Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-24024 April 2024 Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 2024-09-06
[Table view] Category:License-Operator
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23179A1242023-06-14014 June 2023 Final QA Related Forms ML22221A0962022-08-0202 August 2022 Proposed Written Examination ML22221A1252022-08-0202 August 2022 Proposed Operating Exam ML22220A1462022-08-0202 August 2022 Administered Written Exam ML24016A1582022-08-0202 August 2022 NRC Exam Seating Chart for Written Exam Administered on July 20, 2022 ML22221A0482022-08-0202 August 2022 Review Worksheets ML22221A0432022-08-0202 August 2022 Quality Checklists ML22220A1132022-08-0202 August 2022 Administered Operating Test ML22221A0302022-08-0202 August 2022 Administrative Files RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21252A0452021-09-15015 September 2021 Requalification Program Inspection ML22073A1172021-06-21021 June 2021 2021 Final Written Exam Original Modified Questions ML21187A3072021-06-16016 June 2021 Draft Written Examination (Folder 2) ML21193A3122021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21193A3072021-06-16016 June 2021 Final Qa/Related Form - ES-401-6 (Folder 1) ML21187A3082021-06-16016 June 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21189A2882021-06-16016 June 2021 Final Qa/Related Forms (Folder 1) ML21193A3692021-06-16016 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21193A2982021-06-16016 June 2021 Miscellaneous Exam Material (Folder 1) ML21202A1642021-06-16016 June 2021 Handouts to Applicants (Folder 3) ML21193A3162021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21187A3102021-06-16016 June 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21193A3212021-06-16016 June 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21105A4352021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21187A3092021-03-29029 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21074A3242021-03-15015 March 2021 LLC - Licensed Operator Positive Fitness-For-Duty Test ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1222020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20057E5602020-02-0707 February 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20279A3312020-02-0707 February 2020 Handouts to Applicants (Folder 3) ML21025A4142020-02-0707 February 2020 Original Questions for Modified Questions ML21025A1432020-02-0707 February 2020 ES-401-6 (Folder 1) ML20274A0832020-02-0707 February 2020 Draft Written Examination (Folder 2) ML20274A0662020-02-0707 February 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20274A0942020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20274A0922020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20274A1362020-02-0707 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20057E5592020-02-0707 February 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20274A1052020-02-0707 February 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML21025A0732020-02-0707 February 2020 Final QA Related Forms (Folder 1) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19157A0962019-06-0606 June 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000317/20193012019-05-0606 May 2019 NRC Initial and Retake Operator Licensing Examination Report Er 05000317/2019301 and 05000318/2019301 ML18312A3882018-11-0707 November 2018 Senior Reactor and Reactor Operator Initial and Retake License Examinations ML18311A1292018-10-0101 October 2018 Handouts to Applicants (Folder 3) ML18311A1142018-08-0202 August 2018 Examination Approval Letter (Folder 1) ML18214A4482018-08-0202 August 2018 Initial Operator Licensing Written Examination Approval: Calvert Cliffs Nuclear Power Plant Units 1 and 2 RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations 2023-06-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23179A1242023-06-14014 June 2023 Final QA Related Forms ML22220A1132022-08-0202 August 2022 Administered Operating Test ML22221A1252022-08-0202 August 2022 Proposed Operating Exam ML22221A0302022-08-0202 August 2022 Administrative Files ML22221A0962022-08-0202 August 2022 Proposed Written Examination ML22221A0482022-08-0202 August 2022 Review Worksheets ML24016A1582022-08-0202 August 2022 NRC Exam Seating Chart for Written Exam Administered on July 20, 2022 ML22220A1462022-08-0202 August 2022 Administered Written Exam ML22221A0432022-08-0202 August 2022 Quality Checklists RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22073A1172021-06-21021 June 2021 2021 Final Written Exam Original Modified Questions ML21193A2982021-06-16016 June 2021 Miscellaneous Exam Material (Folder 1) ML21193A3072021-06-16016 June 2021 Final Qa/Related Form - ES-401-6 (Folder 1) ML21202A1642021-06-16016 June 2021 Handouts to Applicants (Folder 3) ML21193A3122021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21193A3212021-06-16016 June 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21187A3072021-06-16016 June 2021 Draft Written Examination (Folder 2) ML21189A2882021-06-16016 June 2021 Final Qa/Related Forms (Folder 