ML102160493
| ML102160493 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 07/28/2010 |
| From: | Joseph Pacher Constellation Energy Group, EDF Development, Nine Mile Point |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RG-1.147 | |
| Download: ML102160493 (11) | |
Text
/!
J. E. Pacher P.O. Box 63 Manager, Engineering Lycoming, New York 13093 315.349.5208 315.349.4156 Fax CENG a joint venture of
()Constellation eDF Energy 'ýoD NINE MILE POINT NUCLEAR STATION July 28, 2010 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:
Document Control Desk
SUBJECT:
Nine Mile Point Nuclear Station Unit No. 2; Docket No. 50-410 2010 Owners' Activity Report for Nine Mile Point, Unit 2, Refueling Outage 12 Inservice Examinations Pursuant to 10 CFR 50.55a, Nine Mile Point Nuclear Station, LLC is submitting the enclosed 2010 Owner's Activity Report for the Nine Mile Point Unit 2 twelfth refueling outage (RFO-12) inservice examination-s; This report summarizes the results of the examinations performed during RFO-12 for the First Inservice Inspection Period of both the Third Inservice Inspection Interval and the Second Containment Inspection Interval.
This report meets the requirements of the American Society of Mechanical Engineers (ASME) Code Case N-532-4, "Repair/Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission,Section XI, Division 1."
This code case is used as an alternative to the requirements of the ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6000 as approved by Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, Revision 15."
Should you have any questions regarding the information in this submittal, please contact J. J. Dosa, Director, Licensing (acting) at (315) 349-5219.
Very truly yours,
Document Control Desk July 28, 2010 Page 2 JEP/BC
Enclosure:
2010 Owners' Activity Report for Nine Mile Point, Unit 2, Refueling Outage 12 Inservice Examinations cc:
NRC Regional Administrator, Region I NRC Project Manager NRC Senior Resident Inspector
ENCLOSURE 2010 OWNERS' ACTIVITY REPORT FOR NINE MILE POINT, UNIT 2, REFUELING OUTAGE 12 INSERVICE EXAMINATIONS Nine Mile Point Nuclear Station, LLC July 28, 2010
0 CostlWat1o Enery Group Nine Mile Point Nuclear Station Constellation Nuclear Generation Corporate Fleet Engineering Programs 11 Market Place Baltimore Maryland 21202 Prepared For Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lake Road Lycoming, New York 13093 THIRD INSERVICE INSPECTION INTERVAL and SECOND CONTAINMENT INSPECTION INTERVAL FIRST INSERVICE INSPECTION PERIOD 2010 OWNER'S ACTIVITY REPORT FOR RFO-12 INSERVICE EXAMINATIONS (April 3, 2010through May 3, 2010)
Commercial Service Date:
April 5,1988 NRC Docket Number:
50-410 Document Number:
CENG-NMP2-OAR-003-12 Revision Number:
00 Date:
May 4, 2010 Prepared by:
(6'/I
.r/
Edward L. Anderson - Principal Engineer Analyst Corporate Fleet Engineering Programs Approved by:
(,
/ FA.-4&e.*1?#
Carl L Friant - Engineering Supervisor Corporate Fleet oeering Programs Reviewed by:
CZ Todd 1Da is -,*e IS1 Program Implementer Approved bA FioX40Ln es eg Todd A Fioo'nza - G~feraf~upervisor, Site Engineering Programs
Nine Mile Point Nuclear Station, Unit 2 CENG-NMP2-OAR-003-12 0
Constellation Energy GFoW THIRD INSERVICE INSPECTION INTERVAL Rev.
00 Nine Mile Point 2010 OWNERS' ACTIVITY REPORT Nuclear Station FOR Date:
May 4, 2010 INSERVICE EXAMINATIONS Page 2
of 8
TABLE OF CONTENTS T a b le o f C o nte n ts............................................................................................................................
2 A b s tra c t..................................................................................................................................................................
3 Form OAR-1 Owner's Activity Report for Inservice (ISI) Inspection Plan CNG-NMP2-ISI-003...........................
4 Form OAR-1 Owner's Activity Report for Containment (CISI) Inspection Plan CNG-NMP2-CISI-002................ 5 Table 1 Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service.......................
6 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service...........................................
7
Nine Mile Point Nuclear Station, Unit 2 CENG-NMP2-OAR-003-12 k~Constela!ion
[Enery G'oup THIRD INSERVICE INSPECTION INTERVAL Rev.
