ML101380297

From kanterella
Jump to navigation Jump to search
Transmittal of TVA EEB-TI-28, Branch Technical Instruction, Setpoint Calculations
ML101380297
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 05/13/2010
From: Bajestani M
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML101380297 (2)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 May 13, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391

Subject:

Watts Bar Nuclear Plant (WBN) Unit 2 - Transmittal of TVA EEB-TI-28, Branch Technical Instruction, "Setpoint Calculations" The purpose of this letter is to provide the U.S. Nuclear Regulatory Commission (NRC) with a copy of Tennessee Valley Authority (TVA) EEB-TI-28, Branch Technical Instruction, "Setpoint Calculations," as requested during a conversation between the NRC Staff and TVA. Specific information requested by the NRC pertains to the Westinghouse-prepared calculations provided on Pages 29, 30, 55, and Appendix A, Section 3.1.21. The enclosure to this letter provides the requested information.

There are no regulatory commitments associated with this submittal. If you have any questions, please contact William Crouch at (423) 365-2004.

Sincerely, Masoud B tani Watts Ba it 2 Vice President

Enclosure:

1. Tennessee Valley Authority, Division of Nuclear Engineering, Instrumentation &

Controls Department, EEB-TI-28, Branch Technical Instruction, "Setpoint Calculations" cc: see page 2 Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 May 13, 2010 cc (Enclosure):

U. S. Nuclear Regulatory Commission' Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381