Request for Additional Information, Fourth Interval Inservice Inspection Plan and Associated Proposed Alternatives and Relief Request ME3317
ML101520281
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/01/2010
From: V Sreenivas
Plant Licensing Branch II
To: Thorpe A
Office of Nuclear Reactor Regulation
Sreenivas V.NRR/DORL/LPL2-1 415-2597
References
TAC ME3317
Download: ML101520281 (3)


Text

From: Sreenivas, V Sent: Tuesday, June 01, 2010 11:56 AM To: Thorpe, April Cc: Lingam, Siva; Cotton, Karen; Kulesa, Gloria

Subject:

FW: NAPS Unit 2, Request for Information: Fourth Interval Inservice Inspection Plan and Associated Proposed Alternatives and Relief Requests-ME3317 April: please place this RAI in ADAMS, immediately available for public.

Siva/Karl: Please enter todays date for RAI issued to licensee for ME3317. Thank you -V From: Sreenivas, V Sent: Tuesday, June 01, 2010 11:51 AM To: 'david.heacock@dom.com' Cc: 'Tom Shaub'; 'david.sommers@dom.com'; Kulesa, Gloria; Bedi, Gurjendra

Subject:

NAPS Unit 2, Request for Information: Fourth Interval Inservice Inspection Plan and Associated Proposed Alternatives and Relief Requests-ME3317 REQUEST FOR ADDITIONAL INFORMATION (RAI)

This e-mail is in reference to Virginia Electric and Power Company (Dominion), North Anna Power Station (NAPS) Unit 2, Fourth Interval Inservice Inspection Plan and Associated Proposed Alternatives and Relief Requests, Docket 50-339, letter dated February 1, 2010 (ML100330125).

The U.S. Nuclear Regulatory Commission (NRC) staff needs the following additional information to complete its review. These RAIs are applicable to snubber inservice inspection and testing.

RAI 1: The submitted Relief Request, Section 4, Reason for Request, page 3-7, Visual Inspection, third paragraph states Historically, the number of unacceptable visual snubber inspections at NAPS Unit 2 is one or less and based on the snubber population, the current inspection interval is 48 months (every other refueling outage). Please explain (1) What is the meaning of less than one unacceptable snubber during visual inspection (snubber inspection cannot be counted less than one)?

(2) What method of categorizing (small bore, large bore or combined one population) snubbers is being used while performing visual inspections at NAPS 2?.

RAI 2: OM Part 4 requires NAPS 2 to use a 10% test plan, 37 snubber test plan or 55 snubber test plan. In the submitted relief request, NAPS 2 uses two different sampling plans (1) one for small bore; and (2) another for large bore snubbers. Please explain the reason and basis for using two different and separate test sampling plans for small and large bore snubbers.

RAI 3: TRM page 3.7.5-5, second paragraph, fifth line, states If the failure is determined to be generic, an additional 10% of that type of snubber shall be functionally tested. If the failure is determined to be non-generic, an additional 10% of that type snubber will be tested during the next functional test period. Please explain the following:

a. Provide details about generic and non-generic failures, and provide the section number of the OM-4 Code, which is being used for this requirement.
b. Define functional test period, and provide justification to delay the required additional testing to the next functional test period. (Note: the Code requires that additional functional testing to be performed in the same period/interval.)

RAI 4: OM-4, Paragraph 3.2.4.2, Test Failure Mode Group, states that unacceptable snubber(s) shall be categorized into failure mode group(s). A test failure mode group(s) shall include all unacceptable snubbers that have a given failure mode, and all other snubbers subject to the same failure mode. Please explain whether and how these requirements will be met by using Technical Requirement Manual (TRM) 3.7.5.

RAI 5: The submitted Relief Request, Section 4, Reason for Request, page 3-6, second line states The existing TRM test and examination requirements meet the intent of ASME OM Part 4 and provide an acceptable level of quality and safety. However, this Relief Request, Section 5, Proposed Alternative and Basis for Use, page 3-13, third paragraph states No other requirements of OM Part 4 will be implemented as part of this alternative for snubber inservice inspection and testing. Please explain and clarify why Section 5 of this relief request states that No other requirements of OM Part 4 will be implemented, when Section 4 states that the existing TRM meets the intent of OM Part 4.

Please submit the docketed response to these RAI's by June 30, 2010. If you have any questions, please me at 301-415-2597.

V. Sreenivas, PH.D., C.P.M.,

Project Manager, Rm.#O8F6, LPL2-1 North Anna Power Reactors, Units 1 and 2 Division of Operating Reactor Licensing-NRR (301) 415-2597, v.sreenivas@nrc.gov

      • This email message, and any files transmitted with it, may contain confidential, non-public, sensitive and proprietary data intended solely for the person(s) to whom this email message is directly addressed. Unauthorized use of the data contained in this message is prohibited. If you are not the intended recipient of this message or have received this message in error, please notify the sender immediately by telephone or email Reply and delete the original message and any attachments without keeping a copy***

E-mail Properties Mail Envelope Properties (AF843158D8D87443918BD3AA953ABF780DD5AC47EF)

Subject:

FW: NAPS Unit 2, Request for Information: Fourth Interval Inservice Inspection Plan and Associated Proposed Alternatives and Relief Requests-ME3317 Sent Date: 6/1/2010 11:55:35 AM Received Date: 6/1/2010 11:55:35 AM From: Sreenivas, V Created By: V.Sreenivas@nrc.gov

Recipients:

April.Thorpe@nrc.gov (Thorpe, April)

Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)

Tracking Status: None Karen.Cotton@nrc.gov (Cotton, Karen)

Tracking Status: None Gloria.Kulesa@nrc.gov (Kulesa, Gloria)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 26225 6/1/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: