IR 05000498-10-007 and 05000499-10-007 on 07/26/2010, Diablo Canyon - Initial Information Request for NRC Triennial Baseline Component Design
ML101320723
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/12/2010
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Halpin E
South Texas
References
IR-10-007
Download: ML101320723 (9)


See also: IR 05000498/2010007

Text

May 12, 2010

Mr. Edward D. Halpin

Executive Vice President and Chief Nuclear Officer

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - INITIAL

INFORMATION REQUEST FOR NRC TRIENNIAL BASELINE COMPONENT

DESIGN BASES INSPECTION NRC INSPECTION REPORT

05000498/2010007 AND 05000499/2010007 ML101320723

Dear Mr. Conway

On July 26, 2010, the NRC will begin a triennial baseline Component Design Bases Inspection

at the STP Nuclear Operating Company. A six-person team will perform this inspection using

NRC Inspection Procedure 71111.21, "Component Design Bases Inspection."

The inspection focuses on components and operator actions that have high risk and low design

margins. The samples reviewed during this inspection will be identified during an information

gathering visit and during the subsequent in-office preparation week. In addition, a number of

operating experience issues will also be selected for review.

The inspection will include an information gathering site visit by the team leader and a senior

reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of

four NRC inspectors and two contractors, of which three inspectors will focus on engineering

and one inspector on operations. The current inspection schedule is as follows:

Onsite information gathering visit: Week of June 28, 2010

Preparation Week: July 19-23, 2010

Onsite weeks: July 26-30, 2010 and August 9-20, 2010

The purpose of the information gathering visit is to meet with members of your staff to identify

potential risk-significant components and operator actions. The lead inspector will also request

a tour of the plant with members of your operations staff and probabilistic safety assessment

staff. During the onsite weeks, several days of time will be needed on the plant-referenced

simulator in order to facilitate the development of operator action-based scenarios. Additional

information and documentation needed to support the inspection will be identified during the

inspection, including interviews with engineering managers, engineers, and probabilistic safety

assessment staff.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

612 E. LAMAR BLVD., SUITE 400

ARLINGTON, TEXAS 76011-4005

STP Nuclear Operating Company

- 2 -

Our experience with these inspections has shown that they are extremely resource intensive,

both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact

on the site and to ensure a productive inspection, we have enclosed a request for information

needed for the inspection. The request has been divided into three groups. The first group lists

information necessary for the information gathering visit and for general preparation. This

information should be available to the regional office no later than June 22, 2010. Insofar as

possible, this information should be provided electronically to the lead inspector. Since the

inspection will be concentrated on high risk/low margin components, calculations associated

with your list of high risk components should be available for review during the information

gathering visit to assist in our selection of components based on available design margin.

The second group of documents requested are those items that the team will need access to

during the preparation week in order to finalize the samples to be inspected. The third group

lists information necessary to aid the inspection team in tracking issues identified as a result of

the inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. Additional requests by inspectors will be made

throughout all three onsite weeks for specific documents needed to complete the review of that

component/selection. It is important that all of these documents are up to date and complete in

order to minimize the number of additional documents requested during the preparation and/or

the onsite portions of the inspection. In order to facilitate the inspection, we request that a

contact individual be assigned to each inspector to ensure information requests, questions, and

concerns are addressed in a timely manner.

The lead inspector for this inspection is Mr. Ronald A. Kopriva. We understand that our

licensing engineer contact for this inspection is Mr. Jamie Paul. If there are any questions about

the inspection or the requested materials, please contact the lead inspector at (817) 860-8104

or via e-mail at ron.kopriva@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Thomas Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-498; 50-499

Licenses: NPF-76; NPF-80

Enclosure:

Component Design Basis Inspection

Document Request

STP Nuclear Operating Company

- 3 -

cc w/enclosure:

Kevin Richards, Senior Vice President and

Assistant to CEO

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

David W. Rencurrel, Senior Site Executive

Senior Vice President Units 1 and 2

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

Louis Peter, Plant General Manager

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

Tim Powell, Vice President, Engineering

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

A. W. Harrison, Manager, Licensing

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

Charles T. Bowman, General Manager, Oversight

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

Marilyn Kistler

Senior Staff Specialist, Licensing

STP Nuclear Operating Company

South Texas Project

P.O. Box 289

Wadsworth, TX 77483

STP Nuclear Operating Company

- 4 -

Cheryl Mele

City of Austin

Electric Utility Department

721 Barton Springs Road

Austin, TX 78704

J. J. Nesrsta/R. K. Temple/

Ed Alercon/Kevin Pollo

City Public Service

P.O. Box 1771

San Antonio, TX 78296

Jon C. Wood

Cox, Smith, & Matthews

112 East Pecan, Suite 1800

San Antonio, TX 78205

A. H. Gutterman, Esq.

Morgan, Lewis & Bockius LLP

1111 Pennsylvania Avenue, NW

Washington, DC 20004

Richard A. Ratliff, P.E., L.M.P.

Radiation Safety Licensing Branch Manager

Division for Regulatory Services

Texas Department of State Health

Mail Code 2385

P.O. Box 14947

Austin, TX 78714-9347

Brian Almon

Public Utility Commission of Texas

P.O. Box 13326

Austin, TX 78711-3326

Environmental and Natural Resources

Policy Director, Office of the Governor

P.O. Box 12428

Austin, TX 78711-3189

Nate McDonald

Judge, Matagorda County

Matagorda County Courthouse

1700 Seventh Street

Bay City, TX 77414

STP Nuclear Operating Company

- 5 -

Anthony P. Jones, Chief Boiler Inspector

Texas Department of Licensing and Regulation

Boiler Division

E.O. Thompson State Office Building

P.O. Box 12157

Austin, TX 78711

Susan M. Jablonski

Office of Permitting, Remediation and Registration

Texas Commission on Environmental Quality

MC-122

P.O. Box 13087

Austin, TX 78711-3087

Ted Enos

4200 South Hulen, Suite 422

Fort Worth, TX 76109

Kevin Howell/Catherine Callaway/Jim von Suskil

NRG Energy, Inc.

1301 McKinney, Suite 2300

Houston, TX 77010

Chief, Technological Hazards

Branch

FEMA Region VI

800 North Loop 288

Federal Regional Center

Denton, TX 76209

STP Nuclear Operating Company

- 6 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (John.Dixon@nrc.gov)

Resident Inspector (Binesh.Tharakan@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)

D. Norkin, NRR CDBI Coordinator (Donald.Norkin@nrc.gov)

SUNSI Review Completed: _X__Yes ____ ADAMS: Yes No Initials: _TRF__

Publicly Available Non-Publicly Available

Sensitive Non-Sensitive

R:\\REACTORS\\STP2010007 CDBI RFI - RAK

ML 101320723

RIV:SRI:DRS/EB1

BC/EB1

RAKopriva

TFarnholtz

/RA/

/RA/

5/12/10

5/12/10

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax

- 1 -

Enclosure

INFORMATION REQUEST FOR STP NUCLEAR OPERATING COMPANY POWER PLANT

COMPONENT DESIGN BASES (CDBI) INSPECTION

Inspection Report: 05000498/2010007

05000499/2010007

Information Gathering Dates:

June 28-July 1, 2010

On-site Inspection Dates:

July 26-30, 2010

August 9 - 20, 2010

Inspection Procedure:

IP 71111.21, "Component Design Bases Inspection"

Lead Inspector/Team Leader:

Ronald A. Kopriva

817-860-8104

Ron.kopriva@nrc.gov

I.

Information Requested Prior to the information Gathering Visit (June 22, 2010)

The following information (Section I of this enclosure) should be sent to the Region IV

office in hard copy or electronic format (ims.certrec.com and compact disc, preferred), in

care of Ronald A. Kopriva, by June 22, 2010 to facilitate the reduction in the items to be

selected for a final list during the preparation week of July 19-23, 2010. The inspection

team will finalize the selected list during the prep week using the additional documents

requested in Section II of this enclosure. The specific items selected from the lists shall

be available and ready for review on the day indicated in this request. *Please provide

requested documentation electronically in "pdf" files, Excel, or other searchable formats,

if possible. The information should contain descriptive names, and be indexed and

hyperlinked to facilitate ease of use. Information in "lists" should contain enough

information to be easily understood by someone who has knowledge of pressurized

water reactor technology. If requested documents are large and only hard copy formats

are available, please inform the inspector(s), and provide subject documentation during

the first day of the onsite inspection.

