Letter Sequence Response to RAI |
---|
TAC:ME1872, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
|
MONTHYEARML0926604942009-09-23023 September 2009 Acceptance Review Email, License Amendment Request, Modify Technical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals Project stage: Acceptance Review RBG-46985, Unit 1, Supplement to License Amendment Request (LAR) LAR 2009-05, Dated August 10, 2009 Regarding 24-Month Fuel Cycles2009-12-0808 December 2009 Unit 1, Supplement to License Amendment Request (LAR) LAR 2009-05, Dated August 10, 2009 Regarding 24-Month Fuel Cycles Project stage: Supplement RBG-47021, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles2010-04-22022 April 2010 Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles Project stage: Response to RAI ML1013302722010-05-13013 May 2010 Request for Additional Information Regarding 24 Month Cycle Project stage: RAI RBG-47043, Modification of License Amendment Request by Withdrawing the Proposed Changes Related to TS 3.3.8.1, Loss of Power Instrumentation.2010-06-16016 June 2010 Modification of License Amendment Request by Withdrawing the Proposed Changes Related to TS 3.3.8.1, Loss of Power Instrumentation. Project stage: Request ML1019300932010-07-12012 July 2010 E-mail, Bases Markups Related to License Amendment Request to Modify Technical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals Project stage: Request ML1019301002010-07-12012 July 2010 Bases Markups Related to License Amendment Request to Modify Technical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals Project stage: Request ML1023501552010-08-17017 August 2010 Response to Request for Additional Information on License Amendment Request 2009-05, 24-month Fuel Cycles Project stage: Response to RAI ML1023502662010-08-31031 August 2010 Issuance of Amendment No. 168, Modify Technical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals Project stage: Approval ML13350A1612015-02-10010 February 2015 Correction to Safety Evaluation Related to Amendment No. 168 Which Modified Techical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals; Enclosed New SE Section 3.1.7B Project stage: Approval 2010-06-16
[Table View] |
|
---|
Category:Letter type:RBG
MONTHYEARRBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection RBG-48258, Notification of Readiness for Supplemental Inspection2023-10-0505 October 2023 Notification of Readiness for Supplemental Inspection RBG-48259, Revision to Reply to Notice of Violation; EA-23-0552023-10-0303 October 2023 Revision to Reply to Notice of Violation; EA-23-055 RBG-48254, Report of Changes and Errors to 10CFR50.462023-09-21021 September 2023 Report of Changes and Errors to 10CFR50.46 RBG-48249, Reply to a Notice of Violation, EA-23-0712023-09-14014 September 2023 Reply to a Notice of Violation, EA-23-071 RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 222023-09-12012 September 2023 Submittal of Owner'S Activity Report Form for Cycle 22 RBG-48247, Reply to Notice of Violation; EA-23-0552023-08-21021 August 2023 Reply to Notice of Violation; EA-23-055 RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 02023-05-31031 May 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 0 RBG-48237, Response to NRC Integrated Inspection Report 05000458/20230012023-05-25025 May 2023 Response to NRC Integrated Inspection Report 05000458/2023001 RBG-48221, 2022 Annual Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Radiological Environmental Operating Report RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-27027 February 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RBG-48142, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-27027 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RBG-48198, Report of Changes and Errors to 10CFR50.462022-09-22022 September 2022 Report of Changes and Errors to 10CFR50.46 RBG-48187, Notification of Spent Fuel Cask Use2022-08-15015 August 2022 Notification of Spent Fuel Cask Use RBG-48184, Notification of Spent Fuel Cask Use2022-07-18018 July 2022 Notification of Spent Fuel Cask Use RBG-48178, Notification of Spent Fuel Cask Use2022-06-29029 June 2022 Notification of Spent Fuel Cask Use RBG-48166, Supplement to Special Report for Tritium Discovered Onsite2022-05-12012 May 2022 Supplement to Special Report for Tritium Discovered Onsite RBG-48148, 2021 Annual Radiological Environmental Operating Report2022-04-27027 April 2022 2021 Annual Radiological Environmental Operating Report RBG-48149, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report RBG-48134, Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency2021-11-29029 November 2021 Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency RBG-48136, Additional Information for the 2020 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2020 Annual Radioactive Effluent Release Report RBG-48137, Additional Information for the 2019 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2019 Annual Radioactive Effluent Release Report RBG-48128, Reply to a Notice of Violation; EA-21-017, 030 and 0502021-10-29029 October 2021 Reply to a Notice of Violation; EA-21-017, 030 and 050 RBG-48129, Payment of a Civil Penalty2021-10-21021 October 2021 Payment of a Civil Penalty RBG-48112, Report of Changes and Errors to 10CFR50.462021-09-16016 September 2021 Report of Changes and Errors to 10CFR50.46 RBG-48110, Core Operating Limits Report (COLR) - Cycle 22, Revision 12021-08-19019 August 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 1 RBG-48104, Fitness for Duty Blind Quality Assurance Specimen Testing Error2021-06-30030 June 2021 Fitness for Duty Blind Quality Assurance Specimen Testing Error RBG-48099, Submittal of Owner'S Activity Report Form for Cycle 212021-06-16016 June 2021 Submittal of Owner'S Activity Report Form for Cycle 21 RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials2021-06-15015 June 2021 Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials RBG-48093, Corrected 2020 Annual Radiological Environmental Operating Report2021-05-20020 May 2021 Corrected 2020 Annual Radiological Environmental Operating Report RBG-48081, 2020 Annual Radioactive Effluent Release Report2021-04-20020 April 2021 2020 Annual Radioactive Effluent Release Report RBG-48082, 2020 Annual Radiological Environmental Operating Report2021-04-20020 April 2021 2020 Annual Radiological Environmental Operating Report RBG-48078, Core Operating Limits Report (COLR) - Cycle 22, Revision 02021-03-14014 March 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 0 RBG-48075, Notification of Deviation from BWRVIP Guidelines2021-02-24024 February 2021 Notification of Deviation from BWRVIP Guidelines RBG-48074, Spent Fuel Storage Radioactive Effluent Release Report for 20202021-02-22022 February 2021 Spent Fuel Storage Radioactive Effluent Release Report for 2020 RBG-48061, One-Time Schedular Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-12-0303 December 2020 One-Time Schedular Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency 2024-09-24
[Table view] |
Text
Entergy Operations, Inc.
