Transmittal of Amendment 98 to Final Safety Analysis Report
ML101340794
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 05/07/2010
From: Bajestani M
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML101340794 (16)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 May 7, 2010 10 CFR 50.4(b)(6) 10 CFR 50.34(b) 10 CFR 2.390(d)(1)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Docket No. 50-391 7

Subject:

WATTS BAR NUCLEAR PLANT (WBN) - UNIT 2 - FINAL SAFETY ANALYSIS REPORT (FSAR), AMENDMENT 98

Reference:

TVA letter to the NRC dated January 11, 2010, "Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report Amendment 97" This letter transmits WBN Unit 2 FSAR Amendment 98 (A98), which reflects changes made since the issuance of Amendment 97 (A97) on January 11, 2010 (Reference). This Unit 2 amendment incorporates the most recent probable maximum flood evaluation data into Section 2.4, "Hydrologic Engineering," and changes resulting from TVA's re-review of each section of the referenced FSAR amendment (A97). The purpose of this re-review was to identify changes previously incorporated by earlier FSAR amendments that were not properly annotated with revision bars and to identify other editorial, administrative, and typographical errors that may not have been corrected. Additionally, new substantive changes were identified in other FSAR sections as a result of the re-review, as well as changes resulting from design activities. contains a "Summary Listing" of FSAR sections and corresponding Unit 2 change package numbers associated with the A98 FSAR changes. Enclosure 2 contains a background summary of WBN Unit 2 FSAR development process and provides a description of the FSAR re-review effort. The editorial and administrative changes that were identified during the re-review were not annotated with revision bars, but a detailed list of these changes will be made available for NRC use.

Additionally, future amendments are anticipated due to the potential for FSAR changes resulting from resolution of outstanding Requests for Information from NRC. Further, as modifications in the plant are completed and inspected to determine as-constructed Acs3 Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 May 7, 2010 configurations, affected calculations and analysis can be finalized which may result in changes to the FSAR. For example, FSAR tables that currently contain Unit 1 data (e.g.,

data comprised of stresses at pipe break locations, etc.,) can then be updated to reflect actual Unit 2 data once the analysis can be completed based on the actual as-built configuration.

It is important to note that wind speed data contained in Section 2.3, "Meteorology," has been revised in this amendment to reinstate the original data in tables provided in Amendment 91. This data was found to be corrupted due to the FSAR A92 Framemaker conversion activity. An additional revision to Section 2.3 is also expected to address NRC's request for information. A revision to Section 2.3 will be submitted to NRC by May 28, 2010.

FSAR A98 is contained on the enclosed Optical Storage Media (OSM #1) (Attachment 1).

The FSAR contains security-related information identified by the designation "Security-Related Information - Withhold Under 10 CFR 2.390." TVA hereby requests this information be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390. A redacted version of the FSAR is contained on OSM #2 (Attachment 2), which is suitable for public disclosure. Enclosure 3 contains a listing of the FSAR pages that have been redacted. Enclosure 4 contains the new commitment contained in this letter. Enclosure 5 lists the files and file sizes on the security-related OSM (OSM #1), and Enclosure 6 lists the files and file sizes on the publicly available OSM (OSM #2).

This letter does not close any "Generic Communications." If you have any questions, please contact me at (423) 365-2351.

I declare under the penalty of perjury that the foregoing is true and correct. Executed on May 7, 2010.

Sincerely, Masoud B sni Watts Bar 2 Vice President

Enclosures:

(See Page 3)

U.S. Nuclear Regulatory Commission Page 3 May 7, 2010

Enclosures:

1. WBN Unit 2 FSAR A98, "Summary Listing of A98 FSAR Changes"
2. WBN Unit 2 FSAR A98, "Background of WBN Unit 2 FSAR Change Process and Description of Re-Review Effort"
3. WBN Unit 2 FSAR A98, "Summary of Redacted Pages"
4. WBN Unit 2 FSAR A98, "New Commitment"
5. List of files and file sizes on the security-related OSM (OSM #1)
6. List of files and file sizes on the publicly available OSM (OSM #2)

Attachments:

1. OSM #1: WBNP Unit 2 FSAR Amendment 98 - Security-Related Information - Withhold Under 10 CFR 2.390
2. OSM #2: WBNP Unit 2 FSAR Amendment 98 - Public Version cc (w/enclosures):

U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

ENCLOSURE 1.

