ML101250163

From kanterella
Jump to navigation Jump to search
Radioactive Effluent Release Report
ML101250163
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/29/2010
From: Holt J
Florida Power Corp, Progress Energy Co, Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0410-05
Download: ML101250163 (1)


Text

NProgress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 50.36a(a)(2)

ITS 5.7.1.1(c)

April 29, 2010 3F0410-05 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - 2009 Radioactive Effluent Release Report

Dear Sir:

Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc., hereby submits the 2009 Radioactive Effluent Release Report for Crystal River Unit 3 (CR-3) in accordance with 10 CFR 50.36a(a)(2) and the CR-3 Improved Technical Specifications (ITS),

Section 5.7.1.1(c). The subject report (Attachment A) includes a summary of the quantities of radioactive liquid and gaseous effluents, and solid waste released from the CR-3 site during 2009.

The material provided is consistent with the objectives outlined in the Off-Site Dose Calculation Manual (ODCM) and the Process Control Program (PCP), and is in conformance with 10 CFR 50, Appendix I, Section IV.B. 1.

The CR-3 ITS, Section 5.6.2.3, requires submittal of licensee initiated changes to the ODCM as part of the Radioactive Effluent Release Report for the period of the report in which any changes were made. The ODCM was revised once in 2009 and is included in this submittal as Attachment B. The ODCM, Revision 32, changes are delineated in Attachment A, specifically on Page 13.

The PCP was not revised in 2009.

This letter establishes no new regulatory commitments.

If you have any questions regarding this submittal, please contact Mr. Dan Westcott, Superintendent, Licensing and Regulatory Programs at (352) 563-4796.

S ncerely, ames W. Holt Plant General Manager JWH/ff Attachments:

A.

Radioactive Effluent Release Report 2009 B.

Off-Site Dose Calculation Manual, Revision 32 xc:

NRR Project Manager Regional Administrator, Region II Senior Resident Inspector Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428

/