2.8 Inadequate Support of Tendons I3 D1 during Pouring May identify additional perspective on this issue as RCA related efforts proceeds
==
Description:==
If the tendons are not supported well, they may move during concrete pouring resulting in either or both, (1) localized friction between the tendon and its sleeve and (2) non-uniform stress in the concrete over the length of the tendon.
Data to be Collected and Analyzed:
Examine supports of hoop sleeves during construction.
(1) Examine supports of vertical sleeves during construction.
(2) Examine sleeve location and condition during demolition.
See Exhibit 1 as an example of a few pictures that show spacing during construction and SGR hole cutting.
Verified Refuting Evidence:
Verified Supporting Evidence:
- 1.
Photos from original construction demonstrate the support system.
- 2.
Photos taken during demolition show that the sleeves were evenly distributed in the zone and not deformed.
Reviewed by: Dr. Avi Mor, 352-795-6486, ext 1030 -
PII CR3 Team Office P!~~~i.
I=rPie-11/23/2009 1
pfiumiakQ
-v 7
1 J7 1~
4~4 7<bw
J e(-,
,I 4 JAN 73 REACTOR BLDG EQUIP ACCESS OPENING
I
- Q4 A
Ix I
- i¸ /!*
I 5APRIL 73 WALL 3000 3600 EACTOR BLDG EXT
b5C, 0ý?,69 4
Al
)~c ~
A-MP
'I
'A
ftik e-a If g,9