WBN Unit 2 FSAR A98 "Summary Listing of A98 FSAR Changes" Item Change No.

Section Section Title Package Number

1.

2.3 Meteorology 2-98-18

2.

2.4 Hydrologic Engineering 2-98-19

3.

3.2 Classification of Structures, Systems and Components 2-98-03

4.

3.8.B Multiple Load Combinations Various Plant Conditions 2-98-38

5.

3.8.5 Foundation and Concrete Supports 2-98-34

6.

3.8.6 Category 1 (L) Cranes 2-98-15

7.

3.9 Mechanical Systems and Components 2-98-05

8.

4.4 Thermal Hydraulic Design 2-98-41 2-98-06

9.

5.2 Integrity of RCS Pressure Boundary 2-98-13

10.

5.2.8 In-Service Inspection of ASME Code Class 1 Components 2-98-37

11.

5.5 Component and Subsystem Design 2-98-08

12.

5.5.2.4 In-service Inspection of Steam Generator Tubes 2-98-23

13.

6.1 Coating Inside Primary Containment 2-98-25

14.

6.2.1 Containment Functional Design 2-98-16

15.

6.2.2 Containment Heat Removal Systems 2-98-02 6.2.4 2-98-26

16.

8.3.1 Fiber Optic Electrical Penetration Feed-Throughs 2-98-33 8.3.12-98-33

17.

6.2.4 Installation of Sense Lines Penetrating the SCV 2-98-31 2-98-01

18.

6.2.6 Containment Leakage Testing 2-98-11 2-98-29 2-98-32

19.

7.1 Instrumentation and Controls 2-98-21

20.

7.3 Engineered Safety Features Actuation System 2-98-17 2-98-12

21.

8.2 Offsite (Preferred) Power System 2-98-30 8.2.1

22.

8.2.2 BOP Load Shed Logic 2-98-27

ENCLOSURE I WBN Unit 2 FSAR A98 "Summary Listing of A98 FSAR Changes" Item Change No.

Section Section Title Package' Number

23.

8.3.1.1 Revise to Allow Safeguard Test 2-98-20

24.

9.2 Water Systems 2-98-07 2-98-28

25.

9.2.4 New Sewage Treatment Process 2-98-36

26.

9.3 Process Auxiliaries 2-98-10

27.

9.4 Air Conditioning, Heating, Cooling, and Ventilation Systems 2-98-09

28.

10.1 Main Steam and Power Conversion Systems (Summary Description) 2-98-14

29.

11.2.6 Estimated Total Liquid Releases 2-98-39 2-98-22

30.

11.3 Table 11.3-11, Individual Doses From Gaseous Effluents 2-98-40 2-98-40 2-98-35

31.

12.3.1 Radiation Protection Design Features 2-98-42 2-98-42

32.

15.2 Condition II - Faults of Moderate Frequency 2-98-04 Coincident Loss of Onsite and External AC Power to the Station -

2-98-24 Loss of Offsite Power to the Station Auxiliaries

ENCLOSURE2 WBN Unit 2 FSAR A98 "Background of WBN Unit 2 FSAR Change Process and Description of Re-Review Effort"

Background

Upon TVA's decision to complete WBN Unit 2, initial discussions between WVA and the NRC Staff concerning development of the FSAR resulted in an agreement that WBN Amendment 91 (A91) would be the baseline for Unit 2. FSAR A91 was originally placed on both Unit 1 and Unit 2 dockets on October 24, 1995, which was the last time that the WBN FSAR was placed upon both dockets prior to Unit 1 being licensed. As a result of the above discussions, A91 was subsequently resubmitted on July 2, 2008. The resubmitted A91 was created by scanning a historical copy and then Optical Character Recognizing (to enable search capability) the scanned document for submittal to NRC. In preparation for future amendments, TVA contracted the conversion of the historical copy of A91 to Adobe Software "Framemaker," which is the latest industry tool used for FSAR maintenance and submittal. It was not known until after a number of amendments were submitted that a number of electronic-type problems were created during this conversion effort.

