Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Return an Instrument to Service (FT-464)

JPM NUMBER: PBN JPM P012.001d.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P012.001.COT Place Reactor Protection Channels in the Tripped TASK TITLE(S): Condition K/A NUMBERS: 012 A4.04 (3.3/3.3)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: No Alternate Path:

TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P012.001d.COT JPM

Title:

Return an Instrument to Service Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is in Mode 1.
  • 1FT-464 Red Steam Flow Instrument was removed from service for repairs per 0-SOP-IC-001 Red, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor from Service - Red Channels.
  • You are the 4th Control Operator on shift.
  • The Operator at the controls will acknowledge any alarms.

INITIATING CUES (IF APPLICABLE):

  • The OS1 has directed you to return 1FT-464 to service per 0-SOP-IC-001 Red, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor from Service - Red Channels, step 5.2.4, and establish AUTO operation of related components.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: 0-SOP-IC-001 Red, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor From Service-Red, partially completed for instrument removal and restoration.

General

References:

0-SOP-IC-001 Red, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor From Service - Red Channels Rev. 6 Task Standards: Instrument returned to service and controls in automatic Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Complete the Return to Service section of Attachment A Critical Y In cabinet C-112, place the following bistable trip switches to NORMAL (toggle switch down) AND check expected response.

BISTABLE SWITCH BISTABLE LAMP

  • High Trip HI STM FLO LINE A FC464A
  • Hi Hi Trip HI HI STM FLO LINE A FC464B
  • SF<FWF NONE
  • SF>FWF STM FW FLOW DEV FC466C Standard: Bistable switches placed in NORMAL and response verified.

Evaluator Note:

  • Checking expected responses is NOT critical.
  • Restoring each bistable is a critical step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Place HC-466, SG A Main Feed Reg Valve Controller in "MANUAL".

Critical N Standard: Controller HC-466 placed in Manual Evaluator Cue: If, asked shift supervision directs transfer switches to be returned to Red Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Place S/G A Steam Flow Control Transfer Switch to 464 (RED).

Critical Y Standard: Steam Flow Control Transfer Switch placed in 464 (RED).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Place S/G A Feedwater Flow Control Transfer Switch to 466 (RED).

Critical Y Standard: Feedwater Flow Control Transfer Switch placed in 466 (RED).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 5 Place HC-466, SG A Main Feed Reg Valve Controller in Critical Y "AUTO", unless directed otherwise by the Shift Manager.

Standard: Controller HC-466 placed in Auto Evaluator Note: This step is critical if controller previously placed in manual.

Evaluator Cue: If asked, Shift Manager directs controller returned to Auto Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Return to scan PPCS point ID FT464V, SG A-1 SF RED.

Critical N Standard: PPCS point returned to Scan Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Inform Shift Manger that the affected channel has been returned to service Critical N Standard: Inform Shift Manager that channel has been returned to service Evaluator Cue: Acknowledge report that channel has been returned to service.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

From IC-2 or any at power IC Remove 1FT-464 red Channel S/G Steam flow from service per SOP-IC-001-RED Snap JPM IC for use For each performance of JPM, remove point FT464V from scan on PPCS and enter a different PPCS point on the drop used.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 is in Mode 1.
  • 1FT-464 Red Steam Flow Instrument was removed from service for repairs per 0-SOP-IC-001 Red, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor from Service - Red Channels.
  • You are the 4th Control Operator on shift.
  • The Operator at the controls will acknowledge any alarms.

INITIATING CUES (IF APPLICABLE):

  • The OS1 has directed you to return 1FT-464 to service per 0-SOP-IC-001 Red, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor from Service - Red Channels, step 5.2.4, and establish AUTO operation of related components.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Perform a Pressurizer Heater Group Input Test Calculation JPM NUMBER: PBN JPM P010.004.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P010.004.COT Monitor the pressurizer pressure control system for proper TASK TITLE(S): operation.

K/A NUMBERS: Generic 2.1.25 (2.8/3.1)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other: X Lab:

Time for Completion: 15 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P010.004.COT JPM

Title:

Perform a Pressurizer Heater Group Input Test Calculation Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 CO.
  • Unit 1 is currently in Mode 2 with a reactor startup in progress.
  • Pressurizer Heater Group 1T-1C failed on the previous shift.
  • Engineering has determined that a potential common mode failure exists (applicable only to Unit 1), and has recommended that TS 43, Pressurizer Heater Group Energy Input Test, be performed on Unit 1 Pressurizer Heater Group 1T-1D in order to verify its operability.
  • The test is in progress, voltage and current readings have been taken by maintenance, and the procedure is complete up to and including step 5.2.10.

