P.O. Box 63 CENG a joint venture of Lycoming, NY 13093 O Constellation ODF

%0Energy NINE MILE POINT NUCLEAR STATION April 23, 2010 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk

SUBJECT:

Nine Mile Point Nuclear Station Unit No. 2; Docket No. 50-410 Core Operating Limits Report Enclosed is a copy of the Core Operating Limits Report, COLR2-13, Revision 0, for Nine Mile Point Unit 2 (NMP2). This report is being submitted pursuant to NMP2 Technical Specification 5.6.5.d.

Should you have any questions regarding the information in this submittal, please contact T. F. Syrell, Licensing Director, at (315) 349-5219.

V truly yours, oseph E. Pacher anager, Engineering Services JEP/MHS

Enclosure:

Nine Mile Point Unit 2 Core Operating Limits Report, COLR2-13, Revision 0 cc: NRC Regional Administrator, Region I NRC Project Manager NRC Senior Resident Inspector 140o(

ENCLOSURE Nine Mile Point Unit 2 Core Operating Limits Report COLR2-13, Revision 0 Nine Mile Point Nuclear Station, LLC April 23, 2010

NINE MILE POINT UNIT 2 CORE OPERATING LIMITS REPORT Document No.: COLR2-13 Revision 0, Cycle 13 Name Title Date Prepared by: 7

////f)

M. Krick Fuel Engineer Lepine)

Reviewed by:

d*/Lepine Fuel Engineer Independently Reviewed !e4(t by:

Carter/ Fuel Engineer Approved by:

R. Close Supervisor, Nuclear Fuels Services Approved by:

John Darweesh Supervisor, ZL/,J1 Reactor Engineering Approved by:

P; Wengloski General Supervisor, Nuclear Fuels Services This Controlled Document provides cycle specific core operating limits for use in conjunction with the Nine Mile Point Unit 2 Technical Specifications. Document pages may only be changed through a reissue of the entire document.

COLR2-13 NINE MILE POINT UNIT 2 Revision 0, Cycle 13 CORE OPERATING LIMITS REPORT Table of Contents rage 1.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) I 1.1 Limits for Technical Specification 3.2.1 1 2.0 MINIMUM CRITICAL POWER RATIO (ODYN OPTION B) 3 2.1 Limits for Technical Specification 3.2.2 3 3.0 LINEAR HEAT GENERATION RATE (LHGR) 10 3.1 Limits for Technical Specifications 3.2.3 10 4.0 AVERAGE POWER RANGE MONITOR SETPOINTS 15 4.1 Limits for Technical Specification Table 3.3.1.1-1 (OPRM Upscale) 15 5.0 CONTROL ROD BLOCK INSTRUMENTATION 16 5.1 Allowable Value for Technical Specification Table 3.3.2.1-1 16

6.0 REFERENCES

FOR TECHNICAL SPECIFICATIONS 17

7.0 REFERENCES

FOR TECHNICAL SPECIFICATION BASES 18 8.0 SOURCE DOCUMENTS 19 Page i

COLR2-13 NINE MILE POINT UNIT 2 Revision 0, Cycle 13 CORE OPERATING LIMITS REPORT 1.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 1.1 Limits for Technical Specification 3.2.1 The APLHGR(s) for each fuel type as a function of AVERAGE PLANAR EXPOSURE shall not exceed the limits shown in Table 1.

The limits of Table 1 shall be reduced to a value of 0.78 times the two recirculation loop operation limit when in single recirculation loop operation.

Page I of 19

COLR2-13 NINE MILE POINT UNIT 2 Revision 0, Cycle 13 CORE OPERATING LIMITS REPORT TABLE 1 MAPLHGR Versus Average Planar Exposure Average Planar Exposure MAPLHGR Limits (GWd/ST) (kw/ft) 0.00 12.82 14.51 12.82 19.13 12.82 57.61 8.00 63.50 5.00 NOTE: (I) APLHGRs are interpolated between exposure points for which explicit values are given.

NOTE: (2) These API.HGR are not lattice dependent. The values shown also correspond to the limiting value forhdie most limiting lattice for use when hand calculations are required.

Page,2 of 19

00 COLR2-13 NINE MILE POINT UNIT 2 Revision 0, Cycle 13 CORE OPERATING LIMITS REPORT 2.0 MINIMUM CRITICAL POWER RATIO (ODYN OPTION B) 2.1 Limits for Technical Specification 3.2.2 For 2-Pump Operation, the Minimum Critical Power Ratio (MCPR) shall be equal to or greater than the maximum of the appropriate MCPR(P) from Figures 2c, 2d and 2f or the MCPR(F) from Figure 2e.

For Single Loop Operation, the Minimum Critical Power Ratio (MCPR) shall be equal to or greater than the Minimum Critical Power Ratio for 2-Pump Operation plus 0.02.

NOTES: I. For Figures 2a and 2b tau (or "t") defined as follows:

I = ('C. - tB) / (.A - .B) where:

tA = 0.866 seconds, control rod average scram insertion time limit to notch 39 per Specification 3.1.4.

n TB= .672 + 1.65 *[ N, / E Ni ]i"2 * .016 n n tave = (ENi T i) / (YN i) i= i=H n = number of surveillance tests performed in cycle Ni = number of active control rods measured in the i'h surveillance test Ti = average scram time to notch 39 of all rods measured in the ith surveillance test N, = total number of active rods measured in Specification 3.1.4. 1.

T= 1.0 prior to performance of the initial scram time measurements for the cycle.

2. ARTS provides for power- and flow-dependent thermal limit adjustments and multipliers, which allow for a more reliable administration of the MCPR thermal limit. The MCPR(P) curves are independent of EOC-RPT and scram time option, but are determined for other EOOS. The MCPR(P) limits for PROOS were converted to a K(P) consistent with the ARTS offrated limits. MCPR(F) is independent of Scram Time Option and all EOOS.
3. The Operating Limit MCPR values for Turbine Bypass Out of Service and EOC-RPT Out of Service are higher (more limiting) than for the standard normal operation case, and are therefore specifically identified where appropriate. The OLMCPR values for all other analyzed EOOS transient events are bounded by the Normal Operation limits.
4. EOR is the End of Rated exposure as defined in the Cycle Management Report.

Page 3 of 19

COLR2-13 NINE MILE POINT UNIT 2 REVISION 0, CYCLE 13 CORE OPERATING LIMITS REPORT Figure 2a MCPR Operating Limits (Beginning Of Cycle to EOR-2628 MWdlST) 1.54 (1,1.53) 1.52 (1,1.51) 1.5 1.48 0

1.46

.5 E

1.44 MU I._

=E 1.42 (1,1.42) 1.4 1.38 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 Tau Page 4 of 19

COLR2-13 NINE MILE POINT UNIT 2 REVISION 0, CYCLE 13 CORE OPERATING LIMITS REPORT Figure 2b MCPR Operating Limits (EOR-2628 MWd/ST to End Of Cycle) 1.66 1.64 1.62 1.6 1.58 0 1.56 EOC-RPT Inoperable 1.54 E

1.52 0000'1,1.51

h. I E 1.5 Turbine Bypass Inoperable 1.48 I

1.46 0, 1.44 * *- *Normal Operation 1.44 1.42 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 Tau Page 5 of 19

COLR2-13 NINE MILE POINT UNIT 2 REVISION 0, CYCLE 13 CORE OPERATING LIMITS REPORT Figure 2c MCPR(P) for <30%Power, 575%Flow K(P) for >30% Power For Equipment In Service and Recirculation Pum Tr Out of Service 3.500 3.250


MCPR(P) = 2.29 + 2.60E-02(30.0-P) for 25.0% s P < 30.0%

MCPR(P) = K(P)*(the appropriate MCPR limit from Figures 2a or 2b) for 30.0% S P S 100.0%

3.000

-.- K(P) = 1.340 + 7.78E-03(48.0-P) for 30.0% 5 P <48.0%

K(P) = 1.150 + 8.67E-03(60.0-P) for 48% < P < 60.0%

K(P) = 1.000 + 3.75E-03(100.0-P) for 60.0% < P < 100.0%

2.750 2.500 0~ 2.250 a

2.000 1.750 1.500 1.250 1.000 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power (% Rated)

Page 6 of 19

COLR2-13 NINE MILE POINT UNIT 2 REVISION 0, CYCLE 13 CORE OPERATING LIMITS REPORT Figure 2d MCPR(P) for <30%Power, <75%Flow K(P) for >30% Power for Turbine Byass Out of Service 3.500 3.250