FSAR A92 submitted on December 18, 2008, incorporated a number of changes involving required common systems having been completed for Unit 1 operation. WVA's Redline letter dated February 8, 2008, identified the significant FSAR changes to common systems that had been incorporated into the Unit 1 Updated FSAR that were used in the development of A92.

Subsequent amendments included FSAR A93 (submitted April 30, 2009), A94 (August 27, 2009),

A95 (November 24, 2009), A96 (December 14, 2009), and A97 (January 11, 2010) resulted from TVA's FSAR confirmation effort which focused on addressing specific FSAR sections based upon the system design completion schedules.

Description of Re-Review A number of NRC identified questions/requests were identified to TVA concerning the Unit 2 FSAR amendments submitted to date, some of which were editorial/administrative in nature.

Based upon this feedback, TVA determined that a re-review of the FSAR sections was warranted.

The initial phase of the re-review was to perform a "page turn" focused on finding formatting, typographical, editorial, and administrative-type errors. The second phase of the re-review was initiated to ensure that revision bars existed where needed and were consistent with amendment number indicated at the top of each page. The third phase provided an independent review to ensure that the FSAR change packages received from TVA's engineering staff were incorporated accurately. contains the substantive changes identified during this re-review effort. The remaining administrative/typographical identified items were captured in a common database. A detailed list of these will be made available for NRC use.

ENCLOSURE3 WBN Unit 2 FSAR A98 "Summary of Redacted Pages" Chapter Page(S)

Section No.

Figure No.

Basis For Redaction 1

1.2-15 1.2 1.2-1 Security Related, 10CFR2.390(d)(1) 1 1.2-16 1.2 1.2-2 Security Related, 10CFR2.390(d)(1) 1 1.2-17 1.2 1.2-3 Security Related, 10CFR2.390(d)(1) 1 1.2-18 1.2 1.2-4 Security Related, 10CFR2.390(d)(1) 1 1.2-19 1.2 1.2-5 Security Related, 10CFR2.390(d)(1) 1 1.2-20 1.2 1.2-6 Security Related, 10CFR2.390(d)(1) 1 1.2-21 1.2 1.2-7 Security Related, 10CFR2.390(d)(1) 1 1.2-22 1.2 1.2-8 Security Related, 10CFR2.390(d)(1) 1 1.2-23 1.2 1.2-9 Security Related, 10CFR2.390(d)(1) 1 1.2-24 1.2 1.2-10 Security Related, 10CFR2.390(d)(1) 1 1.2-25 1.2 1.2-11 Security Related, 10CFR2.390(d)(1) 1 1.2-26 1.2 1.2-12 Security Related, 10CFR2.390(d)(1) 1 1.2-27 1.2 1.2-13 Security Related, 10CFR2.390(d)(1) 1 1.2-28 1.2 1.2-14 Security Related, 10CFR2.390(d)(1) 1 1.2-29 1.2 1.2-15 Security Related, 10CFR2.390(d)(1) 2 2.2-7 2.2 2.2-1 Security Related, 10CFR2.390(d)(1) 2 2.2-8 2.2 2.2-2 Security Related, 10CFR2.390(d)(1) 2 2.4-89 2.4 2.4-2 Security Related, 10CFR2.390(d)(1) 2 2.4-159 2.4 2.4-24 Security Related, 10CFR2.390(d)(1) 2 2.4-162 2.4 2.4-27 Security Related, 10CFR2.390(d)(1) 2 2.4-163 2.4 2.4-28 Security Related, 10CFR2.390(d)(1) 2 2.4-168 2.4 2.4-40a Security Related, 10CFR2.390(d)(1)

