871043
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/04/2010
From: George Thomas
Office of New Reactors
To: Lake L
NRC/RGN-II
References
FOIA/PA-2010-0116
Download: ML102871043 (17)


Text

.

V I

RPý 7' Masters, Anthony From:

Sent:

To:

Cc:

Subject:

Attachments:

Categories:

Thomas, George Monday, January 04, 2010 6:21 PM Lake, Louis Franke, Mark; Khanna, Meena; Farzam, Farhad; Carrion, Robert; Masters, Anthony; nausdj@ornl.gov; Saba, Farideh; Sykes, Marvin; Manoly, Kamal Latest CR-3 Level 3 Schedule (1-4-10) 01 10 Level 3 Rev D - 11x17.pdf Perform Review

Lou, Attached is the CR-3 Level 3 schedule as of today (1/4/10).

Thanks.

George 1

?ý//g

4 CR3 Outage Containment Repair Project - Level 3 Schedule Ery RmDec Jan Feb Mar Apr n

Early Start Firs ur 28 04 11 18 25 01 15 22 0

8 Finish

,Dur:

2 18 04 8

5 2

29 0

Row Activity Descriptior Containment Repair Action Items 05

-Issue Level 2 Schedule That 2

DELACT010 Includes Input from Engineering &

11/17/09 07 01/07/10 12 34 C13300 EPC Contractor

-Ensure the Installation of 3

DELACT012 Containment Equip Hatch is Factored 11/17/09 07 01/07/10 12 34 C13300 into CRT Sch 4

DELACT009

-Prepare & Issue SGT Containment 12/01/09 07 01/06/10 12 22 C13300 Repair Scope of Work Document 5

DELACT005

-Prepare & issue SGT Staffing &

Mobilization Plan / Task Plans 12/0110907101/09/1012 58 C13300 6

DELACTO08

-Establish When SoGT Takes Control 12/01/090701/13/1012 94 C13300 of Schedule Function.

Containment Repair*Logist4cs.-

.=,

'=

i*

=.*,,

8 DEL-Tent

  1. R39 Move Tent From MTF to 12/18/090701/06/1017 23 C62100 8

DELLOG008 MLY & Repower l/SOOllO/O1 3C20 9

DELLOG005

-Move P. Ingersol Crew From Trailer

  1. 24 to Trailer #5 12/18/0907 01/06/1017 23 C62100 10 DELLOG011

-Tent #80 Move Tent From MTF to 01/04/10 14 01/25/10 08 144 C62100

-P. Fagan Crew Move Personnel &

11 DELLOG014 Their Items from Trailer # 1to Trailer 01/04/1014 01/25/1008 144 C62100 12 DELLOG017

-Take Physical Ownership of SGR 01/11/100701/22/10 17 100 C62100 2 -

Iss u Level 2 Schedule That des Iut from '

1111710907 01107110 12

-Ensure the Installation of 3Contarinmenat Equip Hatell is a

-Prepare & Issue SGT 12101/09 07 01/06/1. 12 Prepare & Issue SG Staffing & Mobil n Plant I 1210110907 01109/10, 1215,5 07 lS~S12.

6

-Establist When SGT Takes Control of Schedule ýFunto oren u 39 Meve Tent From MTF In MLY R aepewe 2tIV1809 07 01t06t1017

-Move P Igersol Cren Front Truroe, #24 to Trailer #5 Q12111/09 07 01106/10.17 i 0-Tent # 80 YMov MTF toMLY &

Si ailS 14.

51.n r

12 13 S1/IBill.;

Tent From aeponer Moce

,tr Items 15/1008 nke Physical Ownership of 1RI Fel Ten e tn 1007 0112210 17.

railer # 24 Demob toI adlets 16s in

-8 iv 1007 0112911017i 14 -Restore the Parking in lThe 1

Matn Parting Lot 5 111/10 07 01129I11 17 13 DELLOG020

-ira 18 14 DELLOG023 Pae tiler # 24 Demob to Trailers 16 & 01/11/10 0_0 store the Parking in The Main 01/18/10 0-1 king Lot 01/29/1017 01/29/1017 150 C62100 100 C62100 15 DELL 2

-Take Physical Ownership of SGR 15 DELL.....

Decon Tent # 86 ConqtainmentRepair Roo ;Cuse Analysis,

-Take Physical Ownership of 15 S e

1e4nTest#O68 02u0111007 L

2112/10 17:

DELRCA058 Activity

-PE Develop Root Cause Document (AR 358724358724

Description Legend 02/01110 071022//10 17 100 C62100 10/21/09 07101/24/10 19 2j45 C50 Eat~ai-Early Rem Early Starl i

WBS MFinishe Dur Milestones 17 -PE Develop Rvet Cause Document (AR 358724358724 012110907 01/24/10i19 28 04 11 18 25 01 08 15 22 01 08 1s 22 29 05 Mar Dec Jan Feb Mar Apr te-Freoress Activity January 04, 2010 05:16:37 PM Page I of1(

Rev D

CR3 Outage ContainmentRepair Project - Level3 Schedule In rly Sta, t Early R em DW-I I

ec Jan Feb Mar Finish Durý W2 28 04 11 18 25 01 08 15 22 01 08 1!

22 Row Activity Descriptior Apr 29 05

-PII Develop SupportlRefute Root 18 DELRCA060 Cause Analysis Documentation 19 20 21 DELRCAO56

-PFi Analyze, Develop & Issue Final Root Cause Analysis Report

-PE Perform Owners Review of DELRCA061 Support/Refute Root Cause Analysis Documentation PII Tune Abaqus Model w/ Creep DELRCA086 Test Results, Creep Gradient, ASR 10/25/0907 11/15/09 16 11/24/0907 12/23/0914 01/12/10 19 88 C45500 01/21/10 19 197 C45500 01/14/10 19 112 C45500 01/08/10 14 96 C45500 22 DELRCAO82

-P1I Expand Nastran Model 12/23/09 14 01/06/1002 36 C45500 23 DELRCA080

-P11 Procure Super Computer Use 12/23/09 14 01/06/10 02 36 C45500 24 DELRCAO84 PHI Load Expand Model on Abaqus 01/06/10 02 01/08/10 02 48 C45500 25 DELRCA057

-PII Analyze, Analysis of MPR 01/08/10 07 01/11/10 19 48 C45500 Detension Scope & Sequence 26 DELRCAO88 PI Cross Check Abaqus & Merlin 01/08/10 14 01/10/10 14 48 C45500 Models 27 DELRCA071 PHi Perform FEM Analysis with Lab 01/10/1019 5

C45500 CA Test Results 28 DELRCA056C PE Perform Owners Review of Final 01/22/1007 01/23/1019 24 C45500 Root Cause Analysis Report 29 DELRCA059 PNSC Review & Approve Root 01/25/10 07 01/27/10 19 36 C45500 Cause Determination 30 DELRCA059M Root Cause Analysis 01/27/10 19 01/27/10 19 0

C45500 Complete/Approved MILESTONE Containment Repair Designl Basis Analysis' yj T

18-PIt Develop OupporReofute RootCaseAn alysis Doeur 10/25/0907S 011121.. 19

-PI Analyze, Develop &

Issue Final RSot Cause 1111510916 0112111019 20 -PE Perform Owsners Revinw 11/2410907 01114110:19 2nISuvpnnlnfute Root PiI Tune A hav us Mu el wI 21 Creep Test Results, Creep 12123109 14 01sse10 14 22 _Pl

,pn......... Model 12/23109.14 01/06/1 4 02 23-PII IProcure Sulper coalpt*

23Use 12123/09 14 01/06)lu0)2 240110 I

PI1 Load Ex1 Abaqus 611002 5PIt An; 25 MPR D, 0110811007 26 PI Cr.

Merlin 01/08/101, 27 Pll 011011 end Model H108110 02 yze, Analysi tension Soo 01111110 s Cheek Ab lodels 01011 1 Perforn FEM Lab Test R

)14 Olt u

p &Se e iis&

i C 45 K 1019 28 PE Perform Owners Review of Final RSol Cause Analysis 01122/1007 01/23/1019 29 Plo S~Revie

& Approve Root Cause Oeterminaeon 01/26110 07 01127110 19g 30 Root Cause Analysis Complete/Approved MILEST 0112711019 01127/10 19 32 Design Basis Analysis 32Complete MILESTONE 1 02105/10 13 02J05t10 13 EC 03016: Revise EC Based on Tendon Tension Cal to 0112511018 01O28/10 16 18 25 01 8

15 22 01 08 15 22 29 05 32 DELDBA-3M Design Basis Analysis Complete MILESTONE EC 63016: Revise EC Based on 33 DELDBA-0030 Tendon Tension Calc to support Fuel Load Row.