00 Nine Mile Point 2010 OWNERS' ACTIVITY REPORT Nuclear Station FOR Date:
May 4, 2010 INSERVICE EXAMINATIONS Page 3
of 8
ABSTRACT This Owner's Activity Report summarizes the results of the Nine Mile Point Unit 2 (NMP2), American Society of Mechanical Engineers (ASME)Section XI In-service Inspection and Containment Examinations performed during the 2010 Refueling Outage (RFO-12), from April 3, 2010 through May 3, 2010.
As an alternate to the requirements of the ASME Boiler and Pressure Vessel Code (B&PVC),Section XI, Article IWA-6000, Nine Mile Point Nuclear Station, LLC (NMPNS) has implemented ASME Code Case N-532-4, "Repair /
Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission,Section XI, Division 1."
OWNER'S ACTIVITY REPORTS - FORM OAR-1 The Owner's Activity Report Forms OAR-1 were prepared and certified upon completion of the 2010 refueling outage (RFO-12) examination activity for the following inspection plans:
CNG-NMP2-ISI-003, In-service Inspection Plan CNG-NMP2-CISI-002, Containment Inspection Plan In addition to the Owner's Activity Report, Forms OAR-i, the following Tables are also included:
- a.
Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service - Table 1 provides a listing of item(s) with flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, and Evaluation Description.
- b.
Abstract of RepairlReplacement Activities Required for Continued Service - Table 2 identifies those items containing flaws or relevant conditions that exceeded the ASME Section XI acceptance criteria (IWX-3000) or in the case of supports IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement or corrective measure, may not have resulted from an examination or test required by Section XI, and provides such information as Code Class, Item Description, Description of Work, Date Completed and the Repair/Replacement Plan Number.
In accordance with ASME Section XI, IWB-2412 (a), with the exception of the examinations that may be deferred until the end of the inspection interval as specified in Table IWB-2500-1, and for those examinations which NMPNS has requested and received approval in the form of relief request or alternative, the required examinations in each examination category have been completed for the First Inservice Inspection Period in accordance with Table IWB-2412-1.
Nine Mile Point Nuclear Station, Unit 2 CENG-NMP2-OAR-003-12 ElrW¢ Group THIRD INSERVICE INSPECTION INTERVAL Rev.
00 Nin:e Mile fir, 2010 OWNERS' ACTIVITY REPORT INSERVICE EXAMINATIONS Page 4
of 8
FORM OAR-1 OWNER'S ACTIVITY REPORT As required by the provisions of the ASME Code Case N-532-4 Report Number CENG-NMP2-OAR-003-012 Plant Nine Mile Point Nuclear Station, P. 0. Box 63, Lycomin., New York 13093 (Name and Address of Plant)
Plant Unit 2
Commercial Service Date April 5. 1988 Refueling Outage Number RFO-12 Current Inspection Interval Third Inservice Inspection Interval - April 5. 2008 to April 4. 2018 (1st, 2nd, 3rd, 4th, Other)
Current Inspection Period First Inservice Inspection Period - April 5, 2008 to April 4, 2011 (1st, 2nd, 3rd)
Edition and Addenda of Section Xl applicable to the Inspection Plan 2004 Edition, No Addenda Date and Revision of Inspection Plan CNG-NMP2-1SI-003, Revision 01, Dated August 28, 2009 Edition and Addenda of ASME Section XI applicable to Repairs and Replacements, if different than the Inspection Plan N/A CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct: (b) the examinations, tests meet the Inspection Plan as required by the ASME Code, Section XI: and (c) the repair/replacement activities and evaluations supporting the completion of RFO-01 2 conform to the requirements of Section XI.
(refueling outage number)
C
,t I
..... (Gener'l'SuI s'r - Corpo fate FIeet Engineering Programs) f CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the Slate or Province of New York and employed by Hartford Steam Boiler IHSBCT) of Hartford, Connecticut have inspected the items described in this Owners Activity Report and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section X1.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any mn sonaier njury or property damage or a loss of any kind arising from or connected with this inspection.
- ".....Cnmmissinn*
NR13.*19A I N NY !314 natureNatComisional Board Stte 9rvne an I
ENN dorsment nature National Board, State, Province, and Endorsements
Nine Mile Point Nuclear Station, Unit 2 CENG-NMP2-OAR-003-12 (lnemrgy *Oup THIRD INSERVICE INSPECTION INTERVAL Rev.