Sheet 1 2.4-40a 2

2.4-1 69 2.4 Sheet 2 Security Related, 10CFR2.390(d)(1) 2 2.4-171 2.4 2.4-40b Security Related, 10CFR2.390(d)(1) 2 2.4-1 72 2.4 2.4-40c Security Related, 10CFR2.390(d)(1) 2 2.4-1 73 2.4 2heet01 Security Related, 10OCFR2. 390(d)(1) 2 2.4-178 2.4

~~~Sheet 1 Scrt eae,1CR.9()1 2

2.4-178 2.4 2.4-40a Security Related, 1 OCFR2.390(d)(1)

Sheet 1 2

2.4-181 2.4 2.4-40b Security Related, 10CFR2.390(d)(1) 2 2.4-720 2.4 2.4-4S Security Related, 10CFR2.390(d)(1) 2 2.4-210 2.4 2.4-76 Security Related, 10CFR2.390(d)(1) 2 2.4-209 2.4 2.4-79 Security Related, 10CFR2.390(d)(1) 2 2.4-218 2.4 2.4-82 Security Related, 10CFR2.390(d)(1) 2 2.4-213 2.4 2.4-83 Security Related, 10CFR2.390(d)(1) 2 2.4-210 2.4 2.4-88 Security Related, 10CFR2.390(d)(1) 2 2.4-219 2.4 2.4-89 Security Related, 10CFR2.390(d)(1) 2 2.4-212 2.4 2.4-98 Security Related, 10CFR2.390(d)(1) 2 2.5-413 2.5 2.5-185 Security Related, 10CFR2.390(d)(1) 2 2.5-247 2.5 2.5-282 Security Related, 10CFR2.390(d)(1) 2 2.5-513 2.5 2.5-225 Security Related, 10CFR2.390(d)(1) 2 2.5-514 2.5 2.5-226 Security Related, 10CFR2.390(d)(1) 2 2.5-715 2.5 2.5-256 Security Related, 10CFR2.390(d)(1) 2 2.5-575 2.5 2.5-273 Security Related, 100FR2.390(d)(1) 2 2.5-690 2.5 2.5-358 Security Related, 10CFR2.390(d)(1)

ENCLOSURE3 WBN Unit 2 FSAR A98 "Summary of Redacted Pages" Chapter j Page(S) [_Section No.

Figure No.

Basis For Redaction 2

2.5-934 2.5 2.5-592 Security Related, 10CFR2.390(d)(1) 3 3.5-53 3.5 3.5-3 Security Related, 10CFR2.390(d)(1) 3 3.5-54 3.5 3.5-4 Security Related, 10CFR2.390(d)(1) 3 3.6-73 3.6 3.6-21 Security Related, 10CFR2.390(d)(1) 3 3.6-74 3.6 3.6-22 Security Related, 10CFR2.390(d)(1) 3 3.6-75 3.6 3.6-23 Security Related, 10CFR2.390(d)(1) 3 3.6-76 3.6 3.6-24 Security Related, 10CFR2.390(d)(1) 3 3.7-217 3.7 3.7-39 Security Related, 10CFR2.390(d)(1) 3 3.7-218 3.7 3.7-40 Security Related, 10CFR2.390(d)(1) 3 3.7-219 3.7 3.7-41 Security Related, 10CFR2.390(d)(1) 3 3.7-222 3.7 3.7-44 Security Related, 10CFR2.390(d)(1) 3 3.8.3-60 3.8.3 3.8.3-6 Security Related, 10CFR2.390(d)(1)

-3 3.8.3-61 3.8.3 3.8.3-7 Security Related, 10CFR2.390(d)(1) 3 3.8.4-94 3.8.4 3.8.4-2 Security Related, 10CFR2.390(d)(1) 3 3.8.4-95 3.8.4 3.8.4-3 Security Related, 10CFR2.390(d)(1) 3 3.8.4-96 3.8.4 3.8.4-4 Security Related, 10CFR2.390(d)(1) 3 3.8.4-97 3.8.4 3.8.4-5 Security Related, 10CFR2.390(d)(1) 3 3.8.4-98 3.8.4 3.8.4-6 Security Related, 10CFR2.390(d)(1) 3 3.8.4-101 3.8.4 3.8.4-9 Security Related, 10CFR2.390(d)(1) 3 3.8.4-109 3.8.4 3.8.4-17 Security Related, 10CFR2.390(d)(1) 3 3.8.4-110 3.8.4 3.8.4-18 Security Related, 10CFR2.390(d)(1) 3 3.8.4-111 3.8.4 3.8.4-19 Security Related, 