E-Mail from Lake to Masters, Update on Crystal River
ML101170821
Person / Time
Site: Crystal River 
Issue date: 12/14/2009
From: Lake L
NRC/RGN-II/DRS/EB3
To: Masters A
NRC/RGN-II/DCI/CIB2
References
FOIA/PA-2010-0116
Download: ML101170821 (1)


Text

Masters, Anthony From:

Lake, Louis Sent:

Monday, December 14, 2009 12:57 PM To:

Masters, Anthony

Subject:

RE: Update on Crystal River Categories:

Perform Review You are correct. In order for the NDE ( used in the extent of condition of the de-lamination) to identify cracks close to the liner it would have to be calibrated to do so. The extent of condition NDE was set up to identify the existence of the de-lamination and could not examine the concrete inside of the de-lamination. It could examine the concrete a short distance (distance calibrated for) beyond the depth of the de-lamination if there was no delamination to interfere with the NDE. Also these cracks were not seen prior to the reinstallation of the liner plate.

Lou From: Masters, Anthony

( "

Sent: Friday, December 11, 2009 9:16 AM To: Lake, Louis Cc: Dan naus; Carrion, Robert; Thomas, George

Subject:

RE: Update on Crystal River

Lou, I do not believe that the NDE used for scanning the building would have been able to identify this size crack at this depth near the liner from the outside surface. Therefore, it may be interesting to review the official justification/conclusion regarding this crack and how it can be confidently stated that this is a localized

.occurrence on in this one section. Also, I do not believe any of the cores went to this depth to justify this. It was my understanding that they had planned to get a couple of 30" cores, but this looks as if it would have been deeper than that.

Anthony D. Masters, PE Senior Construction Inspector Division of Construction Inspections U.S. Nuclear Regulatory Commission Region II - Atlanta (404) 562 - 0612 (office phone)

(404) 562 - 0559 (fax)

Anthony.Masters@nrc.gov From: Lake, Louis Sent: Thursday, December 10, 2009 11:54 AM To: Franke, Mark; Saba, Farideh; Sykes, Marvin; Khanna, Meena; Reyes, Luis; Kennedy, Kriss; Wert, Leonard; Munday, Joel; Morrissey, Thomas; Reyes, Rogerio; Dan naus; Lake, Louis; Masters, Anthony; Carrion, Robert; Thomas, George

Subject:

Update on Crystal River I received the following update on three areas from Garry Miller this morning:

Field Work While removing grout (that was temporarily installed to provide a level surface for the SGR platform) from the bottom of the SGR opening cracks were identified in the containment concrete close to the containment liner.