--- MCPR(P) = 263 + 9.20E-02(30.0-P) for 25.0% S P < 30.0%

MCPR(P) = KjP)*(the appropriate MCPR limit from Figures 2a or 2b) for 30% 5 P 5 100.0%

31000

--- K(P) = 1.340 + 7.78E-03(48.0-P) for 30.0% s P s 48.0%

K(P) = 1.150 + 8.67E-03(60.0-P) for 48% < P < 60.0%

2.750 K(P) = 1.000 + 3.75E-03(100.0-P) for 60.0% s P < 100.0%

2.500 2.250 cc 2.000 1.750 1.500 1.250 1.000 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power (% Rated)

Page 7 of 19

COLR2-13 NINE MILE POINT UNIT 2 REVISION 0, CYCLE 13 CORE OPERATING LIMITS REPORT Figure 2e Flow-Dependent MCPR Limits 1.800 1.700 1.600 1.500 U.

Ix C.

-1.400 1.300 1.200 1.100 20 30 40 50 60 70 80 90 100 110 120 Flow (% Rated)

Page 8 of 19

COLR2-13 NINE MILE POINT UNIT 2 REVISION 0, CYCLE 13 CORE OPERATING LIMITS REPORT Figure 2f MCPR(P) for <30%Power, <75%Flow K(P) for >30% Power for Operation without a Backup Pressure Regulator 3.500 3.250 3.000 2.750 2.500 CL Ir 2.250 IL VU 2.000 1.750 1.500 1.250 1.000 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power (% Rated)

Page 9 of 19

COLR2-13 NINE MILE POINT UNIT 2 Revision 0, Cycle 13 CORE OPERATING LIMITS REPORT 3.0 LINEAR HEAT GENERATION RATE (LHGR).

3.1 Limits for Technical Specification 3.2.3 During power operation, the Linear Heat Generation Rate (LHGR) of any rod in any fuel assembly at any axial location shall not exceed the minimum of: 1) the limiting values shown in RSLD- 12, Revision 0, "Nine Mile Point Unit 2 Reload 12, Reload Specific Lattice Data" times the LHGRFAC(F) from Figure 3a; and 2) the limiting values shown in RSLD-12, Revision 0, "Nine Mile Point Unit 2 Reload 12, Reload Specific Lattice Data" times the appropriate LHGRFAC(P) from Figures 3b or 3c or 3d. RSLD-12, Revision 0 contains the LHGR limits for both UO2 rods (which contain no gadolinium) and the most limiting gadolinium-bearing rods. Other gadolinium-bearing rods have LHGR limits which lie between these two curves.

Compliance with these limits will be monitored by the plant's process computer.

-NOTE: ARTS provides for power- and flow-dependent thermal limit multipliers, which allow for a more reliable administration of the LHGR thermal limits. The LHGRFAC(P) curves are independent of recirculation pump trip operability, but are determined for other EOOS. The LHGRFAC (P) limits for PROOS are also presented in a manner more consistent with the ARTS offrated limits. LHGRFAC(F) is identical for all EOOS.

Page 10 of 19

COLR2-13 NINE MILE POINT UNIT 2 CORE OPERATING LIMITS REPORT REVISION 0, CYCLE 13 Figure 3a Flow-Dependent LHGR Multiplier LHGRFAC(F) 1.100 (85, 1.00) 1.000 (112,1.00) 0.900 0.800 0.700 (30,_.626)1/04 U- 0.600 0

U-0.500 0

z

-J 0.400 0.300 0.200

  • ---LHGRFAC(F) =MIN(l.0,[.681*F/100 + .421]

0.100 o.0oo 20 30 40 50 60 70 80 90 100 110 120 Flow (% Rated)

Page 11 of 19

COLR2-13 NINE MILE POINT UNIT 2 REVISION 0, CYCLE 13 CORE OPERATING LIMITS REPORT Figure 3b Power-Dependent LHGR Multiplier LHGRFAC(P) for Equipment in Service and Recirculation Pump Trip Out of Service (100, 1.00) 1.000 0.900 0.800 0.700 0.600 (251,0.608) 0.

