ML101270272

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation - Request for Information on Unattended Pathways
ML101270272
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/30/2010
From: St.Onge R
Southern California Edison Co
To: Collins E
Region 4 Administrator
References
Download: ML101270272 (2)


Text

SI*

, I

  • SOUTHERN CALIFORNIA ED ISO N An EDISON INTERNATIONAAL Company SAFEGUARDS INFORMATION Richard J. St. Onge Director Nuclear Regulatory Affairs 10 CFR 73.55 April 30, 2010 Elmo E. Collins, Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 East Lamar Blvd., Suite 400 Arlington, TX 76011-4125

Subject:

Docket Nos. 50-361, 50-362 and 72-41 Request for Information on Unattended Pathways San Onofre Nuclear Generating Station, Units 2 and 3, and Independent Spent Fuel Storage Installation E-mail from NRC Region IV (James Larsen) to SCE (John R. Todd) dated April 6, 2010, subject: Penetrations

Reference:

Dear Mr. Collins:

Southern California Edison (SCE) is pleased to provide the requested information on unattended pathways at San Onofre Nuclear Generating Station (SONGS) requested by the Reference e-mail.

There are no regulatory commitments made by this letter or its enclosures.

Note that Enclosures 1 and 2 to this letter contain Safeguards Information (SGI) and Security Related Information (SRI), respectively. This letter may be decontrolled upon separation from its enclosures.

If you have any questions regarding this matter, please contact Mr. S. D. Root, Project Manager, at 949-368-6480.

Sincerely, SAFEGUARDS INFORMATION P.O. Box 128 Decontrolled when separated from the Enclosures San Clemente, CA 92674 sc~5o(

SAFEGUARDS INFORMATION An EDISON INTERNATIONAL'~ Company April 30, 2010 Elmo E. Collins, Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 East Lamar Blvd., Suite 400 Arlington, TX 76011-4125

Subject:

Docket Nos. 50-361, 50-362 and 72-41 Request for Information on Unattended Pathways Richard J. St. Onge Director Nuclear Regulatory Affairs.

10 CFR 73.55 San Onofre Nuclear Generating Station, Units 2 and 3, and Independent Spent Fuel Storage Installation

Reference:

E-mail from NRC Region IV (James Larsen) to SCE (John R. Todd) dated April 6, 2010, subject: Penetrations

Dear Mr. Collins:

Southern California Edison (SCE) is pleased to provide the requested information on unattended pathways at San Onofre Nuclear Generating Station (SONGS) requested by the Reference e-mail.

There are no regulatory commitments made by this letter or its enclosures.

Note that Enclosures 1 and 2 to this letter contain Safeguards Information (SGI) and Security Related Information (SRI), respectively. This letter may be decontrolled upon separation from its enclosures.

If you have any questions regarding this matter, please contact Mr. S. D. Root, Project Manager, at 949-368-6480.

Sincerely, Cb.

SAFEGUARDS INFORMATION P.o. Box 128 Decontrolled when separated from the Enclosures San Clemente, CA 92674

SAFEGUARDS INFORMATION E. E. Collins, Regional Administrator U.S. Nuclear Regulatory Commission April 30, 2010

Enclosures:

(1) Response to Information Request on Unattended Pathways (SGI portion)

(2) Response to Information Request on Unattended Pathways (SRI portion) cc:

NRC Document Control Desk Michael P. Shannon, Chief, Plant Support Branch 1, NRC, Region IV G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3 SAFEGUARDS INFORMATION Decontrolled when separated from the Enclosures SAFEGUARDS INFORMATION E. E. Collins, Regional Administrator U.S. Nuclear Regulatory Commission

Enclosures:

April 30, 2010 (1) Response to Information Request on Unattended Pathways (SGI portion)

(2) Response to Information Request on Unattended Pathways (SRI portion) cc:

NRC Document Control Desk Michael P. Shannon, Chief, Plant Support Branch 1, NRC, Region IV G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3 SAFEGUARDS INFORMATION Decontrolled when separated from the Enclosures