Activity Description 02/05/10 13 02/05/10 13 0

C45100 01/25/10 18 01/28/10 18 72 C43200 Early Rem' Early Star. Finish Dur WBS 28 04 11 Dec Jan Feb Mar Aer Legend:

Milestones In Progress Actiity January 04, 2010 05:16:37 PM Page 2 o 1 Rev D

.40

CR3 Outage ContainmentRepairProject - Level 3 Schedule Early Fi Rem e

Jan Feb Early Start Finish Dur WBS 28 04 11 18 25 01 08 15 22 01 Row Activity Description Mar Apr 08 15 22 29 05 34 DELOUT-0200 Interface - Complete Design Requirements Prior to Fuel Load Start 35 DELDBA-0004

-Detensioning Calc - Incorp Additional Elements (Eq Htch)

-Detensioning Cale - Include Results 36 DELDBA-0009 of Analysis in Cale & Release for Review

-Detensioning Calc-Conduit Local 37 DELDBA-0018 Stress Analysis (MPR Calc 0102-0135-05)

-Detensioning Calc-Concrete 38 DELDBA-0010 Reinforcement Ratios (MPR Calculation 0102-0135-01)

-Detensioning Calc-Concrete 39 DELDBA-0012 Strength & Elastic Modulus (MPR Calc 0102-0135-02)

-Detensioning Calc-Finite Element 40 DELDBA-0016 Model Description(MPR Calc 0102-0135-04) 01/28/10 18 12/02/09 21 12/23/0917 12/27/0907 01/28/10181 0

C45100 34 interface - Complete Design Requerments Prior to Fuel silo,1

i..oi2ail0 i 1 etensonng Cal, Incop

-5 Addldonal ClettEl......'(E t 01/08/10 10 "92 C43200 2H11-2 112/02-10921 01/0811010 01/08/10 07 01/11/1013 89 C43200 167 C43200 12/27/0907101/06/1013 47 C43200 12/27/09 07101/10/10 13[ 143 C43200

3. -D.,.nsloning Calc-Include Result, of Analysis in C ale &*

12/2310917 01/08/1007 3

-eetenstotonig Caic-ConCdut Lot0calaSnsý ttc Modulu 12127/0907 001/1111013 34 Detensioning Calc-Concrete Reinforcelent Ratio, (MPR 41 12/27/0907

.01/06110 13 39 -Detensio*ng Calc-Concrete Stren h

Elstic nodlusc 121279 07 0

0i 40-Detensioni~g calc-Finlde

'E'cemen Monel 12/27/09 07 i11/01 41-Detensioni*g( Cac-edo.

  • -Osl0 D'ot 1212710907 i01/i101 42 -Detens i

Revisec Ot/0108/10 07

/43 -Doe De e 01/09/10 4

i iiC 12/27/09 07 01/13/10 13 41 DELDBA-0014

-Detensioning Calc-Tendon Tension (MPR Calculation 0102-0135-03) 42 DELDBA-0006

-Detensioning Calc - Perform Revised Cale Owners Review

-Detensioning Calc-Tendon 43 DELDBA-0020 Detensioning Evaluation (MPR Calc 0102-0135-06) 12/27/09 07 01/08/10 07 01/10/10 13 01/12/10 07 215 C43200 143 C43200 96 C43200 01/09/10 13101/14/10 13 44 DELDBA-0005 45 DELDBA-1M 46 DELDBA-0202 47 DELDBA-0204 48 DELDBA-0203 49 DELDBA-0205

-Detensioning Calc - Approve Calc Detensioning Calculation Complete MILESTONE 01/13/10 13101/15/10 13 120 C43200 48 C43200 0

C43200 oning Coln - I Calc Owners 01 /12/10 stoning Cale sinning Evyal 3

0/114i Approve C

4 Deten 5t' Comp wit1 Aelo

/131 01 01/15/10 13101/15/10 13 F erforrn Revie r0700

Tender,

,ion 013 ng Calc

  • 01/15/10 13 inning Calculation ete MILESTONE 3

01015/10 13

-Conainrment Deism Cal, -

Perrone Owners Review of 11/20/tO 09 01/23/10 19 8Centiinment.21am clic -

S&L Issue Dealt Cal0 for PE

)1120/1009.

01120/1009 4

-Containeni Del0rn Cali Resolve Owners Review 01/23/1018 01/25/10 18

-Containment Delam Calc - S&L Perform Final Analysis 12/22/09 13101/20/10 091 379 C43200

-Containment Delam Calc - Perform Owners Review of S& L Calc 01/23/10 18 Containment Delam Calc - S&L Issue 01/20/1009 Draft Calc for PE Review

-Containment Delam Calc - Resolve Owners Review Comments on S&L Cale 01/20/1009 01/25/10 18 81 C43200 0

C43200 48 C43200 Row Activity Description Early Start Early Rem WBS Finish Dur 28I 04 11 i.

i.

i.

F.

i.

4,

18 25 01 08 15 22 01 Feb 08 15 22 Mar Dlec Jan Doc Jan 29 05 Apr Page3 of 15 Legend:

Milestones Is-Progress Activity January 04, 2010 05:16:37 PM Ray 0

CR3 Outage Containment Repair Project - Level 3 Schedule n

Er St I Early Rem(

Dec Jan Feb M.

r Finish

.ur

  • W 28 04 11 18 25 01 08 15 22 01 08 a

[Row Activity 50 DELDBA-0206 Descriptior r

Apr 15 22 29 05 I

I Containment Delain Calc - Issue Final S &L Calc 2

01/25/10 18 0

C43200 I

-Containment Bldg Calc - Finalize 51 DELDBA-0100 Computer Analysis 52 DELDBA-0104

-Containment Bldg Caic - Incorp Eq Htch Model Details

-Containment Bldg Calc - Compile 53 DELDBA-0101 Calc to be Ready for Review/Nerification 01/15/10 13101/22/10 131 168 C43200

-Consz 52 !ol 01151F101 01/15/10 13101/29/10 13 336 C43200 01/22/10 13101/29/10 131 168 C43200 Containment Deiam Caoc -

issue FinalS UL Cali,

'05181010 01125/10 18

-oteBladg Cal.e i Computer Analysis 01022/10 13 i

0129/10 13 3-Cnta Bldg CCac-Compile Cac to be Ready 0tI22/t0 t3 01/29/10 13 54 -Containment Bldg Calc -

Owners ReviewNerification 01/9/11013 0203/10 13

.5

-Containment Bldg Calc -

Incorporate Review, 02103/10:13 02/05/10 13 Containment Bldg Cale 071Cne MILESTONE r/62105/10 13 02/05/10 13 54 DELDBA-0102

-Containment Bldg Calc - Owners Review/Verification 01/29/1013 55 DELDBA-0103

-Containment Bldg Calc - Incorporate Review Comments & Approve 56 DELDBA-2M Containment Bldg Calc Compl MILESTONE iContainment Repair Implementation Designi 02/03/10 13 02/05/10 13 02/03/10 13 120 C43200 02/05/10 13 48 C43200 02/05/10 13 0

C43200 58 DELDESLIM EC Implementation Design Complete 02/14/10 07 02J14/10 07 0

C45100 58 DELESLIM MILESTONE MILETON

-EC 75000 PH 1 Concrete Cut:

59 DELDES11710 Planning Prepare W10 01652765 12/26/09 10 01/15/10 07 257 C47100 Packages Complete 60 DELDES21020M EC 75218 PH 2 Detension: Develop 12/30/09 14 01/11/10 20 25 C45100 70% Pkg 61 DELDES21025 70%EC 75218 PH 2 Detension: Distribute 0111/10 20 01/12/10 04 C45100 070%

Pkg for Reniew F

62 DELDES2111M EC 75218 PH 2 Detension: Develop 01/11/1020 120 C45100 Final EC "Pkg for final DRB" 0111 1

2 63 DELDES21027 EC 75218 PH 2 Detension: Review 01/12/100401/13/1004 24 C45100 70% Pkg 59i -EC500PHI Conorete 50 Cut Planning Prepare wig 12/2600910 01/15/1007 S

6 EC 75218 PH 2 Detensioo 12J30/09-14 01/11/1020 R1is C75218 PH 1 ibune 101 0111 /10 20 0

62 C75218 PH

)ee Final 01111/1020.

0 EC63 75218 PH Rvieo470%

011 2/11004i C EC 7521801 70% Paka 0 11311002 6

C7 5218

,MILESTON 21311004 28 04 11 Detension:

Pkg for Revie

/12/10 0 2 Delenen EC "PkgIor

/16/10 20; 2 Delension:

lkg 1/13/10 04 02 Datension:

Is Meeting 01/13/1004 I H 2 Datension:

E - 70% Pkg Mtg 01/13/1 04 18 25 01 5 ECC Implementation Design

85. Complete MILESTONE r
  • "02*114/10 07 02/1411007 08 15 22 01 08 64 DELDES21030 EC 75218 PH 2 Detension: 70%

Package Meeting 65 DELDES2120Z EC 75218 PH 2 Detension:

MILESTONE - 70% Pkg Mtg CpIt 01/13/100201/13/1004 2

C45100 01/13/100401/13/1004 0

C45100 Early ý,"Rem Early Start Rem WBS 1,

.fHinish.,., ur,

15 22 29 05 Row Activity

.Pescription Dec Jan Feb Mar Aor Legend:

Milestones In-Progress Activily

_Page 4 of 16 January 04, 2010 05:16:37 PM Rev D

CR3 Outage Containment Repair Project-Level 3 Schedule_

n F

Sta rt Early Rem WBS Dec Jan Feb Mar 08 EayStn Finish Dur.

