Failure to Report Arrest by Contract Employee (OI Case No. 2-2010-005)
ML102630065
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/16/2010
From: Scott Shaeffer
NRC/RGN-II/DRP/RPB2
To: Tynan T
Southern Nuclear Operating Co
References
2-2010-005
Download: ML102630065 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 16, 2010 Mr. Tom E. Tynan Vice President Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT:

VOGTLE ELECTRICAL GENERATING PLANT: FAILURE TO REPORT AN ARREST BY A CONTRACT EMPLOYEE (OFFICE OF INVESTIGATIONS CASE NUMBER 2-2010-005)

Dear Mr. Tynan:

Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC)

Office of Investigations= (OI) completed report regarding the failure to report an arrest by an employee of Williams Industrial Service Group, LLC, a contractor to Southern Nuclear Operating Company at the Vogtle Electric Generating Plant.

OI determined that there was insufficient evidence to substantiate that the contract employee willfully failed to report the arrest to management in accordance with applicable procedures. We will inspect the regulatory significance of the contract employees failure to report an arrest, 10 CFR 73.56(g), during the upcoming physical security baseline inspection scheduled for September 20 - 24, 2010. Should you have any questions concerning this letter, please contact us.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Scott M. Shaeffer, Chief Reactor Projects Branch 2 Division of Reactor Projects

Enclosure:

Synopsis, OI Case No. 2-2010-005

____ML102630065____________ G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:EICS RII:DRS SIGNATURE TXL3 SMS CEvans for MEE NAME TLighty SShaeffer ODeMiranda MErntes DATE 09/17/2010 09/17/2010 09/17/2010 09/17/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Official Use Only - OI Investigation Information This investigation was initiated by the U.S. Nuclear Regulatory Commission (NRC), Office of Investigations (OI), Region II, on October 28, 2009, to determine whether a former Electrician, employed by Williams Plant Services (Williams) and working at the Vogtle Nuclear Plant (Vogtle) willfully failed to report an arrest that occurred on September 13, 2009.

Based upon the evidence developed during the investigation, OI:RII determined that a former electrician, who was employed by Williams and working at Vogtle, was arrested on September 13, 2009, for driving under the influence of alcohol and failed to report the arrest as required.

However, OI:RII did not substantiate that the former electrician willfully failed to report the arrest to management in accordance with applicable procedure.

Approved for release by Oscar DeMiranda NOT FOR PUBLIC DISCLOSURE WITHOUT APPROVAL OF FIELD OFFICE DIRECTOR, OFFICE OF INVESTIGATIONS, REGION II Official Use Only - OI Investigation Information Case No. 2-2010-005 Enclosure