WBN2Public Resource From: Hamill, Carol L [clhamill@tva.gov]

Sent: Monday, August 02, 2010 8:04 AM To: Wiebe, Joel; Raghavan, Rags; Milano, Patrick; Campbell, Stephen Cc: Crouch, William D; Boyd, Desiree L; Lyons, Sharon K; Arent, Gordon

Subject:

7-30-10_GL 95-07 RAI Response to NRC Attachments: image001.png; 7-30-10_GL 95-07 RAI Response to NRC.pdf Please see attached letter sent to the NRC today.

Carol L. Hamill Licensing/Quality Assurance WBN Unit 2 Project, EQB 1B WBN 4233653177

4233653833 clhamill@tva.gov 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 61 Mail Envelope Properties (25547F570B005144A141ECCA95DA1AB20CEDA1C0)

Subject:

7-30-10_GL 95-07 RAI Response to NRC Sent Date: 8/2/2010 8:03:42 AM Received Date: 8/2/2010 8:04:28 AM From: Hamill, Carol L Created By: clhamill@tva.gov Recipients:

"Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Lyons, Sharon K" <sklyons@tva.gov>

Tracking Status: None "Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Wiebe, Joel" <Joel.Wiebe@nrc.gov>

Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None Post Office: TVACOCXVS2.main.tva.gov Files Size Date & Time MESSAGE 215 8/2/2010 8:04:28 AM image001.png 12601 7-30-10_GL 95-07 RAI Response to NRC.pdf 179511 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 July 30, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391

Subject:

Watts Bar Nuclear Plant (WBN) Unit 2 - Response to Request for Additional Information Regarding Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves (TAC No. MD6717)

References:

1. NRC letter to TVA, Watts Bar Nuclear Plant, Unit 2 - Request for Additional Information Regarding Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves (TAC No.

MD6717), dated July 29, 2010

2. TVA letter to NRC, Watts Bar Nuclear Plant (WBN) - Unit 2 - Initial Responses to Bulletins and Generic Letters, dated September 7, 2007 [ML072570676]
3. TVA letter to NRC, Watts Bar Nuclear Plant (WBN) Unit 2 -

Supplemental Information Regarding Certain NRC Generic Letters and Bulletins, dated April 1, 2010 [ML100950044]

The purpose of this letter is to submit the Tennessee Valley Authority (TVA) response to U.S. Nuclear Regulatory Commission (NRC) request for additional information (RAI) regarding pressure locking and thermal binding of safety-related power-operated gate valves (Reference 1).

In a letter dated September 7, 2007 (Reference 2), TVA submitted initial information to the NRC regarding pressure locking and thermal binding of safety-related power-operated gate valves as related to Generic Letter 1995-07 for WBN Unit 2.

Supplemental information was submitted April 1, 2010 (Reference 3).

U.S. Nuclear Regulatory Commission Page 3 July 30, 2010 bcc (Enclosures):

Lakshminarasimh Raghavan U.S. Nuclear Regulatory Commission MS 08H4A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Stephen Campbell U.S. Nuclear Regulatory Commission MS 08H4A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Patrick D. Milano, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08H4 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Loren R. Plisco, Deputy Regional Administrator for Construction U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257

Enclosure 1 Response to NRC Request for Additional Information Regarding Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves Tennessee Valley Authority Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391

1. NRC Request Which valves related to GL 1995-07 require modifications? Please provide a list of these valves.

TVA Response The 95-07 review of WBN Unit 2 Generic Letter (GL) 89-10 motor operated valves (MOVs) has been completed with the following conclusions:

Eleven Valves Identified for Disk Modification

1. 2-FCV-1-16
2. 2-FCV-63-8
3. 2-FCV-63-11
4. 2-FCV-63-156
5. 2-FCV-63-157
6. 2-FCV-74-1
7. 2-FCV-74-2
8. 2-FCV-74-8
9. 2-FCV-74-9
10. 2-FCV-74-33
11. 2-FCV-74-35 Seven Valves Identified for Valve Bonnet Modification
1. 2-FCV-63-72
2. 2-FCV-63-73
3. 2-FCV-63-172
4. 2-FCV-72-40
5. 2-FCV-72-41
6. 2-FCV-72-44
7. 2-FCV-72-45 E1-1

Enclosure 1 Response to NRC Request for Additional Information Regarding Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves Additionally, controls for Valves 2-FCV-72-2 (EDCR 53292) and -39 (EDCR 53287) will be modified to add a time delay which will eliminate the potential for pressure locking, as is done with Unit 1 Valves 1-FCV-72-2 and -39. Note that this is a controls mod and not a valve modification. EDCRs 53292 and 53287 shall be implemented to eliminate the potential for pressure locking prior to startup.

2. NRC Request Which valves are missing from the list of valves related to GL 1995-07? Please provide a list of the missing valves.

TVA Response TVA has confirmed that none of the missing 89-10 valves from TVAs April 1, 2010, letter (Reference 3) are 95-07 valves. There are no missing GL 95-07 valves. The 20 valves identified above are currently installed in WBN Unit 2.

3. NRC Request Have there been any plant modifications that changed the original GL 1995-07 assessment for WBN Unit 1? If so, what is the impact of these modifications on WBN Unit 2?

TVA Response In addition to the time delay changes mentioned above, there are 2 other Unit 1 valves, 1-FCV-63-25 and -26, which are being evaluated for GL 95-07 impacts to address new input parameters from the Joint Owners Group (JOG) Topical Report MPR 2524A. Unit 1 has initiated a design change to address JOG pressure locking and MOV requirements. Valves 2-FCV-63-25 and -26 will be evaluated for impact due to new parameters from the JOG Topical Report MPR 2524A prior to startup.

E1-2

Enclosure 2 List of Regulatory Commitments Tennessee Valley Authority Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 Commitment Committed Date EDCRs 53292 and 53287 shall be implemented to eliminate the Prior to potential for pressure locking prior to startup. Startup Valves 2-FCV-63-25 and -26 will be evaluated for impact due to Prior to new parameters from the JOG Topical Report MPR 2524A prior to Startup startup.

E2-1