UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 4, 2010 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
PLANT ST. LUCIE - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Nazar:
During the period of August 30, 2010, to September 3, 2010, the NRC will conduct baseline radiation safety inspection activities at your Plant St. Lucie site. The inspection will focus on the Public Radiation Safety Inspection cornerstone using NRC Inspection Procedure Number (IP) 71124.05, IP 71124.06, and IP 71124.07. In addition, the inspection will also review the public and occupational radiation safety performance indicators using IP 71151.
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to conduct a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has requested that the subject informational material be made available to the NRC staff by August 19, 2010, to allow preparation for the upcoming inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. D. Cecchett of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, George B. Kuzo at (404) 997-4658.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Dockets Nos.: 50-335, 50-389 License Nos.: DPR-67 and NPF-16
Enclosure:
Occupational Radiation Protection Inspection Document Request
G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS SIGNATURE GBK /RA/
BRB /RA/
NAME GKuzo BBonser DATE 08/04/2010 08/04/2010 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
FP&L 2
cc w/encl:
Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution Ronnie Lingle Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408 Seth B. Duston Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution
FP&L 3
Letter to Mano Nazar from Brian Bonser dated August 4, 2010
SUBJECT:
PLANT ST. LUCIE - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION Distribution w/encl:
C. Evans, RII OE Mail (email address if applicable)
RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource
Enclosure OCCUPATIONAL RADIATION SAFETY CORNERSTONE INSPECTION INFORMATION REQUEST SITE: Plant St. Lucie 05000335,389/2010004 PRE-INSPECTION VISIT:
Not Applicable INSPECTION DATES:
August 30 - September 3, 2010 NRC INSPECTORS:
George B. Kuzo, George.Kuzo@NRC.GOV Carmen Dykes, Carmen.Dykes@NRC.GOV Robert Kellner, Robert.Kellner@NRC.GOV ACCOMPANYING PERSONNEL:
IDENTIFIED LICENSEE CONTACTS: Radiation Controls - Christopher Martin, RPM/Brent Robinson (772 467-7501/7308); Effluent Processing - Al Locke (772 465-3550, X7049);
Groundwater Protection Initiative - Bruce Vogel (772 465-3550,X3986); Transportation/
Radwaste - Doug Haithcox (772 465-3550,X3704), Licensing/Compliance - Don Cecchett (x7155); REMP Pete Bailey [FP&L Corporate], 561-694-4179 Inspection Procedures:
IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment IP 71124.07 Radiological Environmental Monitoring Program IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation IP 71151 Performance Indicator Verification [Occupational And Public Radiation Safety Cornerstones]
Note: This is a broad list of the documents the NRC inspectors will be interested in obtaining and reviewing prior to the on-site inspection visit. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available. (The preferred file format is Word or searchable pdf files on CDROM. Please provide two copies of each electronic media device submitted.) Information in the document lists should contain enough information to be easily understood by someone who has a knowledge of the subject.
The lead inspector can answer questions regarding questions on specific information needs with licensee staff and may request additional documents.
GENERAL INFORMATION NEEDED:
Organization Charts and Contact Phone Numbers for:
o Radiation Protection o Chemistry Procedure for issuing Condition Report (CR) documents and assessing issues for risk significance and follow-up actions.
Updated Final Safety Analysis Report Chapters 11, Effluents/Radwaste; and Chapter 12 Radiation Protection.
2 Enclosure Current version/revision of the Offsite Dose Calculation Manual (ODCM).
Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY) 08 and CY 09.
Annual Radiological Effluent Release Report (ARERR) documents for CY 2008 and CY 2009.
Current Part 61 Analysis Results for Dry Active Waste (DAW)
Radioactive Gaseous and Liquid Treatment [IP 71124.06]
Site and/or corporate procedures associated with implementing the effluents and the groundwater monitoring program. Procedures should include those that address:
o Effluent sampling o Effluent monitor set-point determinations o Dose calculations o Groundwater monitoring and reporting of spills/leaks o Methodology for determining effluent stack/vent flow rates ARERRs for CYs 2008 and 2009. [Note: provided as part of the General Information Request and do not need to be duplicated.
List of all unmonitored spills, leaks, or unexpected liquid/gaseous discharges since January 2008. If applicable, provide the LER, event report, and/or special report.