10CFR2.390(d)(1) 3 3.8.4-112 3.8.4 3.8.4-20 Security Related, 10CFR2.390(d)(1) 3 3.8.4-116 3.8.4 3.8.4-24 Security Related, 10CFR2.390(d)(1) 3 3.8.4-120 3.8.4 3.8.4-28 Security Related, 10CFR2.390(d)(1) 3 3.8.4-127 3.8.4 3.8.4-35 Security Related, 10CFR2.390(d)(1) 3 3.8.4-128 3.8.4 3.8.4-36 Security Related, 10CFR2.390(d)(1) 3 3.8.4-129 3.8.4 3.8.4-36a Security Related, 10CFR2.390(d)(1) 3 3.8.4-132 3.8.4 3.8.4-37 Security Related, 10CFR2.390(d)(1) 3 3.8.4-149 3.8.4 3.8.4-50 Security Related, 10CFR2.390(d)(1) 3 3.8.4-150 3.8.4 3.8.4-51 Security Related, 10CFR2.390(d)(1) 3 3.8.6-19 3.8.6 3.8.6-7 Security Related, 10CFR2.390(d)(1) 6 6.2.2-24 6.2.2 6.2.2-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-78 6.2.3 6.2.3-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-79 6.2.3 6.2.3-5 Security Related, 10CFR2.390(d)(1) 6 6.2.3-80 6.2.3 6.2.3-6 Security Related, 10CFR2.390(d)(1) 6 6.2.3-81 6.2.3 6.2.3-7 Security Related, 10CFR2.390(d)(1) 6 6.2.3-82 6.2.3 6.2.3-8 Security Related, 10CFR2.390(d)(1) 6 6.2.3-83 6.2.3 6.2.3-9 Security Related, 10CFR2.390(d)(1) 6 6.2.3-84 6.2.3 6.2.3-10 Security Related, 10CFR2.390(d)(1) 6 6.2.3-94 6.2.3 6.2.3-18 Security Related, 10CFR2.390(d)(1) 6 6.2.3-95 6.2.3 6.2.3-19 Security Related, 10CFR2.390(d)(1) 8 8.1-21 8.1 8.1-1 Security Related, 10CFR2.390(d)(1) 8 8.2-14 8.2 Security Related, 10CFR2.390(d)(1) 8 8.2-15 8.2 Security Related, 10CFR2.390(d)(1) 8 8.2-30 8.2 8.2-3 Security Related, 10CFR2.390(d)(1) 8 8.2-31 8.2 8.2-4 Security Related, 10CFR2.390(d)(1)

ENCLOSURE3 WBN Unit 2 FSAR A98 "Summary of Redacted Pages" Chapter Page(S)

Section No.

Figure No.

Basis For Redaction 8

8.2-44 8.2 8.2-11 Security Related, 10CFR2.390(d)(1) 8 8.3-97 8.3 8.3-1 Security Related, 10CFR2.390(d)(1) 8 8.3-99 8.3 8.3-2 Security Related, 10CFR2.390(d)(1) 8 8.3-100 8.3 8.3-3 Security Related, 10CFR2.390(d)(1) 8 8.3-102 8.3 8.3-4b Security Related, 10CFR2.390(d)(1) 8 8.3-205 8.3 8.3-46 Security Related, 10CFR2.390(d)(1) 8 8.3-218 8.3 8.3-59 Security Related, 10CFR2.390(d)(1) 9 9.2-208 9.2 9.2-40 Security Related, 10CFR2.390(d)(1) 9 9.4-276 9.4 9.4-21 Security Related, 10CFR2.390(d)(1) 9 9.4-280 9.4 9.4-22c Security Related, 10CFR2.390(d)(1) 9 9.4-281 9.4 9.4-23 Security Related, 10CFR2.390(d)(1) 9 9.4-282 9.4 9.4-24 Security Related, 10CFR2.390(d)(1) 12 12.3-39 12.3 12.3-1 Security Related, 10CFR2.390(d)(1) 12 12.3-40 12.3 12.3-2 Security Related, 10CFR2.390(d)(1) 12 12.3-41 12.3 12.3-3 Security Related, 10CFR2.390(d)(1) 12 12.3-42 12.3 12.3-4 Security Related, 10CFR2.390(d)(1) 12 12.3-43 12.3 12.3-5 Security Related, 10CFR2.390(d)(1) 12 12.3-44 12.3 12.3-6 Security Related, 10CFR2.390(d)(1) 