River Bend Station 5485 U. S. Highway 61N "EntergyJ St. Francisville, LA 70775 Tel 225 381 4149 EFax 225 635 5068 jrober3@entergy.com Jerry C. Roberts Director, Nuclear Safety Assurance RBG-47021 April 22, 2010 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Response to Request for Additional Information on License Amendment Request 2009-05, 24-month Fuel Cycles River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47
REFERENCES:
- 1. Entergy letter to NRC, dated August 10, 2009, License Amendment Request 2009-05, 24-month Fuel Cycles (Letter No.
RBG-46932)
- 2. NRC letter to Entergy (via email), dated April 8, 2010, Request for Additional Information RBF1-10-0057 File Code No.: G9.5
Dear Sir or Madam:
On August 10, 2009, Entergy submitted a request to amend the station's operating license to allow implementation of 24-month fuel cycles (Reference 1). During their review, the NRC staff determined that additional information is needed to complete the processing and approval of Entergy's request. The request for that information was transmitted to Entergy per Reference 2. The attachment to this letter contains the requested information.
This letter contains no commitments. If you have any questions on this matter, please contact David Lorfing, Manager - Licensing, at 225-381-4157.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, DirctJerry C. Roberts Director - Nuclear Safety Assurance cof~-
RBG-47021 April 22, 2010 Page 2 of 2
Attachment:
Response to Request for Additional Information cc: Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector P. O. Box 1050 St. Francisville, LA 70775 U. S. Nuclear Regulatory Commission Attn.: Mr. Alan B. Wang One White Flint MS 0-8 B1 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Jeffrey P. Myers Louisiana Department of Environmental Quality Office of Environmental Compliance Attn.: OEC-ERSD P. 0. Box 4312 Baton Rouge, LA 70821-4312
Attachment to RBG-47021 River Bend Station License Amendment Request 2009-05 Response to Request for Additional Information
Attachment RBG-47021 April 22, 2010 Page 1 of 1 Request for Additional Information:
In your August 10, 2009, submittal, on page 15, under Section 3.4 "Source Term", it is stated that RBS's core source term will be based on the ORIGN01 P computer code instead of the previously approved CINDER computer code. Please provide additional information on any design bases parameters, assumptions or methodologies (other than the one mentioned previously) that were changed in the radiological design basis accident analyses as a result of the change? If there are many changes it would be helpful to compare and contrast them in a table. Also, please provide a justification for any changes.
Response
There are two fundamental changes related to source term discussed in the License Amendment Request, as described below.
(1) There was a change in the computer code used to generate the RBS source termr as a result of the previous transition from AREVA nuclear fuel to GNF nuclear fuel. This involved the transition from the CINDER7 computer code for generating the core source term to the ORIGEN 2.1 computer code. The CINDER7 computer code, which is no longer supported by General Electric (GE), was used for the core source term prior to the current fuel cycle. GE now uses ORIGEN 2.1, which is one of the recommended source term codes in Regulatory Guide 1.183. The change in source term computer code was approved using the 10CFR50.59 process as part of the current cycle 16 core design.
(2) The Updated Safety Analysis Report Chapter 15 accident analysis was evaluated based on the 24-month fuel cycle source term. This analysis modified the reactor core source term (radionuclide inventory) resulting from the transition to a 24-month fuel cycle. There were no other input changes. The code version used for the dose calculations was not changed. The resulting change in main control room, exclusion area boundary, and low population zone doses for each of the accident scenarios was less than 10% of the current USAR value which is within the licensee-controlled margin (refer to NEI 96-07, Section 4.3.3). This analysis is in the final stages of completion by the vendor. These changes must receive final approval by Entergy via the design change process which includes an evaluation per 10CFR50.59.