ML102170141
| ML102170141 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/26/2010 |
| From: | Weber T Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 102-06230-TNW/DFH, RIS-10-008 | |
| Download: ML102170141 (2) | |
Text
/AOM Palo Verde Nuclear Generating Station Thomas N. Weber Department Leader Regulatory Affairs Tel. 623-393-5764 Fax 623-393-5442 Mail Station 7636 PO Box 52034 Phoenix, Arizona 85072-2034 102-06230-TNW/DFH July 26, 2010 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, & 3 Docket Nos. STN 50-528/5291530 Response to Regulatory Issues Summary (RIS) 2010-08, "Preparation and Scheduling of Operator Licensing Examinations" This letter is Arizona Public Service Company's (APS) voluntary response to RIS 2010-08, "Preparation and Scheduling of Operator Licensing Examinations."
Attached to this letter is NRC Form 536 which provides Palo Verde's proposed schedule of examinations estimated for calendar years 2012 through 2015.
There are no commitments made to the NRC by this letter.
Please contact Ms. Marianne Webb (623) 393-5730 if you have any questions or would like additional information regarding this matter.
Sincerely, 4, W
.All TNW/MNW/DFH/gt Attachment - NRC Form 536 cc:
E. E. Collins Jr.
M. S. Haire L. A. Hurley J. R. Hall..
L. K. Gibson R. I. Treadway NRC Region IV, Regional Administrator NRC Region IV, Chief, Operations Branch NRC Region IV, Licensing Assistant, Operations Branch NRC NRR Senior Project Manager (send electronic and paper)
NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway - Comanche Peak
- Diablo Canyon
- Palo Verde - San Onofre
- South Texas
- Wolf Creek
ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Response to RIS 2010-08 Pg. 2 Attachment NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BYOMB: NO.3150-0131 EXPIRES: 10131/2011 (10.2008)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-001, or by intemet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs. NEOB-10202. (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conducl or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Palo Verde Nuclear Generating Station 50-528, 50-529, 50-530 I1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2012 Cy 2013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy 2 013 Cy 2014 CY 2 0 1 5 NUMBER OF REACTOR 16 12 0
12 OPERATORS NUMBER OF SENIOR REACTOR 7
5 0
5 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 03/19/2012*
09/16/2013 03/16/2015 ALTERNATE DATE 03/23/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I
NRC FORM 536 (10-2008)
- 2012 Initial Operator License Class selected in 2009 utilizing INPO ACAD 09-001.
PRINTED ON RECYCLED PAPER