12 12.3-45 12.3 12.3-7 Security Related, 10CFR2.390(d)(1) 12 12.3-46 12.3 12.3-8 Security Related, 10CFR2.390(d)(1) 12 12.3-47 12.3 12.3-9 Security Related, 10CFR2.390(d)(1) 12 12.3-48 12.3 12.3-10 Security Related, 10CFR2.390(d)(1) 12 12.3-49 12.3 12.3-11 Security Related, 10CFR2.390(d)(1) 12 12.3-50 12.3 12.3-12 Security Related, 10CFR2.390(d)(1) 12 12.3-51 12.3 12.3-13 Security Related, 10CFR2.390(d)(1) 12 12.3-52 12.3 12.3-14 Security Related, 10CFR2.390(d)(1) 12 12.3-53 12.3 12.3-15 Security Related, 10CFR2.390(d)(1) 12 12.3-54 12.3 12.3-16 Security Related, 10CFR2.390(d)(1) 12 12.3-55 12.3 12.3-17 Security Related, 10CFR2.390(d)(1) 12 12.4-5 12.4 12.4-1 Security Related, 10CFR2.390(d)(1)

ENCLOSURE 4 Watts Bar Nuclear Plant Unit 2 FSAR Amendment 98 "New Commitment"

1. TVA will submit a revision to Section 2.3, "Meteorology," by May 28, 2010, to address NRC request for information.

ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 98 - List of Files on Security-Related OSM File Name File Size - Bytes TVA_WBN-2_FSAR_Files 001 TVA WB FSAR TOC.pdf 365,608 002_TVAWBFSAR LEP.pdf 2,873,682 003_TVAWBFSARSection_ 1.pdf 4,643,237 004_TVAWBFSAR Section 2 A.pdf 10,004,406 005 TVA WB FSAR Section 2 B 1 of_2.pdf 40,561,631 005 TVA WB FSAR Section 2 B. 2 of 2pdf 12,403,835 006 TVA WB FSAR Section 2 C.pdf 2,136,843 007_TVA WB FSAR Section 2 D.pdf 31,347,169 008 TVA WB FSAR Section 2 E. pdf 47,382,126 009_TVA WBFSARSection_3 A.pdf 2,649,829 010_TVAWBFSAR Section 3 B.pdf 7,100,480 01 ITVAWBFSARSection_3_C.pdf 30,068,314 012_TVAWBFSAR Section 3 D.pdf 6,063,858 013 TVA WB FSAR Section 4.pdf 12,606,045 014 TVA WB FSAR Section_5.pdf 9,285,695 015 TVA WB FSARSection_6 A.pdf 18,822,408 016_TVA WB FSARSection_6_B.pdf 8,042,692 017 TVA WB FSAR Section_7.pdf 9,384,548 018_TVA WB FSAR Section_8.pdf 29,737,348 019 TVA WB FSAR Section_9 A.pdf 24,555,513 020_TVAWBFSAR Section 9 B.pdf 15,331,057 021 TVA WB FSAR Section 10.pdf 14,246,675 022 TVA WB FSARSection_ 11.pdf 4,031,537 023_TVAWBFSARSection-l 2.pdf 5,987,905 024_TVAWBFSAR Section 13.pdf 3,253,533 025_TVA WB FSARSection_14.pdf 1,196,851 Page 1 of 3

ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 98 - List of Files on Security-Related OSM File Name File Size - Bytes 026_TVA WB FSAR Section 15.pdf 35,576,210 027 TVA WB FSAR Section_ 16.pdf 149,467 028_TVAWBFSARSection_1 7. pdf 174,883 Total 389,983,385 TVA_WBN-2_Oversized_FSARFigures 001 TVA WB FSAR Figure 2.5_3.pdf 1,757,743 002_TVAWBFSARFigure 2.5 11.pdf 1,689,538 003_TVAWBFSAR Figure 2.5 71.pdf 2,263,087 004_TVAWBFSAR Figure 2.5 222.pdf 909,429 005_TVAWBFSARFigure 2.5 281_1.pdf 2,155,627 006_TVA WB FSAR Figure 2.5 281 2.pdf 2,117,562 007_TVAWB FSAR Figure 2.5 549_1.pdf 3,600,807 008_TVAWBFSAR Figure 2.5 549 2.pdf 3,989,180 009_TVAWBFSARFigure 2.5 549 3.pdf 2,863,719 010_TVAWBFSARFigure 2.5 549 4.pdf 2,809,599 011_TVAWBFSAR Figure 2.5 550.pdf 1,803,985 012_TVA WB FSAR Figure 2.5 551.pdf 1,996,869 013_TVA WB FSAR Figure 2.5 554 1.pdf 3,081,060 014_TVAWBFSARFigure 2.5 554 2.pdf 1,996,707 015_TVA WB FSARFigure 2.5 555.pdf 1,993,312 016_TVAWB FSAR Figure 2.5 556.pdf 2,998,087 017_TVAWBFSAR Figure 2.5 571 1.pdf 844,484 018_TVA WB FSAR Figure 2.5 571 2.pdf 3,128,329 019_TVA WB FSARFigure 2.5 571 3.pdf 3,284,555 020_TVAWBFSARFigure 2.5 571 4.pdf 2,142,316 021 TVAWBFSAR Figure 2.5 572.pdf 2,196,945 Page 2 of 3

ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 98 - List of Files on Security-Related OSM File Name File Size - Bytes 022_TVAWBFSAR Figure 2.5 573.pdf 2,013,286 023_TVA WB FSARFigure 2.5 576 1.pdf 3,238,525 024 TVA WBFSARFigure 2.5 576 2.pdf 2,151,750 025_TVAWBFSAR Figure 2.5 577.pdf 2,207,622 026 TVA WB FSARFigure 2.5 578.pdf 2,080,032 027_TVAWBFSARFigure 2.5 579.pdf 2,308,985 028_TVAWBFSARFigure 2.5 583.pdf 2,487,346 029_TVAWBFSAR Figure 2.5 588.pdf 2,528,515 030_TVAWB FSAR Figure 2.5 589.pdf 2,480,438 031_TVA WB FSAR Figure 2.5 594.pdf 13,054,127 032_TVAWBFSARFigure 2.5 595.pdf 2,323,267 033_TVA WB FSARFigure 2.5 596.pdf 5,732,107 034 TVA WB FSAR Figure 2.5 597.pdf 1,287,336 035_TVAWBFSAR Figure 2.5 602.pdf 5,549,537 036_TVA WB FSARFigure 2.5 603.pdf 4,830,835 037_TVAWBFSARFigure 2.5 604.pdf 6,392,279 038_TVA WB FSARFigure 2.5 605.pdf 20,823,108 Total 131,112,035 TVA_WBN-2_OversizedFSARTable 001 TVAWBFSARTable_6.2.4-1.pdf 1,202,693 Total 1,202,693 Page 3 of 3

ENCLOSURE 6 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 98 List of Files on Publicly Available OSM File Name File Size - Bytes TVAWBN-2_FSARFiles 001 TVAWBFSARTOC.pdf 365,608 002_TVAWB FSARLEP.pdf 2,873,682 003_TVA WB FSAR Section 1.pdf 847,812 004 TVA WB FSAR Section 2_A.pdf 9,667,889 005 TVA WB FSAR Section 2 B 1 of 2.pdf 31,874,004 005_TVAWBFSARSection 2 B 2 of 2.pdf 9,368,712 006_TVAWBFSARSection_2_C.pdf 2,136,843 007_TVAWBFSARSection_2_D.pdf 31,347,169 008 TVA WB FSAR Section 2_E.pdf 46,002696 009 TVA WB FSAR Section 3_A.pdf 2,358,417 010_TVA WB FSAR Section 3_B.pdf 5,698,742 011 TVA WB FSAR Section 3_C.pdf 25,235,897 012_TVAWBFSARSection 3_D.pdf 5,795,155 013_TVAWBFSARSection_4.pdf 12,606,045 014 TVA WB FSAR Section 5.pdf 9,285,695 015_TVAWBFSARSection 6_A.pdf 15,941,929 016 TVAWBFSARSection_6_B.pdf 8,042,692 017_TVA WB FSAR Section 7.pdf 9,384,548 018 TVA WB FSAR Section 8.pdf 26,777,422 019_TVA WB FSAR Section 9_A.pdf 24,294,427 020_TVAWBFSAR Section 9_B.pdf 14,169,016 021_TVAWB FSAR Section_10.pdf 14,246,675 022_TVA WBFSAR Section 1.pdf 4,031,537 023_TVAWBFSARSection_12.pdf 1,719,952 024_TVA WB FSAR Section_ 13.pdf 3,264,994 025 TVA WB FSAR Section 14.pdf 1,196,851 026_TVA WB FSAR Section 15.pdf 35,576,210 Note: Byte amounts in italics are redacted files.

