MONTHYEARML1029107172010-10-20020 October 2010 Horizontal Tendons Pages 26-39 ML1029205162010-09-20020 September 2010 Photo ML1019304132010-06-0909 June 2010 Photograph - Progress Energy, Storm Drain Stabilization Pond Wells ML1007504722010-03-0404 March 2010 Various Photos - Crystal River ML1028709792010-01-12012 January 2010 Email - from: Thomas, George to: Naus, Dan J. CC: Lake, Louis Dated Tuesday, January 12, 2010 3:59 PM Subject: FW: Petrographic Report ML1028709832010-01-12012 January 2010 from: Thomas, George to: Naus, Dan J. CC: Lake, Louis Dated Tuesday, January 12, 2010 3:57 PM Subject: FW: Petrographic Report ML1028710382010-01-0707 January 2010 Email - Subject: Spauling Pictures, Attachments: Spauling 010.jpg; Spauling 001.jpg to Spauling 009.jpg ML1028710392010-01-0707 January 2010 Email - from: Chou, Rich to: Powell, Sid Cc: Franke, Mark; Lake, Louis; Sykes, Marvin; Morrissey, Thomas; Reyes, Rogerio Dated Thursday, January 07, 2010 11:53 Am Subject: FW: Wednesday Ncrs ML1028710402010-01-0606 January 2010 Email - from: Williams, Charles R. (Charles.Williams@Pgnmail.Com) to: Lake, Louis; Thomas, George; 'Nausdj@Ornl.Gov'; Carrion, Robert; Souther, Martin; 'Trowe@Wje.Com' Cc: Miller, Craig L Dated Wednesday, January 06, 2010 4:51 PM, Subject: ML1029107012009-12-11011 December 2009 Email - from: Williams, Charles R. to Lake, Louis; Thomas, George; Nausdj@Ornl.Gov; Carrion, Robert Cc: Miller, Craig L (Charles.Williams@Pgnmail.Com) Dated Friday, December 11, 2009 4:14 PM Subject: Fm 2.11 for Review Attachments: Fm 2.11( ML1027204462009-12-0808 December 2009 3.4 Exhibit 7, Petrographic Report ML1028703492009-11-23023 November 2009 2.8 Inadequate Support of Tendons During Pouring ML1029306272009-11-14014 November 2009 Email - Subject: Photos of Core #5 ML1029107202009-10-29029 October 2009 5.6 Exhibit 7 Grease Photos ML1029206172009-10-23023 October 2009 Subject: October 23 2009 Containment Picture ML1029204802009-10-20020 October 2009 Email - Subject: October 20 2009 Containment Pictures ML1029204822009-10-18018 October 2009 Email - Subject: October 18 2009 Core Bore Pictures ML1029204842009-10-16016 October 2009 Photos; Picture007.jpg, Pcture008.jpg, Picture009.jpg, Picture010.jpg, Picture014.jpg, Picture021 .Jpg, Picture022.jpg, Picture023.jpg ML1029204852009-10-15015 October 2009 Subject: October 15 2009 Containment Pictures ML1029204892009-10-15015 October 2009 Subject: October 15 2009 Crack Pictures ML1029204972009-10-14014 October 2009 Photos; Picture021.jpg, Picture022.jpg, Picture023.jpg, Picture024.jpg, Picture025.jpg, Picture026.jpg, Picture027.jpg, Picture028.jpg, Picture029.jpg, Picture030.jpg, Picture031.jpg, Picture032.jpg, Picture033.jpg, Picture034.jpg, Picture0 ML1007504162009-10-14014 October 2009 Email from D. Pelton to S. Lee, Subj: Fyi - Status Update: Crystal River ML1007504282009-10-0808 October 2009 Email from D. Toro-Diaz to D. Weaver, Subj: Additional Photos - Crystal River ML1007504272009-10-0707 October 2009 Email from D. Toro-Diaz to D. Weaver, Subj: Crack Found Exterior Containment Wall ML1028702582009-10-0606 October 2009 Email - October 6 2009 Licensee Pictures ML0904907492009-04-13013 April 2009 Request for Comments Concerning the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Review 2010-09-20
[Table view] |
Text
2.8 Inadequate Support of Tendons during Pouring I3 D1 May identify additional perspective on this issue as RCA related efforts proceeds
Description:
If the tendons are not supported well, they may move during concrete pouring resulting in either or both, (1) localized friction between the tendon and its sleeve and (2) non-uniform stress in the concrete over the length of the tendon.
Data to be Collected and Analyzed:
Examine supports of hoop sleeves during construction.
(1) Examine supports of vertical sleeves during construction.
(2) Examine sleeve location and condition during demolition.
See Exhibit 1 as an example of a few pictures that show spacing during construction and SGR hole cutting.
Verified Refuting Evidence: Verified Supporting Evidence:
- 1. Photos from original construction demonstrate the support system.
- 2. Photos taken during demolition show that the sleeves were evenly distributed in the zone and not deformed.
Reviewed by: Dr. Avi Mor, 352-795-6486, ext 1030 -
PII CR3 Team Office P!~~~i. I=rPie-11/23/2009 1 pfiumiakQ
-v 7 1 J7 1~
4~4 7<bw
J e(-,
,I 4 JAN 73 REACTOR BLDG EQUIP ACCESS OPENING
I
- Q4 A Ix I
I 5APRIL 73 EACTOR BLDG EXT WALL 3000 3600
b5C, 0ý?,69 4
Al
)~c ~
A-MP 'I 'A
ftik e-a If g,9