ML102140114

From kanterella
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2010-08, Preparation & Scheduling of Operator Licensing Examinations
ML102140114
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 07/28/2010
From: Glover R
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-10-008
Download: ML102140114 (6)


Text

Mike Glover Duke GeneralManager, Nuclear Support (lEtWnergy Nuclear Generation Duke Energy Corporation 526 South Church Street Charlotte, NC 28202 Mailing Address:

P. 0. Box 1006 EC07H Charlotte, NC 28201-1006 July 28, 2010 704-382-6108 Mike. Glover@duke-energy.com U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 Response to NRC Regulatory Issue Summary 2010-08 Preparation and Scheduling of Operator Licensing Examinations On June 28, 2010, the NRC issued Regulatory Issue Summary (RIS) 2010-08, "Preparation and Scheduling of Operator Licensing Examinations." The subject RIS requested an update to the NRC on projected schedules for site-specific operator licensing examinations and on the estimated numbers of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs).

NRC Form 536, "Operator Licensing Examination Data" is attached as requested for Oconee, McGuire, and Catawba Nuclear Stations.

Please direct any questions to L. B. Jones at (704) 382-4753.

Sincerely, Mike Glover Attachments k003 ijix www.duke-energy.com

U. S. Nuclear Regulatory Commission July 28, 2010 Page 2 xC:

L. A. Reyes, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 J. F. Stang, Jr., Senior Project Manager (ONS)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 J. H. Thompson, Project Manager (CNS & MNS)

U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 A. T. Sabisch NRC Senior Resident Inspector Oconee Nuclear Station J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station G. A. Hutto, III NRC 'Senior Resident Inspector Catawba Nuclear Station

U. S. Nuclear Regulatory Commission July 28, 2010 Page 3 bxc:

K. R. Alter - ON03RC K. L. Ashe - MG01 RC R. D. Hart - CN01 RC J. E. Smith - ON03RC K. L. Crane - MG01 RC T. K. Pasour- CN01RC S. A. Helms - MG03OT

  • J. R. Steely - ON040T S. P. Tripi - CT01A NCMPA-1 PMPA NCEMC ONS Master File - ON02DM (File OS 801.01)

MNS Master File - MG01 DM (File MG 801.01)

CNS Master File - CN04DM (File CN 801.01)

ELL - EC050

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet OPERATOR LICENSING e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and EXAMINATION DATA Budget, Washington, DC 20503. Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Oconee Nuclear Site II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 12 CY 13 CY 14 CY 15 ESTIMATED NUMBER OF LICENSEE-PREPARED 2 2 2 2 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 12 CY 13 CY 14 CY 15 NUMBER OF REACTOR 6 6 6 6 6 6 6 6 OPERATORS NUMBER OF 'SENIOR REACTOR OPERATORS - INSTANT 2 2 2 2 2 2 2 2 NUMBER OF SENIOR REACTOR 1 1 1 1 1 1 1 1 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 0 0 PROPOSED DATES PRIMARY DATE 6-11-12 12-10-12 6-10-13 12-09-13 6-09-14 12-08-14 6-08-15 12-07-15 ALTERNATE DATE 6-25-12 12-03-12 6-24-13 12-02-13 6-23-14 12-01-14 6-22-15 11-30-15 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CYl1 CY 12 NUMBER MARCH JUNE SEPTEMBER - DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 8 0 0 8 8 0 0 8 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate Regulatory Nuclear to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-1 0202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person, is not required to respond to, the information collection.

FACILITY NRC REGION McGuire Nuclea'r Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 12 Cy 13 CY 14 Cy 15 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 12 CY 13 CY 14 CY 15 NUMBER OF REACTOR 10 11 10 9 OPERATORS NUMBER OF SENIOR REACTOR 4 1 1 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 07/30/2012 07/29/2013 07/28/2014 08/03/2015 ALTERNATE DATE 08/20/2012 08/19/2013 08/18/2014 08/17/2005 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 11 CY 12 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 0 0 0 12 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a'person is not required to respond to, the information collection.

FACILITY NRC REGION Catawba Nuclear Station II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 12 Cy 13 Cy 14 Cy 15 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 12 CY 13 CY 14 CY 15 NUMBER OF REACTOR 6 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 3 0 3 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 6 0 6 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 08/20/2012 06/16/2014 ALTERNATE DATE 08/27/2012 06/23/2014 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 11 Cy 12 PROPOSED NUMBER MRH MARCH JN JUNE AC SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 9 0 0 0 CANDIDATES NRC FORM 536 (10'-2008) PRINTED ON RECYCLED PAPER