INITIATING CUES (IF APPLICABLE):

  • You are to complete section 5.2 (1T-1D Pressurizer Heater Group Test) of TS-43 beginning at step 5.2.11.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: TS 43, Pressurizer Heater Group Energy Input Test, section 5.2 complete through step 5.2.10 Calculator General

References:

TS 43, Pressurizer Heater Group Energy Input Test (Quarterly), Rev 7 Task Standards: Pressurizer Heater Group 1T-1D is identified as NOT meeting its Technical Specification requirement of 100 kW.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Calculate the average voltage and average current for each breaker.

Critical N Standard: Average voltage and average current is calculated and recorded in Table PP-13 1T-1D. (see attached table for correct values)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Calculate the power for each breaker using provided formula.

Critical N Standard: Power for each breaker is calculated and recorded in Table PP-13 1T-1D.

Breaker 1 2 3 4 5 Power in KW 20.7 19.8 20.4 20.4 20.7 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Sum the Total power as follows:

Critical N _____ + _____ + _____ + _____ + _____ = _______ in KW BKR# 1 2 3 4 5 TOTAL Standard: Power of each breaker is added together to determine total power of Pressurizer Heater Group 1T-1D.

Total power should be 102 KW Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Multiply by uncertainty factor of 0.9335 as follows.

Critical Y Total Power in KW ________ x 0.9335 = ____________ KW and record result in section 6.0 Acceptance Criteria Standard: The total power of the heater Group obtained in the previous step is multiplied by 0.9335 and recorded in section 6.0. Final value is 95.2 (+/- 2.0 kW).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 5 The total power of Pressurizer Heater Group 1T-1D is compared with the Critical Y Technical Specification Acceptance Criteria.

Standard: Total power of Pressurizer Heater Group 1T-1D is determined to NOT meet Technical Specification requirements of 100 kW.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Independently Review the calculations for steps 5.2.10, 5.2.11, 5.2.12, and 5.2.13 Critical N to verify accuracy.

Standard: Examinee asks for an Independent Verification of calculation Evaluator Cue: Sign the step to indicate that an Independent Verification as performed Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 IF using TS-43(Unit 2).xls Spreadsheet to calculate data, Critical N Standard: This step should be marked N/A Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Fill in the table in TS 43 section 5.2 as follows:

PP-13 1T-1D BREAKER 1 2 3 4 5 VOLTAGE A-B 486.5 486.5 486.5 486.4 486.4 A-C 486.2 486.4 486.3 486.3 486.3 B-C 488.8 488.8 488.7 488.7 488.6 AVERAGE *487.2 *487.2 *487.2 *487.1 *487.1 CURRENT A 24.2 23.6 23.8 24.2 25.0 B 24.8 23.9 24.5 24.2 24.1 C 24.4 23.1 24.2 24.1 24.5 AVERAGE *24.5 *23.5 *24.2 *24.2 *24.5 POWER in KW *20.67 *19.83 *20.42 *20.42 *20.67

  • DO NOT record these values on the paper work submitted to the candidate, they will calculate these values.

5.2.6 Record Test Instruments used.

ID No. MCCP-12 Cal. date Today ID No. MCMM-37 Cal. date Today Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 CO.
  • Unit 1 is currently in Mode 2 with a reactor startup in progress.
  • Pressurizer Heater Group 1T-1C failed on the previous shift.
  • Engineering has determined that a potential common mode failure exists (applicable only to Unit 1), and has recommended that TS 43, Pressurizer Heater Group Energy Input Test, be performed on Unit 1 Pressurizer Heater Group 1T-1D in order to verify its operability.
  • The test is in progress, voltage and current readings have been taken by maintenance, and the procedure is complete up to and including step 5.2.10.

INITIATING CUES (IF APPLICABLE):

  • You are to complete section 5.2 (1T-1D Pressurizer Heater Group Test) of TS-43 beginning at step 5.2.11.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Approve a Clearance Order JPM NUMBER: PBN JPM SHE 119 002a REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN SHE 119 002 Approve a Clearance Order TASK TITLE(S):

K/A NUMBERS: Generic 2.2.13 (4.1/4.3)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room: X LOCATION:

Simulator: X Other: X Lab:

Time for Completion: 20 Minutes Time Critical: No Alternate Path: Yes TASK APPLICABILITY: SRO: X RO: NLO Additional signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM SHE 119 002a JPM

Title:

Approve a Clearance Order Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the relief crew SRO assigned to the Work Control Center. 2P-2C, Unit 2 Charging Pump, needs to be isolated and danger tagged per OI-50, Charging Pump Isolation, due to excessive seal leakage.
  • A Master Clearance Order has been backgrounded to use as a guide in preparing the Danger Tag Series.

