ML102180290
| ML102180290 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/06/2009 |
| From: | Chou R NRC/RGN-II |
| To: | Mark Franke NRC/RGN-II |
| References | |
| FOIA/PA-2010-0116 | |
| Download: ML102180290 (1) | |
Text
Morrissey, Thomas From:
Sent:
To:
Cc:
Subject:
Attachments:
Mark:
Chou, Rich ý;x Tuesday, October 06, 2009 4:54 PM Franke, Mark Carrion, Robert; Blake, Jerome; Plisco, Loren; Sykes, Marvin; Morrissey, Thomas; Reyes, Rogerio; Chou, Rich FW: Crystal River U3 Containment cracks Picture 031.JPG; DSC00009.JPG; DSC00011.JPG; DSC00012.JPG; DSC00014 (2).JPG; DSC00015.JPG; DSCO0032.JPG; DSCO0033.JPG; DSCO0051 (2).JPG; Picture 010.JPG; Picture 020.JPG From: Reyes, Rogerio Sent: Tuesday, October 06, 2009 4:18 PM To: Sykes, Marvin Cc: Chou, Rich
Subject:
Crystal River U3 Containment cracks Marvin and Rich, attached are the pictures of the containment. All four sides of the opening have cracks. As we discussed, the licensee is modifying the base plate for anchor bolting for SG replacement.
J, Rogerio Reyes, P.E.
U.S. Nuclear Regulatory Commission Resident Inspector Crystal River Nuclear Power Plant oodance with re reerom o