Text
tLaket,' Louis.
From:.
Sent:
To:
,Subjeqt:
Attachments:
Carrion, Robert Monday, November 16, 2009 1:15ý PM Lake' ' Louis Background.doc Background.doc
- Lou, In case you, wanted the digital version of my background information, it is attached.
Bob*
Ii 4
Wkwbmition in this record was deleted in, caworanoe wI,he Freedom of Infornso Am.
11MHW I
BackaroundtExoerience of Robert, Carrion Academic (b)(s)
-Graduated from Universityof Maryland with BS in Civil Engineering, with a concentration in structural design, including rei forced concrete and structural steel 1.976:-ý Graduated from University of-Maryland with MS in Structural Engineering, including advanced structural design 1977T-.Completed the requirements to be a RegistetedProfessional Engineer (Virginia:#0402 0:009517)
,Experience 1973-1979 1979-1981 1981-1982 1982-1987 1987-2009 Design engineer working with Bechtel Power Corporation. Design of civil/structuralelemrents of nuclear power plants,, including reinforced concrete Seismic Class I structures (including containment buildings) and structural steel for Millstone 2, SNUPPS, Davis Besse Member of engineering consultant team constructing oil-burning electric plants in Maracaibo, Venezuela Member of. engineering consultanthteamconstructing oil-burning electric plants in Pueto Cabello, Venezuela Field engineer at Plant Vogtle during its conistruction* responsible for assuring that the constructionof the reinforced concrete. Control Building wa~s done in accordance with approved drawings, procedures, materials, etc.;Jfor dispositioning non-conformance reports which dealt with lresolving drawing..
discrepancies, rebar interferences, material acceptability (lump, :air entrainment, aggregate), etc.;. and resolving construction problems withi.concrete (voids, cold joints, etc.) and:rebar (interferences, i.splice lengths, radiusbends, etc.).
Inspector at the'NRC in various areas, including: Inservice Inspection (1987-1989), whichi'also_ involved inspecting licensee complia'nco*.to,NRC.Bulletins 79-02 and 79-14, !which dealt with base plates and piping suppors; Radisation Protection (1989.1996), Reactor Operatin Inspeictor (1996-2007), inservice Inspection'(2007-Present), which includes review of licensee. compliance with ASME Section:Xl, Subsection IWL, Concrete Components of Light-Water Nuclear Power Plants.