28 04 11 18 25 01 08 15 22 01 08 115 22 Row Activity Descriptio Apr 29 05 66 66 DELDES2120 67 DELDES219OZ 68 DELDES2115M EC 75218 PH 2 Detension:

Inter-Departmental Reviews 01/16/1020 01/18/1020 01/16/10 201/16/10 20 EC 75218 PH 2 Detension: Milestone

- Issued for Final Review EC 75218 PH 2 Detension: Mech /

Struc - DV 48 C45100 0

C45100 48 C45100 24 C45100 01/16/10 20101/18/1020 01/19/1020 rnvc'tso DLI 0 ~

lorvir-ri 01116/1 67 EC

67Mil, EC 68 Me 01116/1 69 70i

'*70 Oil 69 DELDES2117 Verification Comments EC 75218 PH 2 Detension: Incorp 70 DELDES2123 Review Comments 01118/10 2(

EC 75218 PH 2 Detension: Supv 71 DELDES2125 Review Prior to Final ORB EC 75218 PH 2 Detension: Distrib 72 DELDES2125D Final ORB Pkg for Review EC 75218 PH 2 Detension: Review 73 DELDES2125R Final DRB Pkg EC 75218 PH 2 Detension: Final 74 DELDES21205 DRB Meeting 01/18/1020 01/19/1020 01/20/1000 01/19/1020 01/20/10 00 01/20/1001 24 C45100 4

C45100 1

C45100 01/20/1001101/21/10011 24 C45100 C45100

-_Oe~p~arlt enlal Revi*e ws

,20 0111810 20 75218 PH 2 Detensson:

stone - Issued for Final R

.20 01116/1020 75218 PH 2 etension:

4, / Strnu -Dv 120 01116,1020 EC 75218 PH 2 oeten.ion:

Incorp Verification Comment 8110 20 0111911020 EC 75218 PH 2 Detension:

Incorp Review Comments

/10 20.

01/1911020 EC 75218 PH 2 Detension:

Supv Review Prior to Final D

/19110 20 0112014000 EC 75218 PH2 Densioe :

Distrib Final ORB Pkg for Re 112011000 01/20/1001 3C 75218 PH 2 Detension:

Review Final ORB Pkg 1/20/1001 01/2111001 4EC75218 PH 2 Dt0ension:

Final DRB Meeting 0112111001 01/21/1003 Sc 75218 PH 2 Delonsion:

Incorporate Final ORB Corn

,01121/1003 01122/1003 EC 75210 PH 2 Detension:

76 Obtain Superisor Approval 01/22/10 03 01122/10 11 77 EC 75218 PH 2 Detension:

MILESTONE

- All Reviews C 1/2211003 0112211003 78 EC 75218 PH 2 Detension:

Obtain PGM Approval 01/22/10 11 01/2311011 79 EC 75218 PH 2 Detension:

! P.a.ning Prepare EC Work P 01123/10 11 01/26/1011 8,

EC 75218 PH 2 Otoenson:

MILESTONE

-OK to Star 1123/10 11 0..23.10 11 01/21/1001101/21/10031 2

EC 75218 PH 2 Detension:

01/21/100301/22/1003 24 C45100 75 0 DELDES21215 Incorporate Final ORB Comments 76 DELDES21220 EC 75218 PH 2 Detension: Obtain 01/22/10 03 01/22/10 11 8

C45100 Supervisor Approval 77 DELDES213OZ 78 DELDES21225 79 DELDES21710 EC 75218 PH 2 Detension:

01/22/1003 MILESTONE - All Reviews Complete 0 EC 75218 PH 2 Detension: Obtain 01/22/1011 PGM Approval EC 75218 PH 2 Detension: Planning Prepare EC Work Packages EC 75218 PH 2 Detension:

80 DELDES214OZ MILESTONE -OK to Start Field Work

-EC 75218 PH 3 Detension: Revise 81 DELDES3115N IWE/IWL Repair Plans 01/23/1011 01/23/1011 12/30/0918 01/22/1003 01/23/1011 01/26/1011 01/23/1011 01/13/10 15 0

C45100 24 C45100 72 C47100 0

C45100 20 C45100 81 -ECi75218 PH 3 Deteosi Revise IWE/IWL Repair F 12/30/0918 0113/1015 an Early Rem WBS 2B 2

04 11 18 25 01 08 1s 22 01 08 15 22 29 05 Row Activity Description Early Start Finish Bur: W Dec Jan Feb Mar Apr Legend:

Milestones In-Progres Act0vity Page 5ot 16 January 04, 2010 05:16:37 PM Rev D

CR3 Outage ContainmentRepair Project - Level 3 Schedule Early Sta Early Rem WBS--

Dec

-Jan F4eb.

Mar

~'

Finish Dur' 28 04 11 18 25 01 08 15 22 01 08 15 22 2

Row Activity Descriptior Apr

.9 05 82 DELDES3 83 DELDES3 84 DELDES3 85 DELDES3 86 DELDES3 87 DELDES3 88 DELDES3 89 DELDES3 90 DELDES3 91 DELDES3 92 DELDES31 1027 111M 1030 120Z EC 75219 PH 3 Removal: Review 30% Design Pkg

-EC 75219 PH 3 Removal: Develop Final EC "Pkg for final DRB" EC 75219 PH 3 Removal: 30%

Design Review Meeting EC 75219 PH 3 Removal:

MILESTONE - 30% Design Review Complete 01104/1000 01/06/1014 01/07/1009 01/07/10 11 01/06/10 14 01/19/1016 01/07/1011 01/07/10 11 48 C45100 158 C45100 2

C45100 0

C45100 82EC 75219 PH 31F 2 Revie o 30% Des s01/04110 00 01/0 83-C 75219 n

Develop Fi, 01106/10 14 84 EC 7521E 30% Desi 01107/1009 EC 75211 MILESTC 1/07/10 11 115M

-EC 75219 PH 3 Removal: Mech /

01/19/101601/25/1016 144 C45100 Struc - DV

-EC 75219 PH 3 Removal:

120 Inter-Departmental Reviews 01/19/101601/25/1016 144 C45100 117 EC 75219 PH 3 Removal: Incorp 01/25/101601/27/1013 45 C45100 Verification Comments go P1g.

/1014.

'H 3 Rernova PH 3 Removv I n Review W dig 01/07110 1 PH 3 Remov :

4E -30% Deo gn i

01107io I1

-EC 75219 PH 3 Revoval:

5 0/19/10 18 010251n 16 8 -EC '7!21 PH 3 Removal:

Inter-Departmetal Reviews 11016 01/2511010 88 EC 75219 PH 3 Removal.

88 Incorp Verfihtion Comment 01/25/1016 01/27/10 13 89 EC 75219 PH 3 Removal:

1ncov1 Review Comnments 01/25/1018 01/27/1015 C90 C75219PH3Reeoavl:

' 90 Milestone - Issued for Flnal R 0>1/25/10

1.

011/5/10 1 EC 75219 PH 3 Renoval:

Supv Review Prior to Final D 01/27/1015 01/27/1019 EC 75218 PH 3 Reenvovh 2 Disrb Final DRB Pkg for Re 01/27/1019 01/27/1020 C 75219 P83 Remo.val:

Review Final ORB Pkg' 01/27/1020 01130110 14 123 190Z 125 125D EC 75219 PH 3 Removal: Incorp Review Comments EC 75219 PH 3 Removal: Milestone -

Issued for Final Review EC 75219 PH 3 Removal: Supv Review Prior to Final DRB EC 75219 PH 3 Removal: Distrib Final DRB Pkg for Review 01/25/10 18 01/25/10 18 01/27/1015 01/25/1018 45 0

C45100 C45100 01/27/1015 01/27/1019 01/27/1019 01/27/1020 4

C45100 C45100 93 DELDES3125R 94 DELDES31205 95 DELDES31215 96 DELDES313OZ EC 75219 PH 3 Removal: Review 01/27/1020 Final DRB Pkg EC 75219 PH 3 Removal: Final DRB 0 Meeting 01/30/1014 EC 75219 PH 3 Removal:

Incorporate Final DRB Comments 01/30/1016 EC 75219 PH 3 Removal:

MILESTONE - All Reviews Complete 02/01/10 16 EC 75219 PH 3 Removal: Obtain 02/01/1016 Supervisor Approval 01/30/1016 02/01/1016 02/01/10 16 D2/02/10 16 01/30/10 141 66 C45100 2

C45100 48 C45100 0

C45100 24 C45100 EC75219PH3Removal:

First ORB Meeting 01/30/1014 01/3011016 5 EC75219PH3Removal:

InCorporate Final ORB Corn 01/30/10 16 02/01/10 16 EC 75219 PH 3 Removal:

96MILESTONE - AJI Revi*wes C 12/01110 16 02/01110 16 97 EC 75219 PH3 Removal:

Obtain Supenvisor Approval 02/01/1061 02/02/10 16 97 DELDES31220 Row Activity Early

,ar Descriptiontr Early Rem WBS 28 04 11 18 25 01 08 15 22 01 08 15 22 29 05 Row Ativit

Descrti, Finish Dur Dec Jan Feb Mar Ape Legend:

Mi/estones In-Progres Activity January 04, 2010 05:16:37 PM Page 6 of 16 Rev D

CR3 Outage ContainmentRepair Project - Level 3 Schedule n-Ead s Early Rem Dec Jan Feb 1 a.,y Finish Dur W 1

28 04 11 18 25 01 08 15 22 01 Mar I

Apr 08 15 22 29 05 Row Activity 98 DELDES31225 99 DELDES31710 Descriptio EC 75219 PH 3 Removal: Obtain PGM Approval EC 75219 PH 3 Removal: Planning Prepare EC Work Packages EC 75219 PH 3 Removal:

MILESTONE - PGM Approval 02/02/10 1E 02/03/10 07 02/03/1007 12/30/0914 02/03/1007 02/06/1007 02/03/1007 01/07/1009 15 C45100 72 C47100 0

C45100 67 C45100 95EC 75219 PH 3 Removal:

SObtairPGM Approval 02/02/10 16 02/03/10.07 EC 75219 PH 3 Removal:

Planring Prepare EC Work P 02/03/10 7 02/1061/ 07 100 EC 75219 PH 3 Renrnoat:

MILESTONE

- PGM Approv 0021311007 02/03/1007 100 DELDES314OZ EC 75220 PH 4 101 DELDES41008D Es 7 ha0len Design Challen£ EC 75220 PH 4 102 DELDES4111M Develop 70% E Challenge EC 75220 PH 4 103 DELDES4-0011 AREVA Review S06-0007 for Li EC 75220 PH 4 104 DELDES4-0010 AREVA Issue R Calc/Dwgs EC 75220 PH 4 105 DELDES4-0014 AREVA/MPR R 106 DEC 75220 PH 4 6 DELDES4-0013 Calc S09-0025 Replacement: 30%

ge Pkg Review 101 EC 75220 PH 4 Replacement: 30% Design 12/30/09.14 01107110 09 Replacement:

C "Pkg for Design 01/13/10 15 01/22/10 15 216 C45100 Replacement:

& Revise Calc 01/15/10 09 01/31/10 23 398 C45100 ner Plate Replacement:

.einforcement 01/15/1009 01/31/1023 398 C45100 Replacement:

evise Calc S06-0004 01/15/100901/31/1023 398 045100 Replacement: Void 01/15/100902/03/1023 470 C45100 Replacement:

Additional 01/15/10 09 01/20/1023 134 C45100 for Delam Area Replacement:

01/15/1009 01/20/1023 134 045100 Radial Reinforcement 1

EC 75220 PH 4 107 DELDES4-0008 AREVA Design Reinforcement 108 DELDES4-0006 EC 75220 PH 4 AREVA Design EC 75220 PH 4 109 DELDES4-0009 AREVA Revise New Reinforcen EC 75220 PH 4 110 DELDES4-0022 C

72P Revise Calc S09 02 EC 75222 4 SRep/aoer nDevelop 70%

1/13/1015 01122/10 15 01 /220 PH 15 03Rep/a [eent:o AREVA 01115 110

[

1141102 1c7, t2.0 PHi 4!

4Repla enenrt: 0REVA ssue 01/10/10~

C 01131/10 23 Ed 7E 12o PH4!

Repla emen: AREVAPMPR 01101 2

)

01 1310 23 l

-EC 7520 PH 41 16Repla emreo/: /0oid Coc 009

/0/

f.e,..

ar

/0/RVA.

01/10/101oc 02103/1023 10 E7520 PH 4 17Repba, reo/n: 7,REVA 01/15/100~

2 1/22/10 23 01/10/100 )

01/200/1023 Ed 7520 PH 4 01/1510100 010*0/10 23 rc1 720 PH 4.

110 Repla3eomen/ MPR Rev/se 0111W/100 0/1g/10 23 1 1 1 EC5 7520 PH 4 Replaorment: Void Coc S008 011151100k 02/00/1004 1 1 2

co7520 PH04 112 /aRe1001 7men 0/REVA 1 3 Ed 75420 P04i R~eob eent/ AREVNMEP/

01/11/10 0*

01/31/10 23 Replacement:

Existing & Create lent Dwgs Replacement: MPR 9-0048 01/15/10 06 01/15/10 06 01/15/100S 01/15/1009 111 DELDES4-0021 112 DELDES4-0024 113 DELDES4-0018 EC 75220 PH 4 Replacement: Void Calc S08-0008 EC 75220 PH 4 Replacement:

AREVA Revise Calc S09-0044 01/20/1023 134 C45100 01/31/10 23 398 C45100 02/09/10 04 595 C45100 01/31/1023 398 C45100 01/31/1023 398 C45100 EC 75220 PH 4 Replacement:

AREVA/MPR Revise Calc S06-0005 01/15/1009 Row Activity Description Early Rem 28 04 11 E

Finish Dur Dec Jan 18 25 01 08 Is I

i i.

i.

i.

22 01 08 15 22 29 05 Mar Avr Feb Legend:

Milestones 4

In-Progress Page7o/

/f January 04, 2010 05:16:37 PM Rev D

CR3 Outage Containment Repair Project - Level 3 Schedule W-D_

_aebM r -

n IEarly St Early Rem Dec Jan Feb Mar ay Stýarl Finish Dur WBS 28 04 11 18 25 01 08 15 22 s1 08 15 182n10 Row Activity Descriptioi Apr 22 29 It5 114 DELDES4-0016 115 DELDES4-0020 EC 75220 PH 4 Replacement: MPR 01/15/10 09 Revise Calc S06-0002 EC 75220 PH 4 Replacement: Void Calc S06-0006 116 DELDES4-0002 EC 75220 PH 4 Replacement: SGT Revise Formwork Spec CR3-C-0002 EC 75220 PH 4 Replacement:

117 DELDES41008B Receive Design Input on Form Work from SGT 118 DELDES4-0001 EC 75220 PH 4 Replacement: SGT Revise Formwork Calc S08-0021 EC 75220 PH 4 Replacement:

119 DELDES4-0004 AREVA Revise Concrete Spec CR3-C-0003&Verify Mix Dsn EC 75220 PH 4 Replacement: Owner 120 DELDES4-0005 Accept Revised Concrete Spec CR3-C-0003 01/15/1009 01/15/1009 01/15/1009 01/31/1023 02/09/1004 02/02/1023 01/15/1009 398 C45100 595 C45100 446 C45100 0

C45100 01/15/10 09102/02/10 231 446 C45100 01/15/1009 01/20/1023 01/20/1023 01/21/1023 134 C45100 24 C45100 EC 75220 PH 4 Replacement:

121 DELDES4-0000 Receive Desgn Input from PIt Root 01/21/10 19 01/21/10 21 2

C45100 Cause Analysis EC 75220 PH 4 Replacement:

122 DELDES4111M3 Receive Preliminary MPR Analysis 01/22/10 13 01/22/10 15 2

C45100 Input 123 DELDES4115M EC 75220 PH 4 Replacement: Mech / 01/22/101501/24/1015 48 C45100 Struc - 70% DV 124 DELDES4120 EC 75220 PH 4 Replacement:

01/22/10 15 01/24/1015 48 C45100 Inter-Departmental 70% Reviews 114EC 7520PH4 Relaemen

t. MP R Revise>,,

115 EC 75 20 PH 41 116 EC 7?20 PH4 Repla nmenv S1 T Rev/se 5110 0 02/02/10023 118c 75 P20 PH 4.

Replat meni: Receive

  • 011.5110 2IQ2110 23..

EC 7420 PH 4.

el a ement: 5GT Revise 01115/10C5i 02/02/1023 120 EC 7552 PH 4R4 Rep Rpael ent 0-o EVA 01/15U10 101/2/011 23 120 EC 75220 PH 4 Replacement: Owner Acept 01/20/1023 01/21/1023 122 EC 75220 PH 4 2 Replacement: Receive 010151019 01/21/10 21 EC 75220 PH 4 122 eglcc....ecc Receive i

01/22/10 13 01/22/10 15 i

i 123EC720P4 Replacement: Mech I Stwcc-01/22/10 15 01/24110 15i EC 75220 PH 4 Replacement:

01/22/1015 01/24/1015 125 Ic 75220 PH 4 SReglacentent: Milestone -

S1/22110 15 01/22/1015 26 EC 75220 PH 4 Replacement: Incor, 1004, 01124/1015 0125/10 15 127 EC 75220 PH 4 Replenteent: cccl, 70W/

1 01/24/1015 01025/10 15 12EC 75220 PH 4

-12 Repacemet Dvelop Final

/

01/2810 14 02/0O/10 15 129 EC 75220:P H 4 12 Replacement: Owner Accept 13110623 02/0301023 125 DELDES419OZ 126 DELDES4123 127 DELDES4117 128 DELDES4111M2 129 DELDES4-0025 EC 75220 PH 4 Replacement:

1 Milestone - Issued for 70% Review 101122/10 EC 75220 PH 4 Replacement: Incorp 70% Review Comments EC 75220 PH 4 Replacement: Incorp 70% Verification Comments EC 75220 PH 4 Replacement:

Develop Final EC "Pkg for final DRB" EC 75220 PH 4 Replacement: Owner Accept Revised Calc S09-0044 01/24/10 1E 01/24/10 11 01/28/10 14 01/25/1015 01/25/1015 02/05/10 15 24 C45100 24 C45100 193 C45100 72 C45100 01/31/10 231 02/03/1023 Early Rem 0......

0 0....o8 5

22.

1.

0 1

22 29 Row Activity Description Early Start WBS I Finish Dur:

Dec Jan Feb Mar Apr Legend:

Milestones In-Progress Activty____________________Pgovll.8o 16 January 04, 2010 05:16:37 PM Rev 0

CR3 Outage Containment Repair Project - Level 3 Schedule Row

Activity, Description E ari y Early "Rem u

DwBS c

Jan Fb M

I i;

13 0 EC 75220 P014 EC 75220 PH 4 Replacement: Owner 3eplacement Owner Accept 130 DELDES4-0023 01 /31/10 23 02/03/10 23 72 C451 00 0to Accept Revised Calc S09-0048 01/3111023 0210311023; EC 75220 PH 4 Replacement: Owner 13Replacement Owner Accept 131 DELDES4-0007 Accept New Reinforcement 01/31/10 23 02/02/10 23 48 C45100 0013,/1023 Owner Acce Design/Calc EC 75220 PH 4Replacement: Owner EC 75220PPH 4

Replacemýnt Owner Accept DELDES4-0012 Accept Revised Calc S06-0007 for 01/31/10 23 02/02/10 23 48 C45100 02/02/1023 Line Plae 0/31110 23 i02102110 23,

~ ~Liner Plate l

13EC 75220 PH 4 Replacement: Owner 0 1133 7

05220 PH 4 Replacement: Owner Accept DELDES4-0019 AcceptRevsedCalS06-0005 01/31/10 2302/03/10 23 72 C45100

's/

01/31/1023 02/03110 23 134 EC/ 75230 PH31 423eplacem n

134 EC 75220 PH 4 DELDES4-0017 EC 75220 PH 4 Replacement: Owner 72 C45100 Replacemean Owner Accept Accept Revised Calc S06-0002 0131/10 23 02/03/1023:

13 5CEC 75220 PH1 EC 75220 PH 4 Replacement: Owner 13ep5aceepnt: Owner Accept 35 DELDES4-0015 Accept Revised Cale S06-0004 01/31/10 23 02/03/10 23 72 C45100 a

01/31/1023 02/03/1023 EC 75220 PH 4 Replacement: Owner E

1 36 C 75220 PH 4 SReplacement: Owner Accept 136 DELDES4-0003 Accept Formwork Spec CR3-C-0002 02/02/10 23 02/03/10 23 24 C45100 R02l02J102 t OwnerAccep

& Calc S08-0021 062/02/1023 02/03/1023 EC 75220 PH 4 Replacement:

C137 75220 PH 4 137 DELDES4111M1 Receive Approved MPRAnalysis 02/05/101302/05/1015 2

C45100 0eplac2aent1 Rece.

ive Input 02/05/1013 0205/10 15 EC 75220 PH 4 Replacement: Final 02/05/10150 1

451003 138 DELDES4120A Inter-Departmental Reviews 02/09e/1 15 9

C50916nal Inter-De02/05/10 15 02/00/1010 139 EC 75220 PH 4 Replacement.

Ftnal MenS 139 DELDES4115M1 EC 75220 PH 4 Replacement: Final 02/05/101502/09/10 16 97 C45100

T Mech / Struc - DV 02O51I0 15 0210911016 40 EC 75220 PH04 140 DELDES4117F EC 75220 PH 4 Replacement
Incorp 02/10/10 16 24 C45100 Replacement:

lncorp Final Final Verification Comments 0210911016 02/1016 2

7l4, EC 75220 PH 4 EC 75220 PH 4 Replacement: Incorp 0210 1 Replacement:

Incorp Final 141 DELDES4123A Fia0eiw omns2/09/1016 02/10/10 16 24 045100.020/lA 21/06 1 !

D L E 4 2 A Final Review Comments

.o 09/11016 0211011016 142EC 75220 PH 4 EC 75220 PH 4 Replacement: Supv 102 Replacement:

SOpn Review DELDES4125 Review Prior to Final DRB 0

1 0

402/10/1016 02110/1020 143 DELDES4125D iEC 75220 PH 4 Replacement: Distrib 143 Replacement:

02/01tr Frll 11*5EC752P4epaeet 02/10/1020102/10/1021214045100

'14 1DReplacement:D ReliRB Fina DED 415 RviwFinal DRS Pkg foreviw02102/10/1020 02/110/1021 4EC 75220 PH04 144 DELDES4125R EC 75220 PH 4 Replacement:

02/10/10 21 02/11/10 21 24 C45100 1 Replacement:

Review Final Review Final ORB Pkg 021/R2 0/112 14cF 75220 PH14 15 DLE425 EC 75220 PH 4 Relcmn:Final 14 Replacemnent:

Final ORB Me 1 DELDES41205 DRB Meeting 02/11/1021 02/11/1023 2

045100 02/11/1021 02/11/1023 Row

Activity ":Description Earlystart Early Rem WBS 28 04 11 is 25 01 08 15 22 01 08 15 Finish Our Dec Jan Feb Mar Legend:

Milestones In-Prognress Actity Apr 22 29 05o 22 29 05 Apr January 04, 2010 05:16:37 PM Page 9 n 16 Rev 0

CR3 Outage Containment Repair Project - Level 3 Schedule Description Early Start Early Rem WBS De Ja.

Feb Fiis

-Dur 28 04 11 18 25 01 08 15 22 01 Ro~w Activity 146 DELDES41215 147 DELDES413OZ 148 DELDES41220.

149 DELDES41225 150 DELDES414OZ 151 DELDES41710 152 DELDES51OZ 153 DELDES51005 154 DELDES51008 Mar Apr 08 15 22 29 05 EC 75220 PH 4 Replacement:

02/1111023 Incorporate Final DRB Comments EC 75220 PH 4 Replacement 02/1211023 MILESTONE - All Reviews Complete EC 75220 PH 4 Replacement: Obtain 02/12/1023 Supervisor Approval EC 75220 PH 4 Replacement: Obtain 02/13/10 07 PGM Approval EC 75220 Replacement MILESTONE 02/14/1007

- PGM Approval EC 75220 PH 4 Replacement:

02/14/1007 Planning Prepare EC Work Packages 02/12/1023 02/12/1023 02/13/1007 02/14/1007 24 0

8 24 C45100 C45100 C45100 C45100 146 EC 75220 PH 4 Replacement: Incorporate 02111V1 0 23 02412110 23 E4 75220 PH 4 14 Replacement: MILESTONE 212121023 0211211023 148 EC 75220 PH 4 Replacement: Obtain 02112)10 23 02/1311007 14 EC 75220 PH 4 1 Replacement; Obtain PGM A 02/1311007 02/14410 07

,50 EC 75220 Replacement MILESTONE

-PGM App-ro

  • 42/14/1007 0211411007 15P EC 75220 PH 4 1

Replacement* Planning 02/14/1007 02417/1007 02/14/1007 02/17/1007 0

C45100 72 C47100 0

C45100 EC 75221 PH 5 Retension:

MILESTONE - "Start Project" 01/15/10 07101/15/10 07 EC 75221 PH 5 Retension; Prep/

Cplt Validation Plan w/Supv EC 75221 PH 5 Retension: Develop Project Tm / Kick-Off Mtg 01/15/1007 01/15/1009 01/15/1009 01/15/10 11 2

2 C45100 C451 00 155 DELDES51020M 156 DELDES51600 157 DELDES5111M 158 DELDES51025 159 DELDES51027 160 DELDES51030 161 DELDES512OZ EC 75221 PH 5 Retension: Develop Draft Pkg for Conceptual DRB EC 75221 PH 5 Retension: ID Long Lead material to Procurement EC 75221 PH 5 Retension: Develop Final EC "Pkg for final DRB" EC 75221 PH 5 Retension: Distribute Conceptual DRB Pkg for Review EC 75221 PH 5 Retension: Review Conceptual DRB Pkg EC 75221 PH 5 Retension:

Conceptual DRB Meeting EC 75221 PH 5 Retension:

MILESTONE - Conceptual DRB Mtg Cplt / Waived 01/15/1011 01/20/1020 01/21/1000 01/21/1000 01/21/1008 01/22/10 06 01/21/1000 01/21/1000 01/22/1012 01/21/1008 01/22/1008 01/22/1008 133 C45100 4

C45100 36 C45100 8

C45100 24 C45100 2

C45100 0

C45100 152 EC 75221 PH 0 Retension:

MILESTONE - 'Start Project 0141541007 0141541007 153 EC 75221 PH 5.Retension:

Prep I Cplt Validation Plan wl 01415/1007 01/10/1009 154 EC 75221 PH 5Retension:

D-evelp Pninedl Tm I "0141541009 01145110 11 15P 7221 PH 5Rntennion:

5 aDevelop ra Pkg for 01.1541011 4l/21/10 00 156 pc 75221 PH 5 Retension:

ID Long Lead material to Pro 0142041020 0142141000 EC 75221 PH 5 R tlnnor..

