E-Mail from Lake to Franke, SIT Experience for Mr. Ryes
ML101170738
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/17/2009
From: Lake L
NRC/RGN-II
To: Mark Franke
NRC/RGN-II
References
FOIA/PA-2010-0116
Download: ML101170738 (2)


Text

Franke, Mark From:

Lake, Louis Sent:

Tuesday, November 17, 2009 1:11 PM To:

Franke, Mark

Subject:

FW: SIT experience for Mr. Reyes Anthony Masters experience was not included in the summary I gave you yesreday. You can incorporate his info as follows:

- Add another PE in Civil Engineering

-Add 10 yers on Concrete inspections

- Add MS in dual majors in Mechanical and Civil Engineering for education.

Hope its not too late.

Lou Original Message -----

From: Masters, Anthony Sent: Monday, November 16, 2009 8:15 PM To: Lake, Louis

Subject:

SIT experience for Mr. Reyes

Lou, I have a BS with dual majors in Mechanical and Civil Engineering with concentration on Structures. I have a MS in Civil Engineering and did my Masters Thesis Report on Post-Tensioned Anchors used for Improving Stability at Dams. I have a PE license in Civil Engineering. I have been doing civil engineering work with concrete inspections and projects for over 10 years, and worked for 5 years with the FERC where I got to work on determining potential failure modes of concrete hydro facilities and was involved in post-failure forensics analyses with Taum Sauk Dam in Missouri.

If you need more let me know.

Thanks again, Anthony D. Masters, PE Senior Construction Inspector Division of Construction Inspections U.S. Nuclear Regulatory Commission Region II - Atlanta (404) 562 - 0612 (office phone)

(404) 562 - 0559 (fax)

Anthony. Masters(anrc.qov From: Lake, Louis

  • JY Sent: Tuesday, November 10, 2009 4:39 PM To: Masters, Anthony

Subject:

RE: December Thank you for the info. I will include your availability in future schedules.

Also, could you put together your experience (in years) related to the issues we have been reviewing on the SIT. Luis Reyes (Regional Administrator) wants to be prepared to answer any questions about the experience 121

of the SIT team during the public meeting on Nov. 20. I will include your input along with the other team members.

Thank you for your support Lou From: Masters, Anthony Sent: Tuesday, November 10, 2009 2:31 PM To: Carrion, Robert; Dan Naus; Lake, Louis; Thomas, George

Subject:

December

Lou, As we were discussing recently, I have moved my WB2 inspection to January, therefore, it has opened up some additional availability in December if needed for me to make site visits to Crystal River.

Thanks again, Anthony D. Masters, PE Senior Construction Inspector Division of Construction Inspections U.S. Nuclear Regulatory Commission Region II - Atlanta (404) 562 - 0612 (office phone)

(404) 562 - 0559 (fax)

Anthony.Masters(anrc..qov 122