ML102810308

From kanterella
Jump to navigation Jump to search

Notification Letter Designating PVNGS Balance of Plant Systems within the Cyber Security Rule Scope
ML102810308
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/29/2010
From: Mims D
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation, Office of Nuclear Security and Incident Response
References
102-06258-DCM/TLC
Download: ML102810308 (3)


Text

A*R A

subsidiary of Pinnacle West Capital Corporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Vice President Tel. 623-393-5403 P.O. Box 52034 Generating Station Regulatory Affairs and Plant Improvement Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-06258-DCM/TLC September 29, 2010 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

References:

(1) Letter from Jim Hughes, NERC to Jana Van Ness, Arizona Public Service (APS), "Request for Data or Information: Nuclear Power Plant

'Bright-Line' Survey," dated June 15, 2010 (2) Letter from Michael Moon (NERC) to APS, "NERC's Response to the Completed Bright-Line Survey," dated August 27, 2010

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3 Docket Nos. STN 50-528, 50-529 and STN 50-530 Notification Letter Designating PVNGS Balance of Plant Systems Within the Cyber Security Rule Scope By Order dated March 19, 20091, the Federal Energy Regulatory Commission (FERC) clarified that the "balance of plant" equipment within a nuclear power plant is subject to compliance with the FERC approved Critical Infrastructure Protection (CIP) Reliability Standards. Paragraph 50 of the Order provides for an exception from the CIP Reliability Standards for equipment in the balance of plant that is subject to the Nuclear Regulatory Commission (NRC) cyber security regulations. Pursuant to paragraph 50 of the Order, the North American Electric Reliability Corporation (NERC) has been engaging in a "Bright-Line" determination process (Reference 1) to clarify the systems that would be subject to the NRC cyber security rule (10 CFR 73.54), and those that would be subject to the CIP Reliability Standards.

In the Reference (2) letter, NERC is requiring that Arizona Public Service (APS) provide the NRC with a letter identifying all balance of plant Systems, Structures, and Components (SSCs) considered important to safety with respect to the NRC's cyber security regulation. As documented in our response to the Bright-Line survey, the 1 Mandatory Reliability Standards for Critical Infrastructure Protection, order on clarification, Order No. 706-B, 126 FERC ¶ 61,229 (2009).

A maiemaiber of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway 0 Comanche Peak

  • Diablo Canyon
  • Palo Verde
  • San onofre
  • South Texas 6 Wolf Creek (L

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission

Subject:

Notification Letter Designating PVNGS BOP Systems Within the Cyber Security Rule Scope Page 2 balance of plant SSCs in Attachment 1 of the Survey are important to safety, and thus, are within the scope of 10 CFR 73.54.

In accordance with the requirements of 10 CFR 73.54 (b)(1), a comprehensive identification of SSCs subject to the requirements of 10 CFR 73.54 will be developed during the implementation of the cyber security program. The program is implemented in accordance with the schedule submitted to the NRC by letter dated July 22, 2010, with the PVNGS Cyber Security Plan. This identification of SSCs will be available for inspection upon completion and will contain those SSCs as identified in Attachment 1 of the Bright-Line Survey. Providing the requested information in this alternate manner satisfies the intent of the NERC letter.

In the Reference (2) letter, NERC is also requiring that each nuclear power plant submit a revised cyber security plan to the NRC for its review and approval. On or before November 30, 2010, APS will supplement our Cyber Security Plan to clarify the scope of systems described in Section 2.1, "Scope and Purpose." Section 2.1, will be amended to clarify the balance of plant SSCs that will be included in the scope of the cyber security program.

No commitments are being made to the NRC by this letter. Should you need further information regarding this notification, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.

Sincerely, DCM/RAS/TLC/gat cc:

Michael Moon Director of Compliance Operations North American Electric Reliability Corporation 116-390 Village Boulevard Princeton, NJ 08540 Jim Hughes North American Electric Reliability Corporation 116-390 Village Boulevard Princeton, NJ 08540

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission

Subject:

Notification Letter Designating PVNGS BOP Systems Within the Cyber Security Rule Scope Page 3 Jim T. Wiggins Director, Office of Nuclear Security and Incident Response Two White Flint North (MS: 4D22A) 11555 Rockville Pike Rockville, MD 20852-2738 Eric Leeds Director, Office of Nuclear Reactor Regulation One White Flint North (MS: 13H16M) 11555 Rockville Pike Rockville, MD 20852-2738 E. E. Collins Jr.

NRC Region IV Regional Administrator J. R. Hall NRC NRR Senior Project Manager L. K. Gibson NRC NRR Project Manager J. H. Bashore NRC Senior Resident Inspector (acting) for PVNGS Sr. Physical Security Inspector, RIV/DRS/PSB