1) ML21193A3692021-06-16016 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21187A3082021-06-16016 June 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21193A3162021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21187A3102021-06-16016 June 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21187A3092021-03-29029 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20274A0832020-02-0707 February 2020 Draft Written Examination (Folder 2) ML21025A4142020-02-0707 February 2020 Original Questions for Modified Questions ML21025A0732020-02-0707 February 2020 Final QA Related Forms (Folder 1) ML20279A3312020-02-0707 February 2020 Handouts to Applicants (Folder 3) ML21025A1432020-02-0707 February 2020 ES-401-6 (Folder 1) ML20274A1052020-02-0707 February 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20274A0922020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20057E5592020-02-0707 February 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20057E5602020-02-0707 February 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20274A0662020-02-0707 February 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20274A0942020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20274A1362020-02-0707 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19157A0962019-06-0606 June 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000317/20193012019-05-0606 May 2019 NRC Initial and Retake Operator Licensing Examination Report Er 05000317/2019301 and 05000318/2019301 ML18312A3882018-11-0707 November 2018 Senior Reactor and Reactor Operator Initial and Retake License Examinations ML18311A1292018-10-0101 October 2018 Handouts to Applicants (Folder 3) ML18214A4482018-08-0202 August 2018 Initial Operator Licensing Written Examination Approval: Calvert Cliffs Nuclear Power Plant Units 1 and 2 ML18311A1142018-08-0202 August 2018 Examination Approval Letter (Folder 1) RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18311A1132017-12-14014 December 2017 NRC Corporate Notification Letter (Folder 1) RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000317/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000317/2017301 and 05000318/2017301 2023-06-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 Apr; 1 2, 2010 Mr. George H. Gellrich, Site Vice President Constellation Energy Nuclear Group, LLC Calvert Cliffs Nuclear Power Plant, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702
SUBJECT:
SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS-CALVERT CLIFFS
Dear Mr. Gellrich:
In a telephone conversation on March 24, 2010, between Mr. C. Jones, Operations Training Manager, and Mr. P. Presby, Chief Examiner, arrangements were made for the administration of licensing examinations at Calvert Cliffs during the weeks of August 2 and 9, 2010.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 4,2010. The written examinations, operating tests, and the supporting reference materials identified in Attachment 3 of ES-201 will be due by June 3, 2010. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OM B) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination
G. Gellrich 2 date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams. html.
Thank you for your cooperation in this matter. Mr. C. Jones has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's exaniination procedures and guidelines, please contact Mr. P. Presby at (610) 337-5392, or me at (610) 337-5046.
Sincerely, Samuel L. sell, Jr., Chief Operations Branch Division of Reactor Safety Docket Nos. 50-317, 50-318 cc: Distribution via ListServ William C. Holston, Manager, Nuclear Training
G. Gellrich 2 date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. C. Jones has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. P. Presby at (610) 337-5392, or me at (610) 337-5046.
Sincerely, IRA Darrell Roberts forI Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket Nos. 50-317, 50-318 cc: Distribution via ListServ William C. Holston, Manager, Nuclear Training SUNSI Review Complete: PP (Reviewer's Initials)
ADAMS PKG: ML100560028 ADAMS NO.: ML100920504 DOCUMENT NAME: G:\DRS\Operations Branch\PRESBy\Exam FY10-CC Aug 10(U01770)\ExamNotificationLtr.doc A fter declaring this document "An 0 ffilcial A ency Record," it will be released to the Public.
OFFICE RI/DRS/OB I RI/DRS/OB I RI/DRS/OB I I I NAME CJBixler/CJB PPresby/PP SHansell/DJR DATE 04/02/10 04/02/10 412/10 OFFICIAL RECORD COPY
G. Gellrich 3 Distribution: (via E-mail) -
S. Collins, RA (R10RAMAIL RESOURCE)
M. Dapas, DRA (R10RAMAIL RESOURCE)
D. Lew, DRP (R1 DRPMAIL RESOURCE)
J. Clifford, DRP (R1 DRPMAIL RESOURCE)
D. Roberts, DRS (R1DRSMaii RESOURCE)
P. Wilson, DRS (R1DRSMaii RESOURCE)
L. Trocine, RI OEDO G. Dentel, DRP N. Perry, DRP J. Hawkins, DRP S. Sloan, DRP S. Kennedy, DRP, SRI C. Newgent, DRP, Resident OA RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1-1 Resource ROPreportsResource@nrc.gov J. White, INPO (whitejl@lnpo.org)
S. Glenn, INPO (GlennSG@lnpo.org)
Distribution via hard copy:
P. Presby, Chief Examiner, DRS DRS Master Exam File (C. Bixler) (w/concurrences)
DRS File