1.

An excel spreadsheet of equipment basic events (with definitions) including

importance measures sorted by risk achievement worth (RAW) and Fussell-

Vesely (FV) from your internal events probabilistic risk assessment (PRA).

Include basic events with RAW value of 1.3 or greater.

2.

Provide a list of the top 500 cut-sets from your PRA.

3.

Copies of PRA "system notebooks," and the latest PRA summary document.

- 2 -

Enclosure

4.

An excel spreadsheet of PRA human action basic events or risk ranking of

operator actions from your site specific PSA sorted by RAW and FV. Provide

copies of your human reliability worksheets for these items.

5.

If you have an external events or fire PSA model, provide the information

requested in items 1-4 for external events and fire.

6.

Any pre-existing evaluation or list of components and associated calculations

with low design margins, (i.e., pumps closest to the design limit for flow or

pressure, diesel generator close to design required output, heat exchangers

close to rated design heat removal, etc.).

7.

List of high risk maintenance rule systems/components and functions; based on

engineering or expert panel judgment.

8.

A list of operating experience evaluations for the last 2 years.

9.

A list of all time-critical operator actions in procedures.

10.

A list of permanent and temporary modifications sorted by component identified

in Item 1.

11.

List of current "operator work arounds/burdens."

12.

A list of the design calculations, which provide the design margin information for

components included in Item 1. (Calculations should be available during the

information gathering visit).

13.

List of root cause evaluations associated with component failures or design

issues initiated/completed in the last 5 years.

14.

Current management and engineering organizational charts.

15.

South Texas Electric Generating Station IPEEE, if available electronically.

16.

Mechanical piping drawings for:

Engineered safety features

Emergency core cooling systems

Emergency diesel generators

17

Electrical one-line drawings for:

Offsite power/switchyard supplies

Normal AC power systems

Emergency AC/DC power systems including

120VAC power, and

125VDC/24VDC safety class systems

- 3 -

Enclosure

18.

List of any common-cause failures of components in the last 3 years.

19.

An electronic copy of the Design Bases Documents.

20.

An electronic copy of the System Health notebooks.

II.

Information Requested to be Available on First Day of Preparation Week (July 19,

2010)

1.

List of condition reports (corrective action documents) associated with each of

the selected components for the last 5 years.

2.

The corrective maintenance history associated with each of the selected

components for the last 2 years.

3.

Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and

also provide copies of reference material (such as drawings, engineering

requests, and vendor letters).

4.

Copies of operability evaluations associated with each of the selected

components and plans for restoring operability, if applicable.

5.

Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

6.

Copies of any open temporary modifications associated with each of the selected

components, if applicable.

7.

Trend data on the selected electrical/mechanical components performance for

last 3 years (for example, pumps performance including in-service testing, other

vibration monitoring, oil sample results, etc., as applicable).

8.

A copy of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

9.

A copy of engineering/operations related audits completed in the last 2 years.

10.

List of motor operated valves (MOVs) in the program, design margin and risk

ranking.

11.

List of air operated valves (AOVs) in the valve program, design and risk ranking.

12.

Structure, system and components in the Maintenance Rule (a)(1) category.

13.

Site top 10 issues list.

- 4 -

Enclosure

14.

Procedures used to accomplish operator actions associated with the basic

events in your PRA.

15.

List of licensee contacts for the inspection team with pager or phone numbers.

III.

Information Requested to be provided throughout the inspection.

1.

Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2.

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

3.

Reference materials (available electronically and as needed during all onsite

weeks):

General set of plant drawings

IPE/PRA report

Procurement documents for components selected

Plant procedures (normal, abnormal, emergency, surveillance, etc.)

Technical Specifications

Updated Final Safety Analysis Report

Vendor manuals

Inspector Contact Information:

Ronald A. Kopriva - Team Lead

Senior Reactor Inspector

(817) 860-8104

Ron.kopriva@nrc.gov

Mailing Address:

US NRC, Region IV

Attn: Ronald A. Kopriva

612 East Lamar Blvd, Ste 400

Arlington, TX 76011