1570Deelop Final EC "Pkg for S

012141600 01422410 12 15P EC 75221 PH 5 Retension:

Distribute Conceptual ORB

  • 01421/1000 01/21/1008 159 Eý 75221 PH 5 Retension:

Reliem Conceptual DR0 Pk 01421410l 08 0142241008 160 EC 75221 PH 5 Reltenion.

Cso Conceptual ORB Meeting 0122410 06 01/2211008 P61 EC 75221 PH 5 Retennion.

1 MILESTONE

- Conceptual 01122/1008 01/22/1008 01/22/10 08101/22/10 08 R E Early Rem 28 04 1 11 18 1

25 01 08 15 22 01 08 15 22 29 05 I ow Activity Description Early Start s

h DUE Jn WBS Apr I :- :."

00 F::

i nis:

Dec Jan Feb Mar Apr Legend:

Milestones In-Progress Activity Page 10 of 16 January 04, 2010 05:16:37 PM Rev 0

Row Activity CR3 Outage Containment Repair Project--Level 3 Schedule r

Early S

Rem Dec Jan Feb n

Early Starl, WB 13 Finish Du4r,

I 28 04 11 1

18 25 1

01 08 1

15 22 1

01 08 1s 22 29 Descriptior Apr 05 162 DELDES5190Z EC 75221 PH 5 Retension: Milestone 01/22/1012

- Issued for Final Review 163 DELDES5115M 164 DELDES5120 EC 75221 PH 5 Retension: Mech /

Struc - DV EC 75221 PH 5 Retension:

Inter-Departmental Reviews EC 75221 PH 5 Retension: Incorp 01/22/10 12 01/22/1012 01/22/10 12 0

C45100 01/26/10 12 96 C45100 01/26/10 12 96 C45100 165 DELDES5117 01/26/10 12101/29/10 13 73 C45100 Verification Comments 166 DELDES5123 EC 75221 PH 5 Retension: Incorp 01/26/10 12 01/29/10 13 73 C45100 Review Comments 167 DELDES5125 EC 75221 PH 5 Retension: Supv 01/29/10 13 01/29/10 17 4

C45100 Review Prior to Final DRB 168 DELDES5125D EC 75221 PH 5 Retension: Distrib 01/29/10 17 01/29/10 18 1

C45100 Final DRB Pkg for Review 1 C 75221 PH 5 Retension:

"2 Milestone - Issued for Final R "111/22/10 12 01/22110 12 EC 75221 PH 5 Retension:

163 Meh I Struc - DV 01022110 12 01e26/10 12 2 PH 5 Retension:

01126110 12 0112611012 165 EC 75221 PH 5 Retension:

Incorp Verifieaion Comment 01126110 12 01/29/10 T3 E 75221 PHI5 Reoensn..

S Inoorp Review Commenes

  • 6106110 12 01/29110 13 EC 75221 PH 6 Retension:

Supv Review Prior to Final D 01l29/10 13 01209/10 17 16 8 EC 75221 PH 5 Retension:

SSDistal Final *RB Pkg for Re 01129/1017 01129110 18 169 EC 75221 PH 5 Retension:

1 Review Final 0RB Pkg 01129110 18 01130110 18 1

EC 75221 PH 5 Reiension:

Final DRB Meeting 0113011018 611301020 1 C171 EC 75221 PI 5 Retension:

11Incorporate Final DRB Corn 01/30/1020 01/31/1020 Ii EC 75221 PH 5 Retension: Review 169 DELDES5125R Final DRB Pkg.

170 DELDES51205 EC 75221 PH 5 Retension: Final DR0B Meeting 171 OIELDES51215 EC 75221 PH 5 Retension:

Incorporate Final ORB Comments 172 DELDES5130Z EC 75221 PH 5 Retension:

MILESTONE - All Reviews Complete BC 75221 PH 5 Retension: Obtain 173 DELDES51220

o.

e.....

e*^

^.....

01/29/10 1E 01/30/10 18 01/30/10 2C 01/31/10 2C 01/30/10 18 01/30/10 20 01/31/10 2C 01/31/1020 B 24 C45100 2

C45100 24 C45100 0

C45100 01/31/10 20(02/01/10 04 174 DELDES51225 175 DELDES514OZ Supervisor ApproI val EC 75221 PH 5 Retension: Obtain PGM Approval EC 75221 PH 5 Retension:

MILESTONE - PGM Approval 02/01/10 04102/02/10 04 8

C45100 24 C45100 0

C45100 172EC 75221 FH 5 Reension:

MILESTONE

- All Reviews C 4031/10 20 01/311.020 3 ECC 7221 PHI Helension; Obtain Supervisor Approval 0113111020 02101/1004 174 EC 75221 PH 5 Retens*on:

Olialen POM Approval 02/01/1004i 02102/1004 7C 5221 PH 5 Retension.

47MILESTONE

- PGM AppOov

  • 2/02/1004i 02J02/10 04 176 EC 75221 PH 5 Retension:

Planning Prepare EC Work P 02/../I. 04:

02/05110*

04 25 01 08 15 22 01 08 15 22 29 05 02/02/10 04102/02/10 04 176 DELDES51710 EC 75221 PH 5 Retension" Planning 02/05/1004 72 C47100 Prepare BC Work Packages Containment Repair Contracting / Subcontracting / Procurment 1

w A

t Early Rem WBS Row Activity Description Early Start Finish Dur 28 04 11 18 Dec Jan Feb Mar Legend:

Milestones In-Progress Anitvily Januarv 04, 2010 05:16:37 PM Apr Page 11 of 16 Rev D

CR3 Outage ContainmentRepair Project - Level 3 Schedule Ery Rem' Dec Jan Feb Mar_

n Early Start Eal I

18____01___15___22_

1

,1 Finish Dur' 1

28 04 11 18 25 01 08 1

22 01 08 15 Row Activity Descriptior Apr 29 05 22 178 DE LCONLIM Contracting/Subcontracting/Procurem 02/08/1017 02/08/10 17 0

C51400 ent Complete MILESTONE Cnntoiinmasnt PIrntri.Fr

~tr*Pt*rc 180 DELCON23

-Develop Contract SGT 12/04/09 07 01/05/10 15 9

C15100 181 DELCON26 Contract Mailed to SGT for signature 01/05/10 1501/05/1015 0

C15100 182 DELCON29 Execute Contract & Receive Signed 01/06/10 07101/07/10 15 16 C15100 Contract From SGT 183 DELCON31 SGT Contract In Place 01/07/1015 01/07/10 15 0

C15100 Conýtain~men~t`Repair ucnrctni~

185 DELCON09

-Award Hydro-Demolition Contract 12/04/09 19 01/15/10_17 267 C52410 186 DELCON09M Award Hydro-Demolition Contract 01/15/10 17 01/15/10 17 0

C52410 Compl MILESTONE 187 DELCON11

-Award Batch Plant Contract 12/04/09 19 02/08/10 17 843 C52400 Award Batch Plant Contract Compi 0

188 DELCON11M MILESTONE 0

2/O 8110 1702/08/1017 0

052400 Conta nment.Repair LongrLead Procurment :

190 DELPRO-006

-Procure Forms 12/24/09 09 01/21/10 09 403 C51400 191 DELPRO-006M Procure Forms Compl MILESTONE 01/21/1009 01/21/1009 0

C51400 192 DELPRO-005

-EC-ED 75309 Procure Rebar/Crimp 01/04/10 14 0201/1014 672 051400 193 DELPRO-001

-EC-ED 75309 Procure Concrete

  • 01/04/10 14 02101/1014 672 C51400 100 -Develop Coneract WT 12/04109 07 01/05110 15 Contract Mail vignature U1/05/1510 is 102 Eecute Cot 1

nB2 Sgned Coni i

0110611007 I 103 SOT Con

,u 107/10 15 1 B-Award HydronDenolition Contract 1210410g 19 01/15/1017 187 Award Batch Planltcontract 190 Procure Forms 12J24109 09 01121/1009 S178 Contracting/Subcontracting/

i Procurement Complete MILE 2/0/810 17 02/t 7

d to SOT for 105110.15 ract & Receive act From SGT H/t07/10 15 ante. Place 01/01/10 15 186 Award Hydre-Demolition SControot cerpl MILESTON

"*1/15/10 17 01t15/10 17 tBo Award Batch Plant Contract C2Oept MILESTONE

.021/08/10 17 02/0811017 Procure Forms Comp[

MILESTONE cýtt12111009 0112111009 192 -C-ED 75309 -rcureor

......... p I 01/04110 14 02/ )1/10 14 01/0/0 14 EC-ED 75309 Procure Rebar/Clnp MILESTONE 1112/0l1l 14 02/01110 1 28 04 11 18 25 01 08 1

22 01 08 15 22 29 05 Dec Jan Feb Mar Apr 194 DELPRO-005M Row Activity EC-ED 75309 Procure Rebar/Crimp MILESTONE Description 14j02/01/10 14 0

C51400 Early Start Early Rem!

