ML101590745

From kanterella
Jump to navigation Jump to search
June 2, 2010, Summary of Open House Public Meeting to Discuss NRC Activities, Nuclear Power Issues, and the Clinton Power Station 2009 End-of-Cycle Plant Performance Assessment
ML101590745
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/08/2010
From: Ring M
NRC/RGN-III/DRP/B1
To:
References
Download: ML101590745 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 8, 2010 LICENSEE: Exelon Generation Company, LLC FACILITY: Clinton Power Station

SUBJECT:

SUMMARY

OF THE JUNE 2, 2010, OPEN HOUSE PUBLIC MEETING TO DISCUSS NRC ACTIVITIES, NUCLEAR POWER ISSUES, AND THE CLINTON POWER STATION 2009 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On June 2, 2010, the Nuclear Regulatory Commission (NRC) held an open house at the Elks Club in Clinton, Illinois. The purpose of the open house was to provide opportunities to discuss NRC activities, nuclear power issues, and Clinton Power Station performance for the 2009 calendar year with the public. The NRC letter and meeting notice for this open house can be found in the Agencywide Documents Access and Management System (ADAMS) as ML101300031 and ML101300026, respectively. A list of principal meeting attendees can be found in the Enclosure.

The open house discussed an overview of the NRCs Mission and Strategic Goals, the Reactor Oversight Process (ROP), and national ROP results. The NRC discussed other agency regulatory activities such as nuclear security and safeguards, the license renewal process, spent nuclear fuel and independent spent fuel storage installations, radiation safety, and new nuclear power plant construction, and licensing activities.

The NRC also provided discussions related to the NRCs assessment of the Clinton Power Stations 2009 annual performance, which was documented in the March 3, 2010, End-of-Cycle Assessment Letter, under ML100610331. As part of this open house, both Exelon and the Illinois Emergency Management Agency (IEMA) were available to answer questions. Slides used to describe the NRC ROP process and Clinton Stations 2009 performance can be found in ADAMS under ML101550244. Throughout the open house, members of the public were given the opportunity to ask questions of NRC officials.

/RA/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

As Stated

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 8, 2010 LICENSEE: Exelon Generation Company, LLC FACILITY: Clinton Power Station

SUBJECT:

SUMMARY

OF THE JUNE 2, 2010, OPEN HOUSE PUBLIC MEETING TO DISCUSS NRC ACTIVITIES, NUCLEAR POWER ISSUES, AND THE CLINTON POWER STATION 2009 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On June 2, 2010, the Nuclear Regulatory Commission (NRC) held an open house at the Elks Club in Clinton, Illinois. The purpose of the open house was to provide opportunities to discuss NRC activities, nuclear power issues, and Clinton Power Station performance for the 2009 calendar year with the public. The NRC letter and meeting notice for this open house can be found in the Agencywide Documents Access and Management System (ADAMS) as ML101300031 and ML101300026, respectively. A list of principal meeting attendees can be found in the Enclosure.

The open house discussed an overview of the NRCs Mission and Strategic Goals, the Reactor Oversight Process (ROP), and national ROP results. The NRC discussed other agency regulatory activities such as nuclear security and safeguards, the license renewal process, spent nuclear fuel and independent spent fuel storage installations, radiation safety, and new nuclear power plant construction, and licensing activities.

The NRC also provided discussions related to the NRCs assessment of the Clinton Power Stations 2009 annual performance, which was documented in the March 3, 2010, End-of-Cycle Assessment Letter, under ML100610331. As part of this open house, both Exelon and the Illinois Emergency Management Agency (IEMA) were available to answer questions. Slides used to describe the NRC ROP process and Clinton Stations 2009 performance can be found in ADAMS under ML101550244. Throughout the open house, members of the public were given the opportunity to ask questions of NRC officials.

/RA/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

As Stated DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC CY 2009\EOC letters\EOC Meeting Summaries\Clinton 2009 EOC Mtg Summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME MRing:dtp DATE 06/08/10 OFFICIAL RECORD COPY

PUBLIC MEETING PRINCIPAL ATTENDEES June 2, 2010 NRC M. Ring, Branch Chief, Branch 1, Division of Reactor Projects, Region III B. Kemker, Senior Resident Inspector, Clinton Station D. Lords, Resident Inspector, Clinton Station G. Stauffer, Resident Inspector Office, Clinton Station Exelon M. Kanavos, Plant Manager, Clinton Station B. Harris, Public Affairs, Clinton Station Other Attendees S. Mischke, Illinois Emergency Management Agency (IEMA)

R. Zuffa, IEMA S. Martin, Piatt County Chairperson

Letter to Exelon Generation Company, LLC, from M. Ring dated June 8, 2010.

SUBJECT:

SUMMARY

OF THE JUNE 2, 2010, OPEN HOUSE PUBLIC MEETING TO DISCUSS NRC ACTIVITIES, NUCLEAR POWER ISSUES, AND THE CLINTON POWER STATION 2009 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak ROPreports Resource