E-Mail from Sykes to Franke, Crystal River, Unit 3 Containment Cracks
ML101170331
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/07/2009
From: Marvin Sykes
NRC/RGN-II
To: Christensen H, Mark Franke
NRC/RGN-II
References
FOIA/PA-2010-0116
Download: ML101170331 (2)


Text

Franke, Mark From:

Sykes, Marvin Sent:

Wednesday, October 07, 2009 2:27 PM To:

Franke, Mark; Christensen, Harold Cc:

Kennedy, Kriss

Subject:

RE: Crystal River U3 Containment cracks Thanks From: Franke, Mark

  • yI Sent: Wednesday, October 07, 2009 12:20 PM To: Sykes, Marvin; Christensen, Harold Cc: Kennedy, Kriss

Subject:

FW: Crystal River U3 Containment cracks fyi - earlier Luis had asked about the timing of the Containment Construction Integrity Test.

I saw him in the hallway and let him know one was performed after the dome was repaired.

From: Chou, Rich Sent: Wednesday, October 0 09 12:00 PM To: Franke, Mark Cc: Michel, Eric

Subject:

RE: Crystal River U3 Containment cracks Mark:

Based on the Dome Delamination and Repair Report, the licensee sucessfully completed Containment Construction Integrity Test after the repair in December 1976.

From: Franke, Mark Sent: Wednesday, October 07, 2009 10:12 AM To: Chou, Rich Cc: Michel, Eric

Subject:

RE: Crystal River U3 Containment cracks Yes, we plan a call tomorrow.

Do you know whether the licensee's contruction containment integrity test was before of after the dome issue?

We'll need to find this out.

From: Chou, Rich....

Sent: Wednesday, October 07, 2009 9:35 AM

\\

To: Franke, Mark

Subject:

RE: Crystal River U3 Containment cracks Mark:

You are welcome.

I heard that we might have a conference call tomorrow among Progress, NRC site, Region II, and HQto deal with the concrete cracks affecting the Hatch Transfer System in the original design to put the support on the opening wall of the containment. The licensee has not come out with any resolution to change their design. The licensee is searching for a 229

company to use a sound system to detect the extend of the cracks around the bottom wall of the opening to evaluate the impact to the movement of the Old and new Steam Generators.

From: Franke, Mark Sent: Wednesday, October 07, 2009 6:36 AM To: Chou, Rich

Subject:

RE: Crystal River U3 Containment cracks Thanks Rich.

From: Chou, Rich j

Sent: Tuesday, October 06, 2009 4:54 PM To: Franke, Mark Cc: Carrion, Robert; Blake, Jerome; Plisco, Loren; Sykes, Marvin; Morrissey, Thomas; Reyes, Rogerio; Chou, Rich

Subject:

FW: Crystal River U3 Containment cracks Mark:

Attached are concrete cracks at the opening of the containment wall. The cracks were shown around the opening. Per the email from Len Wert, the cracks could be from the top to the bottom of the containment wall and 360 degrees around. Jery Blake mentioned the Crystal River dome lamination problem and repair during the construction. I noticed the dome problem from the Condition Report early this morning and am reviewing the Dome Lamination report prepared by the Gilbert Association dated December 1976.

Based on the review of the Condition Report for the current crack in 2009, Sixth Tendon Surveillance Report in April 1998, and the Dome Lamination and Repair Report in 1972, there is a potential relation of the dome cracks or lamination and current containment wall concrete cracks.

From: Reyes, Rogerio Sent: Tuesday, October 06, 2009 4:18 PM To: Sykes, Marvin Cc: Chou, Rich

Subject:

Crystal River U3 Containment cracks Marvin and Rich, attached are the pictures of the containment. All four sides of the opening have cracks. As we discussed, the licensee is modifying the base plate for anchor bolting for SG replacement.

J. Rogerio Reyes, P.E.

U.S. Nuclear Regulatory Commission Resident Inspector Crystal River Nuclear Power Plant 230