List of non-radioactive systems that have become contaminated and any 10 CFR 50.59 evaluations performed.
List of any changes to the effluent release points or effluent treatment systems and associated 50.59 documentation.
Material condition surveillance records for effluent system components not readily accessible, including those inaccessible due to radiological conditions.
Effluent release permits for continuous gaseous, batch gaseous, continuous liquid, and/or batch liquid releases. Only provide permits for each category in June 2010.
Results of inter-laboratory comparison program for count lab for CY 2009 to 2010 YTD.
The last two surveillance results for ESF ventilation systems (e.g. system flow, HEPA, and charcoal filter tests).
Groundwater monitoring results since January 2010.
List of changes to written ground water monitoring program for identifying/controlling contaminated spills/leaks since January 2009.
List of onsite surface water bodies (e.g. ponds, retention basins, lakes) that contain or potentially contain radioactivity.
List of CAP condition report (CR) and audit documents generated since January 2009 related to liquid and gaseous effluent treatment and monitoring, unmonitored spills, leaks, or effluent discharges, or the groundwater monitoring program.
Radiological Environmental Monitoring Program [IP 71124.07]
Site and corporate procedures associated with radiological environmental monitoring, including:
3 Enclosure o Collection, preparation, and analysis of environmental samples including air samples, TLD stations, ground and surface water, sediment, vegetation, milk, fish, etc.
o Calibration and maintenance of air/water sampling equipment.
o Calibration and QC activities for sample counting instruments.
o Sampling and monitoring program to detect leaks from contaminated or potentially contaminated systems, structures, or components.
o Meteorological instrument calibration, operation, and routine surveillances.
AREOR CYs 2008 and 2009 [Note: provided as part of the General Information Request and do not need to be duplicated].
List of structures, systems, or components that contain or could contain licensed material for which there is a credible mechanism for the radioactive material to reach ground water.
Summary of leaks and/or spills since May January 2010, i.e. additions to the 50.75(g) file.
Calibration and maintenance records for REMP air and composite water samplers since January 2008.
Inter-laboratory comparison program results for the past two years (in-house or vendor laboratory).
Last two calibration /surveillance/maintenance records for the meteorological monitoring instruments since January 2008.
List of CAP CR and audit documents generated since January 2008 related to environmental monitoring activities.
Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation [IP 71124.08]
Provide Copy of Current Process Control Program (PCP).
Radioactive waste (Radwaste) Information Input Into the ARERRs for CYs 08 & 09.
Procedures/Guidance/Data Related to:
o transportation of radioactive material/radwaste o radwaste processing analysis, resin sluicing, and HIC dewatering o Part 61 Sampling and Analysis o Development/Evaluation of Scaling Factors and Application to Hard to Detect Radionuclides o Procedures for evaluation of Reactor Coolant System (RCS)/radioactive waste chemistry to verify stability of waste stream radionuclide composition Provide the following:
o list of shipments made since January 2009. Highlight 5 hottest shipments and any Type A Shipments made since January 2009, using Type A containers o list of changes made to solid radwaste processing systems since January 2009 o list all permanently abandoned radwaste processing equipment or systems o the two most recent 10 CFR Part 61 analyses for each waste stream. Note: only need to provide appropriate onsite contact or location were Part 61 waste stream analysis data are maintained o any data on indication of failed-fuel since January 2009 o list of CAP CR and audit documents related to shipping or radwaste since January 2009. Note: only provide titles/ summaries
4 Enclosure o any self-assessments/audits of shipping/radwaste processing program since January 2009 Transport Cask CoCs and associated documents for frequently used transport casks.
o Note: Copies not required prior to onsite inspection but listing of responsible staff/on-site document location and availability requested o Licensee procedures for cask loading and/or closure Performance Indicator (PI) Verification [IP 71151]
Monthly PI reports since January 2009, and copies of associated condition reports for any RETS/ODCM Radiological Effluent occurrences Liquid and gaseous effluent release permits which specify the quarterly (September -
December 2009), annual CY 2009, and 2nd quarter 2010 curies released by isotope and associated public dose assessments.
List of all corrective action documents since January 2009 using keywords such as: HRA, LHRA, VHRA, unintended dose, unlocked door, etc.
List of all electronic dosimeter (ED) dose rate alarms and all ED dose alarms since January 2009.