Comanche Nuclear Power Plant, Units 1 and 2, Notification of NRC Initial Operator Licensing Examination 05000445/2010302; 05000446/2010302
ML101410758
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/20/2010
From: Mark Haire
Operations Branch IV
To: Flores R
Luminant Generation Co
References
50-445/10-302, 50-446/10-302
Download: ML101410758 (5)


See also: IR 05000445/2010302

Text

May 20, 2010

Rafael Flores, Senior Vice President

and Chief Nuclear Officer

Luminant Generation Company, LLC

Comanche Peak Nuclear Power Plant

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT:

COMANCHE NUCLEAR POWER PLANT, UNITS 1 and 2 - NOTIFICATION OF

NRC INITIAL OPERATOR LICENSING EXAMINATION 05000445/2010302;

05000446/2010302

Dear Mr. Flores:

In a telephone conversation on May 11, 2010, between Messrs. Garry Struble, Operations

Training Supervisor, and Clyde Osterholtz, Acting Chief Examiner. Arrangements were made

for the validation and administration of a retake licensing examination (operating test only) at

Comanche Peak Nuclear Power Plant during the week of July 5, 2010.

As agreed during the telephone conversation, your staff will prepare the examination based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examination is

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by June 1, 2010. The operating test and supporting reference materials identified in

Attachment 3 to ES-201 will be due by June 15, 2010. Pursuant to Title 10, Section 55.40(b)(3),

of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the

facility licensee shall approve the outlines and test before they are submitted to the NRC for

review and approval. All materials shall be complete and ready-to-use. We request that any

personal, proprietary, sensitive unclassified, or safeguards information in your response be

contained in a separate enclosure and appropriately marked. Any delay in receiving the

required examination and reference materials, or the submittal of inadequate or incomplete

materials, may cause the examinations to be rescheduled.

In order to conduct the requested operating test, it will be necessary for your staff to provide

adequate space and accommodations in accordance with ES-402, and to make the simulation

facility available on the dates noted above. In accordance with ES-302, your staff should retain

the original simulator performance data (e.g., system pressures, temperatures, and levels)

generated during the dynamic operating tests until the examination results are final.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

Luminant Generation Company, LLC

- 2 -

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any)(OMB approval number 3150-0090) by June 15, 2010. If the applications are

not received by June 15, 2010, a postponement may be necessary. Signed applications

certifying that all training has been completed should be submitted at least 14 days before the

examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act

of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018. The public reporting burden for this collection of information is

estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, and completing and reviewing the collection of

information. Send comments regarding this burden estimate or any other aspect of these

information collections, including suggestions for reducing the burden, to the Records and

FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Thank you for your cooperation in this matter. Mr. Garry Struble has been advised of the

policies and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Clyde Osterholtz at 817-860-8269,

or myself at 817-860-8159.

Sincerely,

/RA/

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-445; 50-446

Licenses: NPF-87; NPF-89

Luminant Generation Company, LLC

- 3 -

DISTRIBUTION:

Mr. Fred W. Madden, Director

Oversight and Regulatory Affairs

Luminant Generation Company LLC

P.O. Box 1002

Glen Rose, TX 76043

Timothy P. Matthews, Esq.

Morgan Lewis

1111 Pennsylvania Avenue, NW

Washington, DC 20004

County Judge

P.O. Box 851

Glen Rose, TX 76043

Mr. Richard A. Ratliff, Chief

Bureau of Radiation Control

Texas Department of Health

P.O. Box 149347, Mail Code 2835

Austin, TX 78714-9347

Environmental and Natural

Resources Policy Director

Office of the Governor

P.O. Box 12428

Austin, TX 78711-3189

Honorable Walter Maynard

County Judge

P.O. Box 851

Glen Rose, TX 76043

Mr. Brian Almon

Public Utility Commission

William B. Travis Building

P.O. Box 13326

Austin, TX 78711-3326

Luminant Generation Company, LLC

- 4 -

Ms. Susan M. Jablonski

Office of Permitting, Remediation

and Registration

Texas Commission on

Environmental Quality

MC-122

P.O. Box 13087

Austin, TX 78711-3087

Anthony Jones

Chief Boiler Inspector

Texas Department of Licensing

And Regulation

Boiler Division

E.O. Thompson State Office Building

P.O. Box 12157

Austin, TX 78711

Chief, Technological Hazards

Branch

FEMA Region VI

800 North Loop 288

Federal Regional Center

Denton, TX 76209

Luminant Generation Company, LLC

- 5 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

Deputy Regional Administrator (Chuck.Casto@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov )

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov )

Senior Resident Inspector (John.Kramer@nrc.gov )

Resident Inspector (Brian.Tindell@nrc.gov )

Branch Chief, DRP/A (Wayne.Walker@nrc.gov )

Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)

Project Engineer, DRP/A (Nick.Hernandez@nrc.gov )

Project Engineer, DRP/A (Laura.Micewski@nrc.gov )

CP Administrative Assistant (Sue.Sanner@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Public Affairs Officer (Lara.Uselding@nrc.gov )

Project Manager (Balwant.Singal@nrc.gov )

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

Regional Counsel (Karla.Fuller@nrc.gov )

Congressional Affairs Officer (Jenny.Weil@nrc.gov )

OEMail Resource

ADAMS ML101410758

ADAMS: No Yes

SUNSI Review Complete

Reviewer Initials: CCO

Publicly Available

Non-Sensitive

Non-publicly Available

Sensitive

SOE:OB

C:OB

COsterholtz

MHaire

/RA/

/RA/ CCO for

5/19/10

5/20/10