Page 1 of 3

ENCLOSURE 6 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 98 List of Files on Publicly Available OSM File Name File Size - Bytes 027_TVA WB FSARSection_16.pdf 149,467 028 TVA WB FSAR Section 17.pdf 174,883 Total 354,434,969 TVAWBN-2_OversizedFSARFigures 001 TVAWBFSAR Figure 2.5 3.pdf 1,757,743 002_TVAWBFSARFigure 2.51 1.pdf 1,689,538 003_TVAWBFSAR Figure 2.5 71.pdf 2,263,087 004 TVA WB FSARFigure 2.5 222.pdf 909,429 005_TVAWBFSARFigure 2.5 2811.pdf 2,155,627 006_TVAWBFSAR Figure 2.5 281 2.pdf 2,117,562 007_TVAWB-FSARFigure 2.5_5491.pdf 3,600,807 008_TVAWBFSAR Figure 2.5 549 2.pdf 3,989,180 009_TVAWBFSARFigure 2.5 549 3.pdf 2,863,719 010_TVA WB FSAR Figure 2.5 549 4.pdf 2,809,599 011_TVA WB FSAR Figure 2.5 550.pdf 1,803,985 012_TVAWBFSAR Figure 2.5 551.pdf 1,996,869 013_TVAWB FSARFigure 2.5 5541.pdf 3,081,060 014 TVA WB FSAR Figure 2.5 554 2.pdf 1,996,707 015_TVAWBFSAR Figure 2.5 555.pdf 1,993,312 016_TVAWBFSAR Figure 2.5 556.pdf 2,998,087 017_TVAWBFSARFigure 2.5 571_1.pdf 844,484 018_TVA WBFSAR Figure 2.5 571 2.pdf 3,128,329 019_TVAWBFSAR Figure 2.5 571 3.pdf 3,284,555 020_TVAWBFSAR Figure 2.5 571 4.pdf 2,142,316 021_TVAWBFSAR Figure 2.5 572.pdf 2,196,945 022_TVAWBFSARFigure 2.5 573.pdf 2,013,286 023 TVAWBFSARFigure 2.5 576 l.pdf 3,238,525 Note: Byte amounts in italics are redacted files.

Page 2 of 3

ENCLOSURE 6 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 98 List of Files on Publicly Available OSM File Name File Size - Bytes 024_TVA WB FSAR Figure 2.5 576 2.pdf 2,151,750 025_TVA WB FSAR Figure 2.5 577.pdf 2,207,622 026_TVA WB FSAR Figure 2.5 578.pdf 2,080,032 027_TVA WB FSAR Figure 2.5 579.pdf 2,308,985 028_TVA WB FSAR Figure 2.5 583.pdf 2,487,346 029_TVA WB FSAR Figure 2.5 588.pdf 2,528,515 030_TVA WB FSAR Figure 2.5 589.pdf 2,480,438 031_TVA WBFSAR Figure 2.5 594.pdf 13,054,127 032 TVA WB FSAR Figure 2.5 595.pdf 2,323,267 033_TVAWBFSARFigure 2.5 596.pdf 5,732,107 034_TVAWBFSARFigure 2.5 597.pdf 1,287,336 035_TVA WB FSAR Figure 2.5 602.pdf 5,549,537 036_TVAWBFSAR Figure 2.5 603.pdf 4,830,835 037_TVAWBFSAR Figure 2.5 604.pdf 6,392,279 038_TVAWBFSAR Figure 2.5 605.pdf 20,823,108 Total 131,112,035 TVA_WBN-2_OversizedFSARTable 001 TVA WB FSAR Table 6.2.4-1.pdf 1,202,693 Total 1,202,693 Note: Byte amounts in italics are redacted files.

Page 3 of 3