Summary of Meeting with Florida Power & Light Company (FPL) Regarding Forthcoming Submittal of the St. Lucie Unit 1 Extended Power Uprate (EPU)
ML102390035
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/19/2010
From: Orf T
Plant Licensing Branch II
To:
Florida Power & Light Co
Orf, T J, NRR/DORL/301-415-2788
Shared Package
ML102390062 List:
References
Download: ML102390035 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 19, 2010 LICENSEE: Florida Power & Light Company (FPL)

FACILITY: St. Lucie Plant Unit 1 SUB..IECT:

SUMMARY

OF AUGUST 18, 2010, MEETING WITH FPL REGARDING FORTHCOMING SUBMITTAL OF THE ST. LUCIE PLANT UNIT 1 EXTENDED POWER UPRATE On August 18, 2010, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of FPL at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the forthcoming submittal of the St. Lucie Unit 1 application for an Extended Power Uprate (EPU). FPL had originally submitted the EPU application on April 16, 2010, and subsequently withdrew the EPU application on August 13, 2010. A list of attendees is provided as an enclosure and the licensee's meeting slides are available in the Agencywide Document Management System at Accession No. ML102350232.

The first topic discussed was the inadvertent control element assembly at power event. The issue concerned analyzing the event at part-power levels for the effect on reactor coolant system pressure and departure from nucleate boiling. The licensee proposed performing the analyses at 5-percent power intervals and the NRC staff agreed that those intervals would provide more reasonable results. The NRC staff also requested more information on parameter assumptions used in the analyses.

The second topic discussed was the station blackout coping analysis. The majority of the questions related to clarifications of NRC guidance regarding performing the coping analysis.

The third topic related to spent fuel pool criticality analyses at Turkey Point, and St. Lucie. A criticality analysis has recently been submitted for Turkey Point, and the EPU submittal for St. Lucie Unit NO.2 will include an updated criticality analysis, so discussion on these units was limited. With regard to St. Lucie, Unit No.1, FPL will provide a bounding analysis with the St. Lucie Unit 1 EPU so that review of the EPU can continue, and at a later date the licensee will provide an updated criticality analysis of the current fuel in the spent fuel pool. The bounding analysis will incorporate input from a review of the current criticality analysis in light of the draft interim staff guidance on criticality analyses. The licensee would then add additional margin to those parameters identified as containing errors during the review above. A burnup penalty would then be developed for the multiple storage configuration and multiple points on the related loading curves. This burnup penalty would be implemented at St. Lucie Unit 1 until the updated criticality analysis could be submitted and review by the NRC staff.

-2 Members of the public were in attendance; however no Public Meeting Feedback forms were received from the public. Please direct any inquiries to me at 301-415-2788, or Jason Paige at 301-415-5888.

Tracy J. Ort, Project Manager Plant Licensing Branch, 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-335

Enclosure:

List of Attendees cc w/encls: Distribution via Listserv

LIST OF ATIENDEES AUGUST 18, 2010, MEETING WITH FLORIDA POWER & LIGHT COMPANY FORTHCOMING EXTENDED POWER UPRATE APPLICATION FOR ST. LUCIE UNIT 1 Attending in person: Attending via telephone:

Tom Alexion, NRC/NRR Keith Higar, AREVA Doug Broaddus, NRC/NRR Chris Lewis, AREVA Eva Brown, NRC/NRR Will Maxson, AREVA Davida Cunanan, NRC/NRR Tammy Natour, AREVA Paul Gill, NRC/NRR Joe Paljug, AREVA Allen Howe, NRC/NRR Mike Savela, AREVA Matt Kromer, NRC/NRR Bob Smith, AREVA G. Matharu, NRC/NRR Roy Mathew, NRC/NRR Jan Bostelman, Fort Calhoun Station Jason Paige, NRC/NRR Rich Roenigk, Fort Calhoun Station Mathew Panicker, NRC/NRR Matt Rybenski, Fort Calhoun Station Ben Parks, NRC/NRR Steve Callis, Fort Calhoun Station Trace Ort, NRC/NRR Tony Ulses, NRC/NRR P~lilip Tiemann, FPL Kent Wood, NRC/NRR William Freebairn, Nucleonics Week Liz Abbott, FPL Paul Kumar, Xcel Energy Steve Franzone, FPL Terry Jones, FPL Jay Kabadi, FPL Larry Nicholson, FPL Carl O'Farrill, FPL Emilio Fuentes, FPL Claude Villard, FPL Chris Wasik, FPL Stefan Anton, Holtec Tao He, Holtec Jay Left, Holtec Tracy Bishop, Westinghouse Ed Mercier, Westinghouse Enclosure

November 19, 2010

-2 Members of the public were in attendance; however no Public Meeting Feedback forms were received from the public. Please direct any inquiries to me at 301-415-2788, or Jason Paige at 301-415-5888.

IRA!

Tracy J. Orf, Project Manager Plant Licensing Branch, 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-335

Enclosure:

List of Attendees cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC TAlexion, NRR TOrf, NRR LPL2-2 r/f EBrown,NRR RidNrrDssSrxb RidsAcrsAcnw_MaiICTR DCunanan, NRR KWood, NRR RidsNrrDorlLpl2-2 RidsNrrDorl RidsNrrPMStLucie MKromer, NRR RidsNrrLACSola GMatharu, NRR RidsOgcRp RMathew, NRR RidsRgn2MailCenter JPaige, NRR CSteger, NRR MPanicker, NRR NSanfilippo, EDO BParks, NRR ADAMS Accession No. PKG ML102390062 Meeting Notice ML102250325 MeetlnCl

. Summarv ML102390035 Handou t 5 ML102350232 ,

OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC DORULPL2-2/PM NAME TOrt CSola(BClayton for) DBroaddus TOrt DATE 9/1/2010 8/31/2010 11/18/2010 11/19/2010 OFFICIAL RECORD COpy