ML102870349

From kanterella
Jump to navigation Jump to search
2.8 Inadequate Support of Tendons During Pouring
ML102870349
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/23/2009
From:
- No Known Affiliation
To:
Office of Information Services
References
FOIA/PA-2010-0116
Download: ML102870349 (7)


Text

2.8 Inadequate Support of Tendons I3 D1 during Pouring May identify additional perspective on this issue as RCA related efforts proceeds

==

Description:==

If the tendons are not supported well, they may move during concrete pouring resulting in either or both, (1) localized friction between the tendon and its sleeve and (2) non-uniform stress in the concrete over the length of the tendon.

Data to be Collected and Analyzed:

Examine supports of hoop sleeves during construction.

(1) Examine supports of vertical sleeves during construction.

(2) Examine sleeve location and condition during demolition.

See Exhibit 1 as an example of a few pictures that show spacing during construction and SGR hole cutting.

Verified Refuting Evidence:

Verified Supporting Evidence:

1.

Photos from original construction demonstrate the support system.

2.

Photos taken during demolition show that the sleeves were evenly distributed in the zone and not deformed.

Reviewed by: Dr. Avi Mor, 352-795-6486, ext 1030 -

PII CR3 Team Office P!~~~i.

I=rPie-11/23/2009 1

pfiumiakQ

-v 7

1 J7 1~

4~4 7<bw

J e(-,

,I 4 JAN 73 REACTOR BLDG EQUIP ACCESS OPENING

I

Q4 A

Ix I

  • i¸ /!*

I 5APRIL 73 WALL 3000 3600 EACTOR BLDG EXT

b5C, 0ý?,69 4

Al

)~c ~

A-MP

'I

'A

ftik e-a If g,9