E Earl t-r Finish Dur! WBS Legend:

Miletne In-Progress Actvity

_____.__.______________Page 12 of 16 January 04,2010 05:16:37 PM Rev D

Row Activity CR3 Outage Containment Repair Project - Level 3 Schedule EarlyERemtaeC Jan Feb Mar

_2 Apr alyStart Finis DRe WES 20 04 11 18 250 01 08 15 22 01 08 15 22 29 0

Description 95 LPRO M

EC-ED 75309 Procure Concrete Mix 195 DELPRO-001M Compl MILESTONE 02/01/1014 196 DELPRO-004

-EC-ED 75308 Procure Grease 12/25/09 18 197 DELPRO-002

-EC-ED 75308 Procure Tendons 12/25/0918 198 DELPRO-003

-EC-ED 75308 Procure Conduit 12/25109 18 02/01/10 141 0

01/22/10 181 436 C51400 1 EC-ED 75309 Proc:re 9

1Coteta Mix tompi MILEST 012/0110CI 74t 1 02/01/10 14 01/22/10 18 01/22/10 18 436 C51400 436 C51400 s6 E ED 75308 Procunre Grease 12125109 18 01(22/1 1 197 iEC-ED 7530eircr PI Tendons 12/25/09 18 01122/1018 98 2EC-ED 75308 P,0 12t2.5109 18 01/22/10 18 199 DELPRO-004M EC-ED 75308 Procure Grease Compl 01/22110 18 01/22/10 18 0

C51400 MILESTONE 200 DELPRO-002M EC-ED 75308 Procure Tendons 01/22/1018 01/22/1018 0

C51400 Compil MILESTONE 201 DELPRO-003M EC-ED 75308 Procure Conduit 01/22/10 18 01/22/10 18 0

C51400 201 R-0M Compl MILESTONE J

180C10 EC 74801: Remove 8 Displacement 203 DELRPI-0030 Gauges In S/G Opening & 2 in two 4 02/19/10 07 02/19/10 19 12 C51400 Cores 51&81A E-C7.48.01: Remove22Strain 204 DELRPI-0031 Gauges In Five 8" Cores 6AA, 30, 02120/10 07 02/20/10 19 12 C51400 57A, 84A & 92 EC 74801: Dome: GPR, Prep, Form 205 DELRPI-0025

& Grout Repair at 7 Core Drill 02/22/100702/23/1007 24 C51400 Locations EC 74801: Non-Delam Bays 5-6:

206 DELRPI-123A GPR, Prep, Form & Grout Repair at 9102/23/10 07 02/24/10 19 36 C51400 Core Locations 207 DELRPI-0026 EC 74801: Dome: Strip Forms at 7 02/24/10 01 02/24/10 07 6

C51400 Grout Repair Locations EC 74801: Non-Detai Bays 4 208 DELRPI-121A GPR, Prep, Form & Grout Repair at 9 02/24/10 19 02/26/10 07 36 C51400 Core Locations EC-ED 75308 Procure Grease Compt MILESTONE

/1/22/10 18 01/22110 18 200 EC-ED 75308 Pro r

Tendons Compt MILESTON f1/221/1018 01/22/10 18 201 EC-ED 75308 Procure Conduit Corepi MILESTONE oil?01/1018 8112211018 203 EC 74801: Rerroe 8 Displacement Gauges In S/G 02/1911007 02M18/10 19 204 EC 74801 Remove 22 Strain Gauges In Five 8t 02J20110 07 02120/10 19 205 EC 74801t Domee GPR Prep, Fore & Grout Repair 02122/1007 02/23/1007:

EC 74B01: Non-Delare Bay.

205 5-6: GPR, Prep. Form&

0212311007 02124/10 19 EC 74801: Doee Strip Forms at 7 Grout Repair Loc 02/24/1001 02/24/10 07 EC 74801: Non-Delam Bays 4-5:.GPR. Prep, Form &

02124/1019 0212611007 2

EC 74801: Nec-Dclam Bays 5-6: Strp Forms at 9 Grout 02125110 13 02t25/10 19 21 0 EC 74801: Non-Detam Bays 0-1: GPO, Prep,: Form &

vms 02/26/1007 02/28/1019 15 22 01 08 15 22 29 05 209 210 Row EC 74801: Non-Delam Bays 5-6:

DELRPI-123B Strip Forms at 9 Grout Repair 02/25/10 13 02/25/10 19 6

C51400 Locations EC 74801: Non-Delam Bays 6-1:

DELRPI-124A GPR, Prep, Form & Grout Repair at 02/26/1007 02/28/10 19 60 C51400 16 Core Location i :,Eary SartEarly Rem Activity Description Early Start Finish Dur WBS 28 04 11 18 25 01 08 Dec Jan Feb Mar Aer A

Legend:

Milestones a -Progress Activty Januar 04, 2010 05:16:37 PM Page 130o 16 Rev D

CR3 Outage Containment Repair Project - Level 3 Schedule n

Rem:

Dec Jan Feb 1

EarlyItIrI Finish Our: WB 28 04 11 18 25 01 08 1!

22

.,.01 Mar Apr 08 15 22 29 05 Row*

Activity Descriptior 211 DELRPI-1218 212 DELRPI-125A 213 DELRPI-124B 214 DELRPI-120A EC 74801: Non-Delam Bays 4-5:

Strip Forms at 9 Grout Repair Locations EC 74801: Non-Delam Bays 1-2:

GPR, Prep, Form & Grout Repair at 5 Core Locations EC 74801: Non-Delam Bays 6-1:

Strip Forms at 16 Grout Repair Locations EC 74801: Non-Delam Bays 2-3:

GPR; Prep, Form & Grout Repair at 8 Core Locations 02/27/1001 02/28/10 1l 03/01/10 0 02/27/1007 6

C51400 03/01/10 19/ 24 C51400 03/01/10 1E 12 C51400 36 C51400 03/01/10 19103/03/10 07 2 1EC 74801: Non-Delam Bays

4-5 Strp Fonrs at 9 Graot 02f27/10 01 02/27n1t 0o7 212 EC 74801: Non-DSlam Bays 1-2: GPR, Prop, Form &

02128110 19 03101110 19 213 EC 74801: Non-Deam Bays 1 : Strip Forms at 16 Grout 03101/1 007 03t01/10 19 EC 74801:o Non-Delamt says 2

2 -3:

GPR. Prep. Form t03r011101o..3t3110 Or EC 74801: Non-Delarn Bays 1-2: Sipo-s at 5 grot 03102110 13 0302/10tr19 216 EC 74801: Deslm Bays 34:

GPR Prep, Form & Grout 03/03/1007 03105t10 to 217 EC 74801: Non-eolarm Bays 2-3: Ship Foarms at 8 Grout

.03t041t01 O

.3104/1007 2

ECc 74801: Defam Bays 34:

2 tStrpFormsat 19Grout 03/06110 01 03106/10 19 EC 74801: Non-Delamn Bays 1-2:

215 DELRPI-125B Strip Forms at 5 Grout Repair 03/02/10 13 03/02/10 19 6

C51400 Locations EC 74801: Delam Bays 3-4: GPR, 216 DELRPI-0004 Prep, Form & Grout Repair at 19 03/03/10 07 03/05/10 19 60 C51400 Core Locations EC 74801: Non-Delam Bays 2-3:

217 DELRPI-120B Strip Forms at 8 Grout Repair 03/04/10 01 03/04/10 07 6

C51400 Locations 218 DELRPI-130 EC 74801: Delam Bays 3-4: Strip 03/06/1001 03/06/10 19 18 C51400 Forms at 19 Grout Repair Locations 219 DELDES1 1711 EC 75000 Verification of WO Prior to 011/10701115/1007 96 C51400 Field Work 220 DELIMP06 221 DELIMP07M EC 75000 Ph 1: Contractor Implement Concrete Cut EC 75000 Contractor Cleared to Star Field Work MILESTONE 01/15/10 07101/29/10 071 336 C51400 219 E 75000 Verification ouFWO P ior to Field Work 01111'1007 01115110 07

.220 EC 75000 Ph 1:1Conoracto.

npleroent Concrote Cut 0111511007 011291107 221

,c 75000 Contractor Cleared to Starn Field Work "01115/10r07 0111i510 07 01l/lOO/15/100 7 1 0 C51400 222 223 224 225 EC 75000 Ph 1: Contractor DELIMP06M Implement Concrete Cut Compl MILESTONE EC 75218 Verification of EC Prior to DELDES21226 Field Work EC 75218 Contractor Cleared to Star DELIMPO9M Field Work MILESTONE 01/29/1007 01/23/1011 01/28/1011 01/29/1007 01/28/1011 01/28/1011 0

C51400 120 C51400 0

C51400 C 75000 Ph 1:: Contractor Implomoet Concrete Cut

'011219/10 07 01/29/1007 M EC 75218 Verification of EC:

2Pnr to Fietd Work 0102311011 011213e1011i S

2 2 4 cEC 75218 Contractor SCleard to Start Field Work 1 o.."d t 11298110 13 021/2W10 13 52t75218 Ph 2u Contractor 2

m225 týmentoneonnsrop 0

21010 02312 26EC 75218 Ph 2: Coradctor Int Imlament Detension Compal V2/12110 13 02/12/10 13 DELIMP08 EC 75218 Ph 2: Contractor Implement Detension EC 75218 Ph 2: Contractor.