0.500 U-

.,J 0.400 0.300 0.200


LHGRFAC(P) = .634 + 5.23E-03(P-30.0) for 25-0% ! P < 30.0%

0.100

--- LHGRFAC(P) = 1.000 + 5.23E-03(P-100.0) for 30.0% 5 P < 100.0%

1 I 0.000 20 30 40 50 60 70 80 90 100 Power (% Rated)

Page 12 of 19

COLR2-13 NINE MILE POINT UNIT 2 REVISION 0, CYCLE 13 CORE OPERATING LIMITS REPORT Figure 3c "

Power-Dependent LHGR Multiplier LHGRFAC(P) for Turbine Bypass Out of Service (100, 1.00) 1.000 0.900 0.800 0.700 (30, 0.634) 0.600 (30, 0.683)

    1. 000 C-. (25, 0.549) 0.500 0.400 0.300

- LHGRFAC(P) = .583 + 6.80E-03(P-30.0) for 25.0% < P < 30.0%

0.200 LHGRFAC(P) = 1.000 + 5.23E-03(P-100.0) for 30.0% s P < 100.0%

0.100 0.000 _ _ _ _ _ _ _ _ _ 1 _ _ _ __ 1 _ _ _ _ _ _ _

20 30 40 50 60 70 80 90 100 Power (% Rated)

Page 13 of 19

COLR2-13 NINE MILE POINT UNIT 2 REVISION 0, CYCLE 13 CORE OPERATING LIMITS REPORT Figure 3d Power-Dependent LHGR Multiplier LHGRFAC(P) for Operation without a Backup Pressure Regulator 1.000 0.900 0.800 0.700 0.600 0~

C, 4 0.500 IL C,

z 0.400

-J 0.300 0.200 0.100 0.000 20 30 40 50 60 70 80 90 100 Power (% Rated)

Page 14 of 19

COLR2-13 NINE MILE POINT UNIT 2 Revision 0, Cycle 13 CORE OPERATING LIMITS REPORT 4.0 AVERAGE POWER RANGE MONITOR SETPOINTS 4.1 Limits for Technical Specification Table 3.3.1.1-1 (OPRM Upscale)

ALLOWABLE VALUE < 1.13 Page 15 of 19

C(OLR2-13 NINE MILE POINT UNIT 2 Revision 0, Cycle 13 CORE OPERATING LIMITS REPORT 5.0 Control Rod Block Instrumentation 5.1 Footnote Values for Technical Specification Table 3.3.2.1-1 (a) MCPR < 1.70 (b) MCPR < 1.70 (c) MCPR < 1.70 (d) MCPR < 1.40 (e) MCPR < 1.70 (h) Allowable Value:

Low Power Range - Upscale 124.6 Intermediate Power Range - Upscale 119.6 High Power Range - Upscale 114.6 (i) NTSP:

Low Power Range - Upscale 124.2 Intermediate Power Range - Upscale 119.2 High Power Range - Upscale 114.2 Page 16of 19

COLR2-13 NINE MILE POINT UNIT 2 Revision 0, Cycle 13 CORE OPERATING LIMITS REPORT

6.0 REFERENCES

FOR TECHNICAL SPECIFICATION Technical Specification 5.6.5.b. 1:

General Electric Standard Application for Reactor Fuel, NEDE 24011-P-A- 16 and NEDE 24011-P-A- 16-US (October 2007).

Page 17 of 19

COLR2-13 NINE MILE POINT UNIT 2 Revision 0, Cycle 13 CORE OPERATING LIMITS REPORT

7.0 REFERENCES

FOR TECHNICAL SPECIFICATION BASES

2. 1.1 BASES REFERENCE 3:

General Electric Standard Application for Reactor Fuel, NEDE 24011-P-A-16 and NEDE 2401 I-P-A-16-US (October 2007).

2.1.1 BASES REFERENCE 4:

Supplemental Reload Licensing Report for Nine Mile Point Nuclear Station Unit 2, Reload 12, Cycle 13, 0000-0080-4339-SRLR, Rev. 0, January 2010.

3.1.1 BASES REFERENCE 7:

General Electric Standard Application for Reactor Fuel, NEDE 2401 I-P-A-16 and NEDE 2401 I-P-A-16-US (October 2007).

3.1.6 BASES REFERENCE 1:

Supplemental Reload Licensing Report for Nine Mile Point Nuclear Station Unit 2, Reload 12, Cycle 13, 0000-0080-4339-SRLR, Rev. 0, January 2010.