00 t',in.*ý Mile Pririt 2010 OWNERS' ACTIVITY REPORT Nucluar Sttion FOR Date:
May 4, 2010 INSERVICE EXAMINATIONS Page 5
of 8
FORM OAR-1 OWNER'S ACTIVITY REPORT
.As required by the provisions of the ASME Code Case N-532-4 Report Number CENG-NMP2-OAR-003-012 Plant Nine Mile Point Nuclear Station, P. 0. Box 63.,
Lycominc, New York 13093 (Name and Address of Plant)
Plant Unit 2
Commercial Service Date April 5. 1988 Refueling Outage Number RFO-12 Current Inspection Interval Second Containment Inspection Interval - April 5'. 2008 to April 4, 2018 (1st, 2nd, 3rd, 4th, Other)
Current Inspection Period First Containment Inspection Period - April 5. 2008 to April 4, 2011 (1st. 2nd, 3rd)
Edition and Addenda of Section XI applicable to the Inspection Plan 2004 Edition, No Addenda Date and Revision of Inspection Plan CNG-NMP2-CISI-002, Revision 01, Dated August 28, 2009 Edition and Addenda of ASME Section XI applicable to Repairs and Replacements, if different than the Inspection Plan N/A CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct: (b) the examinations and tests meet the Inspection Plan as required by the ASME Code. Section XI: and (c) the repair/replacement activities and evaluations supporting the completion of RFO-012 conform to the requirements ot Section XI.
(refueling outage number) signed
( 1(A i,'/Date 7/
(Generl Supervisoh7-Corporate Fleet Engineering Programs)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Bolter and Pressure Vessel Inspectors and the State or Province of New York and employed by Hartford Steam Boiler (HSBCT) of Hartfo-rd, Connecticut -
have inspected the items described in this Owner's Activity Report and state that to the. best of my knowledge and belief. the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore. neither the Inspector nor his employer shall be liable in any man r for any rnal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NB13519A I. N NY 5364 I
ectorfs Signature National Board. State. Province, and Endorsements Date
__/(C
Nine Mile Point Nuclear Station, Unit 2 CENG-NMP2-OAR-003-12 0
PConstellation Eneray Group THIRD INSERVICE INSPECTION INTERVAL Rev.
00 Nine Mile Point 2010 OWNERS' ACTIVITY REPORT Nuclear Station FOR Date:
May 4, 2010 INSERVICE EXAMINATIONS Page 6
of 8
TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE As reauired bv the orovisions of the ASME Code Case N-532-4 EVALUATION DESCRIPTION EXAMINATION ITEM ITEM CATEGORY NUMBER DESCRIPTION B-G-2 87.50 Flange Bolting (21CS-PB101)
Studs worn down and one broken during disassembly, CR-2010-003182 written, See Table 2.
4 4
+
4 4
+
4 4
4 4
4 I
I 1'
Nine Mile Point Nuclear Station, Unit 2 CENG-NMP2-OAR-003-12 0
ConsteIIlatio Energy WaW THIRD INSERVICE INSPECTION INTERVAL Rev.
00 Nine Mile Point 2010 OWNERS' ACTIVITY REPORT Nuclear Station FOR Date:
May 4, 2010 INSERVICE EXAMINATIONS Page 7
of 8
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE As required by the provisions of the ASME Code Case N-532-4 CODE ITEM DESCRIPTION DATE CLASS DESCRIPTION OF COMPLETED WORK REPAIR REPLACEMENT PLAN NUMBER Flange Bolting Replace Bolting 4-26-10 C90841244 4
1 1-4
- 4.
4 1
1-4 1
4
- 4.
1 I-4 4
4.
4 4
4
+
4 4
4
+
4 4
4 4-4
+
4 4-4 4
4 4.
1
- 4.
4 4.
4
+
4 4-4
+
4 4
4
- 4.
4 4
4
- 4.
4 4
4 t
t 4
4 4-4 4
Nine Mile Point Nuclear Station, Unit 2 CENG-NMP2-OAR-003-12 Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev.
00 Nine Mile Point 2010 OWNERS' ACTIVITY REPORT Nuclear Station FOR Date:
May 4, 2010 INSERVICE EXAMINATIONS Page 8
of 8
End of Inservice Inspection Owner's Activity Report For Refueling Outage Twelve (RFO-12)