Implement Detension Compl MILESTONE 01/29/1013 02/12/1013 02/12/1013 02/12/10 13 336 C51400 0

C51400 226 DELIMP08M r* *

.;E rySat Early ReIB 2 '

"I 1

i I

Rce pt Rem 28 4

11 18 25 01 08 1

22 01 08 15 22 29 05 R

ctivity

-cri.on E

StartFinish Dur Dec Jan Feb Mar Apr Legend:

Milestones In-Progress Activity Page 14 of18 January 04, 2010 05:16:37 PM Rev D

CR3 Outage ContainmentRepair Project - Level 3 Schedule Description E

Early Rem' Dec Jan Feb Mar o Early Star WBS Row Activity Apr 22 29 05 227 DELDES31226 EC 75219 Verification of EC Prior to 02/03/1007 02/081 0

07 Field Work 7120 C51400 228 DELIMP11M EC 75219 Contractor Cleared to Start 02/08/10 07 02/08/10 07 0

C51400 Field Work MILESTONE 229 230 DELIMP10 DELIMP10M EC 75219 Ph 3: Contractor Implement Removal EC 75219 Ph 3: Contractor Implement Removal Compl MILESTONE 02/12/10 13102/19/10 131 168 C51400 02/19/10 13102/19/10 13 0

C51400 231 DELDES41226 EC 75220 Verification of EC Prior to Field Work 232 DELIMP17M EC 75220 Contractor Cleared to Start Field Work MILESTONE 02/14/1007 02/19/1007 02/19/1007 02/19/1007 EC 75220 Ph 4: Contractor Implement Forming 234 235 DELIMP12M DELIMP14 EC 75220 Ph 4: Contractor Implement Forming Compl MILESTONE EC 75220 Ph 4: Contractor Implement Placement 02119/1013 02/27/1013 02/27/10 13 02/27/10 13 02/27/10 13 03/09/1013 03/12/1013 03/09/1013 120 C51400 0

C51400 192 C51400 0

C51400 240 C51400 72 C51400 227 EC 75219 Vedfitcaton of EC Prior o Field Work 02/03110 07 02/08/10 07 228 EC 75210 Co....ar..

Cleared to Start Field Work

.2108/1007 02=0101007 229 EC 752/9 Ph 3: Contractor t2mplemeat Removal 02112110 13 02119/10 13 EC 75219 Ph 3. Co/ae/or w Implement Removal ComplI 21219110 1*3 02/1911013 231 EC 75220 Veofic~o/l of ECC Pri oro Field Work 02/14/1007 02/1911007 E 75220 Contracior Cleared to S/art Field Work

'02/1911007 02119/10 07 EC 75220 Ph 4 Contraco i

~Im~plement Foeirming 02119110 13 02127/10 13 EC 75220 Ph4: Contracior

'0 Implement Forwing Compl M

(

02o27110 13 62/27110 13 235 EC 75220 Ph 4: Contractor I

)

i

- Implemren Paecemeal

(

i 0212711013 03/09110 13 EC 75220 Ph 4: Contractor 2

Implement Care 03109110 13 03112/10.13 EC 75220 Ph 4: Cont.ractor Implemponent Plmortoerr CoorpI 03109/10 13 03/09/103 238 EC 75220 Ph94 Contractar

43.

Implement Cure Compl MILE 3/12/10 13 03/12/10 13 239 EC 75221 Verircatiao of EC Prior to Field Work 02102/10 04.

02/07/1004 236 DEC 75220 Ph 4: Contractor 2

DELIMP16 Implement Cure 03/09/1013 03109/10 13 DELIMP14M EC 75220 Ph 4: Contractor Implement Placement Compl MILESTONE 0

C51400 238 DELIMP16M EC 75220 Ph 4: Contractor Implement Cure Compl MILESTONE EC 75221 Verification of EC Prior to 239 DELDE551226 FedWr Field Work EC 75221 Contractor Cleared to Start 240 DELCLOL2M Field Work MILESTONE 241 DELIMP18 EC 75221 Ph 5: Contractor Implement Tension 03/12/1013 02/02/1004 02/07/1004 03/12/1021 03/21/1021 03/12/10 131 0 C51400 02/07/10041 120 C45100 02/07/10 04 0

C45100 03/21/10 21 216 C51400 03/28/10 21 168 C75100 24 EC 75221 Contrcto, 24 Cleared to Stanr Field Work

<2/07l10 54 02707110 04 C41:EC 75221Ph 5: Contractor 24

-,lmotlnion 01212 0321/1021 242 Demob Containment Repair S

  • 03l21-102*

03/28/1021 242 DELIMP20 Demob Containment Repair Project 8Early Early Rem 1

28 04 11 18 25 01 08 15 22 01 08 15 22 29 05 Row Activity Description Early.Star F

s DR WBS J

F M

Finish Dec Jan Feb Mar Apr Legend:

Milestones In Progress Activity January 04, 2010 05:16:37 PM Page 15of1If Rev D

Row Activity CR3 Outage -Containment Repair Project - Level 3 Schedule

,_11Ei

==,,ta Finis Early Rem 1

ec Jan Feb Mar 08 Ma15 Eal al Finish Dur W S28 04 11 18 25 01 08 15 22 S

01 1

Description Apr 22 29

_05 EC 75221 Ph 5: Contractor 243 DELIMP18M Implement Tension Compi MILESTONE 244 DELIMPLIM Contractor Implement Construction Complete MILESTONE 45 Containment Repair Project 245 DELCLO06 Contracts Closure 246 DELCLO03 EC Closure 247 DELCLOL1M Project Ctoseout Complete MILESTONE

,Containment RePair Te~sting~>~

03/21/10 21103/21/10 211 0

C51400 03/21/10 21 03/21/10 21 0

C51400 156 C82100 03/21/1021 03/23/1021 03/28/1009 03/27/10 05 2 43 EC 75221 Ph 5 Contractor Implement Tension Compl M

'Q3/21/tO 21 203121/10 21 24 Contractor Implement 4 Constrction Complete MILE LCi 3/2 t/10 21 03/21/10 21

!245 Containment Repar Pronect Contracts Closure 0312 1t1021t 03/28/1009 246 EC Closure 03123/1021 03/27/1005 247 Project Closeout Complete MILESTO 03/28/1021 312e110 2

80 C81100 03/28/1021103/28/10211 0

C81000 249 DELTST06 Perform Concrete Scan / Boring

[03/2111021 03/23/1021 48 C68100 250 DELTST03 Interface Perform ILRT Test 03/21/10 21 03/23/10 21 48 C68100 251 DELTSTL1M Interface Teoting/ILRT Complete 03/23/1021 03/23/1021 0

C68100 252 DELCLOL12M Interface Plant Start-up Complete 03/30/10 21 03/30/10 21 0

C68100 MILESTONE qotainment Repair Plant'Saru &Testing 2 /n c

249 Perform Concrete Scan /

03/21/1021 0302311021 25o0 interace Perfornm LRT Test 03121/1021 03023/1021 Interface Testiog/llRT 21Complte MILESTON*E

  1. 03t23110 21 03/23/10 21 2Inerfacn Plant 2 0S/ast og i /23130/10 21 I1021 254 DELIMP2-0000 Interface Startup to Mode 4 03/23/1021 03/25/1021 48 C68100 255 DELCLOO-0000 Interface Startup to Mode 1/On-line 03/25/10 21 03/30/10 21 120 C68100 254 Interface Startop to Mode 4 03/23/10 21 03/25/1021 25 Interface Startup to Morn 03U25/10 21 03/30/1021 Row Activity Description

- Early Rem Early Start Finish DRe WBS Milestones Loenod:

28 04 11 18 25 Dec Jan In-Progress Actiity January 04, 2010 05:16:37 PM 01 08 15 22 Feb Mar 01 08 15 22 29 05 Apr Page 16 of0 Rev D