3.2.1 BASES REFERENCE 1:

General Electric Standard Application for Reactor Fuel, NEDE 2401 I-P-A- 16 and NEDE 24011 -P-A- 16-US (October 2007).

3.2.2 BASES REFERENCE 2:

General Electric Standard Application for Reactor Fuel, NEDE 2401 ]-P-A-16 and NEDE 24011 -P-A-16-US (October 2007).

3.2.2 BASES REFERENCE 3:

Supplemental Reload Licensing Report for Nine Mile Point Nuclear Station Unit 2, Reload 12, Cycle 13, 0000-0080-4339-SRLR, Rev. 0, January 2010.

3.2.3 BASES REFERENCE 1:

General Electric Standard Application for Reactor Fuel, NEDE 2401 1-P-A-16 and NEDE 2401 I-P-A-16-US (October 2007).

3.2.3 BASES REFERENCE 2:

Supplemental Reload Licensing Report for Nine Mile Point Nuclear Station Unit 2, Reload 12, Cycle 13, 0000-0080-4339-SRLR, Rev. 0, January 2010.

3.2.4 BASES REFERENCE 3:

General Electric Standard Application for Reactor Fuel, NEDE 2401 I-P-A-16 and NEDE 24011-P-A-16-US (October 2007).

Page 18 of 19'

COLR2-13 NINE MILE POINT UNIT 2 Revislon0, Cycle 13 CORE OPERATING LIMITS REPORT 8.0 SOURCE DOCUMENTS The Core Operating Limits contained in this report were obtained from the following documents:

Section 1.0 - APLHGR LIMITS Supplemental Reload Licensing Report for Nine Mile Point Nuclear Station Unit 2, Reload 12, Cycle 13, 0000-0080-4339-SRLR, Rev. 0, January 2010.

Section 2.0 - MCPR LIMITS Supplemental Reload Licensing Report for Nine Mile Point Nuclear Station Unit 2, Reload 12, Cycle 13, 0000-0080-4339-SRLR, Rev. 0, January 2010.

Nine Mile Point Station Unit 2 - APRM/RBM/Technical Specifications/Maximum Extended Load Line Limit Analysis (ARTS/MELLLA), NEDC-33286P, Rev. 0, March 2007 Nine Mile Point Nuclear Station Unit 2 ARTS/MELLLA, Task T0900, GE-NE-0000-0055-2373-R0, Rev. 0, February 2007 Engineering Report for Nine Mile Point Nuclear Station Unit 2, Reload II, Cycle 12, 0000-0067-127 1-ER, Rev 0, March 2008 Section 3.0 - LHGR LIMITS Supplemental Reload Licensing Report for N;ne Mile Point Nuclear Station Unit 2, Reload 12, Cycle 13, 0000-0080-4339-SRLR, Rev. 0, January 2010.

Nine Mile Point Station Unit 2 - APRM/RBM/Technical Specifications/Maximum Extended Load Line Limit Analysis (ARTS/MELLLA), NEDC-33286P, Rev. 0, March 2007 Nine Mile Point Nuclear Station Unit 2 ARTS/MELLLA, Task T0900, GE-NE-0000-0055-2373-RO. Rev. 0, February 2007 Section 4.0 - APRM SETPOINTS Supplemental Reload Licensing Report for Nine Mile Point Nuclear Station Unit 2, Reload 12, Cycle 13, 0000-0080-4339-SRLR, Rev. 0, January 2010.

Design Specification Data Sheet 22A2843AM (NMPCNO NSSS 161405000),

Neutron Monitoring System.

Section 5.0 - Control Rod Block Instrumentation Supplemental Reload Licensing Report for Nine Mile Point Nuclear Station Unit 2, Reload 12, Cycle 13, 0000-0080-4339-SRLR, Rev. 0, January 2010.

Nine Mile Point Station Unit 2 - APRM/RBM/Technical Specifications/Maximum Extended Load Line Limit Analysis (ARTS/MELLLA), NEDC-33286P, Rev. 0, March 2007 Nine MilePoint Nuclear Station Setpoint Data Sheet (SPDS) 2NMP-RBM, Rod Block Monitor Setpoints Page 19 of 19