Extension Request for Resubmittal of Westinghouse Documentation Supporting License Amendment 249, Changes to the Steam Generator Inspection Scope & Repair Requirements
ML102730860
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/30/2010
From: Funderburk C
Dominion Nuclear Connecticut, Dominion Resources Services
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
10-579, TAC ME2978, FOIA/PA-2011-0115
Download: ML102730860 (2)


Text

Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 September 30,2010 U.S. Nuclear Regulatory Commission Serial No.10-579 Attention: Document Control Desk NSSUMLC RO Washington, DC 20555 Docket No. 50-423 License No. NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 3 EXTENSION REQUEST FOR RESUBMITTAL OF WESTINGHOUSE DOCUMENTATION SUPPORTING LICENSE AMENDMENT 249, "CHANGES TO THE STEAM GENERATOR INSPECTION SCOPE AND REPAIR REQUIREMENTS (TAC NO. ME2978)"

On May 3,2010, in response to a Dominion Nuclear Connecticut, Inc. (DNC) license amendment request, the Nuclear Regulatory Commission (NRC) issued License Amendment (LA) 249 to Facility Operating License, NPF-49, for Millstone Power Station Unit 3. This amendment revised Technical Specification (TS) 6.8.4.g , "Steam Generator (SG) Program," and TS 6.9.1.7, "Steam Generator Tube Inspection Report," to include a one-time alternate repair criteria (H*).

During the NRC's administrative processing of the supporting documentation for LA 249, the NRC discovered discrepancies with proprietary markings in some of the Westinghouse documents. On September 22, 2010 , the NRC issued a letter to DNC requesting affected documents be revised and resubmitted to meet the requirements of 10 CFR 2.390(b)(1 )(i),

by September 30, 2010. DNC has determined additional time is needed to resubmit the corrected documents. A new due date of October 15, 2010 has been agreed upon by Carleen Sanders, NRC Project Manager, for Millstone Power Station.

If you have any questions regarding this letter, please contact Wanda Craft at (804) 273-4687.

Sincerely,

(?dsy--

C. L. Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc. for Dominion Nuclear Connecticut, Inc.

Commitments made in this letter: None Attachments: None

Serial NO.1 0-579 Docket No. 50-423 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 C. J. Sanders, Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08-83 Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station