ML101170118

From kanterella
Jump to navigation Jump to search
Withdrawal of Exemption Requests from 10 CFR 50 Appendix R
ML101170118
Person / Time
Site: Pilgrim
Issue date: 04/08/2010
From: Bethay S
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.10.019
Download: ML101170118 (2)


Text

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Stephen J. Bethay Director, Nuclear Safety Assurance April 8, 2010 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Withdrawal of Exemption Requests from 10 CFR 50 Appendix R

Reference:

(1) Entergy Letter, "Request for Exemption from 10 CFR 50 Appendix R Section III.G.2 to Allow Hot Shutdown Manual Operator Actions," dated March 6, 2009.

(2) NRC Letter, "Request for Additional Information for Exemption to Allow Hot Shutdown Manual Actions at Pilgrim Nuclear Power Station (TAC No. ME0831)," dated October 23, 2009.

(3) Entergy Letter, "ResponsetoANC RAI for Exkpdetior, to AllowHot

. Shufa-wn Manual Actions al PikgiiN'ucliar Power Station" (TAC Noe:

ME0)8'3 datedDecember"8,2009-(4) EHftrgy Leit6r, for Lxenptiol* fromfRequet 10 ,CFR50 Appendix R

... .... lll.L.2.b Fer~f0i~ ane-oal ioSatisfying the 'Reactor Coolant Section M.'eudp Finc~iion, dated Febiuary.3,-2010. " .

LETTE. NUMBER: 2i0.019.

Dear Sir or Madam:

By Reference 1, Pilgrim Nuclear Power Station (Entergy) submitted an exemption request from 10 CFR 50 Appendix R Section III.G.2 to allow hot shutdown manual operator action s..By Reference 2, the NRC issued a request for additional infurmation (RAI) app'licable to ihe exemption.

Entergy respoi~ed tc the RAi by Ref erence 3. This RAI response included the following: a) Withd.lradI of'the,- xep Ii "-tpplicabe t83o6the .4 fire zone".;

addressed in Reference 1,b) thep'urpose of tfh'c-exernptibn requested '.or.Fire Zone 2.16 was changed from Appendix R Section IlI.G.,2 to allow hot shutdown manual actions to Apdpen i* Sectiorih'I.Gd. for iackl`"6ofire suppression in an aiternate

'R shutdown area; andc) an additional exemption from' 10 ,.R 50-Apindix R.Sectinn IlliL.2.b will be pvi;-ded for all foe aTeas relying-on ow pressure sylems forreactor inventory control, Entergy prpovided this additional exemption in Reference 4.

-** *',* :4.


c

Entergy Nuclear Operations Inc. Letter Number: 2.10.019 Pilgrim Nuclear Power Station Page 2 Subsequently, on February 25, 2010, the NRC technical staff and Entergy held a conference call to discuss the changes identified in the response to the RAI and the new exemption (Reference 4).

Based on the conference call and the changes to the initial exemption (Reference 1),

Entergy has elected to withdraw the initial exemption. A revised exemption for Fire Zone 2.16 will be submitted.

In addition, Entergy withdraws the exemption submitted in Reference 4. Withdrawal of this exemption is based on the conference call discussion and information contained in NRC Staff Memorandum from Sunil Weerakkody, Chief Fire Protection and Special Projects Section, Subject "Resolution of Questions Concerning Compliance with Section III.L.2 of Appendix R," dated February 10, 2005 (ML050330417).

This letter contains no new commitments.

Please do not hesitate to contact Mr. Joseph R. Lynch, (508) 830-8403, if there are any questions regarding this submittal.

Sincerely, Stel enJ.hay.t Director, Nuclear Safety Assurance cc: Mr. James S. Kim, Project Manager Plant Licensing Branch I-1 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North O-8C2 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulator Commission 475 Allendale Road King of Prussia, PA 19406-1415 Office of the Resident Inspector U.S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360