Acceptance Review: MPS2 Relief Request RR-04-03
ML101340166
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/14/2010
From: Sanders C
Plant Licensing Branch IV
To: Bartron W, Craft W
Dominion Nuclear Connecticut
Sanders, C J, NRR/DORL/LPL1-2, 415-1603
References
FOIA/PA-2011-0115
Download: ML101340166 (1)


Text

From: Sanders, Carleen Sent: Friday, May 14, 2010 8:23 AM To: william.d.bartron@dom.com; wanda.d.craft@dom.com

Subject:

Acceptance Review: MPS2 Relief Request RR-04-03

Dear Mr. Bartron:

By letter dated March 30, 2010, Dominion Nuclear Connecticut, Inc. (DNC) submitted relief request RR-04-03 for Millstone Power Station, Unit No. 2 (MPS2). The proposed relief request would allow the use of Code Case N-513-2, "Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1,"

for the fourth 10-year inservice inspection interval at MPS2. The fourth inservice inspection interval began April 1, 2010, and is scheduled to end March 31, 2020. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.

The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415?1603.

Sincerely, Carleen Sanders, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing

Office of Nuclear Reactor Regulation Docket No. 50-336 E-mail Properties Mail Envelope Properties (36CF286628C20846A68047F2463233091EF1D75C44)

Subject:

Acceptance Review: MPS2 Relief Request RR-04-03 Sent Date: 5/14/2010 8:23:00 AM Received Date: 5/14/2010 8:23:00 AM From: Sanders, Carleen Created By: Carleen.Sanders@nrc.gov Recipients:

william.d.bartron@dom.com (william.d.bartron@dom.com)

Tracking Status: None wanda.d.craft@dom.com (wanda.d.craft@dom.com)

Tracking Status: None Keith.Hoffman@nrc.gov (Hoffman, Keith)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 8922 5/14/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: