ML101950383
| ML101950383 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 07/09/2010 |
| From: | St.Onge R Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Security and Incident Response |
| References | |
| Download: ML101950383 (1) | |
Text
SOUTHERN CALIFORNIA Richard 1. St. Onge-ED SON Rhr.Director Nuclear Regulatory Affairs An EDISON INTERNATIONALt Company 10 CFR 50.54(p)
July 9, 2010 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Docket Nos. 50-361, 50-362 and 72-41 San Onofre Nuclear Generating Station, Units 2 and 3, and Independent Spent Fuel Storage Installation
Dear Sir or Madam:
Southern California Edison (SCE) has made changes to the Physical Security Plan for the San Onofre Nuclear Generating Station (SONGS) that SCE has determined do not decrease the safeguards effectiveness of these plans.
In accordance with 10 CFR 50.54(p)(2), a report containing a description of these changes is enclosed for your information and a record of the changes has been made and is available for inspection at SONGS.
There are no new regulatory commitments made by this letter or its enclosures.
Note that the enclosures to this letter contain safeguards information. This letter may be decontrolled upon separation from its enclosures.
If you have any questions regarding this matter, please contact Mr. S. D. Root at (949) 368-6480.
Sincerely, Enclosure (SGI) cc:
E. E. Collins, Regional Administrator, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 & 3 S. Helton, NRC Project Manager, San Onofre ISFSI G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 & 3 SAFEGUARDS INFORMATION Notice: Decontrolled upon separation from the enclosure.
0o San Clemente, CA 92674 WýAD/
"-ff