INITIATING CUES (IF APPLICABLE):

  • You are to review the Clearance Order provided for adequacy.
  • If the Clearance Order is satisfactory, then approve the Clearance Order.
  • If the Clearance Order in NOT adequate, then identify changes that need to be made prior to approval.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: 2P-2C Clearance Order as provided.

General

References:

NP 1.9.15, Tagging Procedure OI-50, Charging Pump Isolation Master Data Book Drawing WEST 684J741 sh.2 CVCS Westinghouse Elementary Drawings.

Task Standards: Clearance Order is reviewed and the three errors noted in this JPM are identified.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Obtain and review references as needed to determine tag series adequacy.

Critical N (SEQ-1)

Standard: References (as indicated on clearance order coversheet) are obtained and reviewed as needed.

Evaluator Note: The examiner should keep the examinee focused on the tag series review using available references (i.e. plant walk-down, review of requesting individual documentation and review of specific tags is not necessary, etc.)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Determine if specified clearance order boundaries are adequate for worker safety Critical Y (SEQ-1) and scope of work.

Standard: Breaker for 2P-2C determined to be incorrect, breaker should be 2B52-28A.

Evaluator Note: Incorrect breaker listed on clearance order checklist, 2B52-37A is for Charging Pump 2P-2A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Determine if specified clearance order boundaries are adequate for worker safety Critical Y (SEQ-1) and scope of work.

Standard: CV-399, P-2C Charging Pump Suction has the wrong unit designator. 1CV-399 is selected vice 2CV-399.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Determine if clearance order boundaries are adequate for worker safety and scope Critical Y (SEQ-1) of work.

Standard: Drain valve 2CV-262C, 2P-2C Chg Pump Discharge Header Drain First Off Isol, is identified as being SHUT on the clearance order checklist. 2CV-262C should be listed as OPEN.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee indicates that all deficiencies have been identified OR indicates the Clearance Order is adequate, the JPM may be terminated.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Historical Record:

Rev 0: Developed for the ILT 2009 NRC Exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the relief crew SRO assigned to the Work Control Center. 2P-2C, Unit 2 Charging Pump, needs to be isolated and danger tagged per OI-50, Charging Pump Isolation, due to excessive seal leakage.
  • A Master Clearance Order has been backgrounded to use as a guide in preparing the Danger Tag Series.

INITIATING CUES (IF APPLICABLE):

  • You are to review the Clearance Order provided for adequacy.
  • If the Clearance Order is satisfactory, then approve the Clearance Order.
  • If the Clearance Order in NOT adequate, then identify changes that need to be made prior to approval.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: PERFORM RCS LEAK RATE DETERMINATION JPM NUMBER: PBN JPM P002.005aCOT REV. 2 RELATED PRA None INFORMATION:

TASK NUMBERS / P002.005.COT PERFORM RCS LEAK RATE DETERMINATION TASK TITLE(S):

K/A NUMBERS: 009 EA 2.33 (3.3/3.8)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room: X LOCATION:

Simulator: Other: X Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: JPM P002.005aCOT JPM

Title:

PERFORM RCS LEAK RATE DETERMINATION Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is operating at rated power with indications of a primary leak.
  • Unit 1 LDGS is operating normally with controls in AUTO.
  • 1P-2C Charging Pump has pre-identified leakage of 0.20 gpm.
  • The following plant parameters were observed at time 0400 minutes:
  • RCS Tavg 569.8 °F
  • RCS T(Terr) 0 °F
  • PZR Level 46.5 %
  • VCT Level 45 %
  • U1 LDGS level 66
  • The following plant parameters were observed at time 0420 minutes:
  • RCS Tavg 569.8 °F
  • RCS T(Terr) 0 °F
  • PZR Level 46.0 %
  • VCT Level 43.5 %
  • U1 LDGS level 66
  • U1 RCDT Level 52.5 %
  • No borations or dilutions took place.
  • There is no Chemistry sampling in progress.

INITIATING CUES (IF APPLICABLE):

  • OS1 directs you to perform OI-55, Primary Leak Rate Calculation per step 21 of AOP-1A Unit 1 Reactor Coolant Leak.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: OI-55, Primary Leak Rate Calculation.

Calculator General

References:

OI-55, Primary Leak Rate Calculation, Rev 22.

Technical Specifications Task Standards: Calculate RCS leakage per OI-55.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 5.4 IF the Unit is in Mode 1, 2, 3, or 4, THEN determine RCS Leak Rate as Critical N follows:

5.4.1 Record initial set of parameter readings on Attachment A, Primary Leak Rate Worksheet or PBF-2131(2132) Control Room Miscellaneous Shift Log.

Standard: Determine the Unit is in Mode 1 per turnover sheet.

Evaluator Note: If the trainee asks, the leak rate should be completed on Attachment A of OI-55, not PBF-2131(2132)

No action is required for procedure step 5.4.2 because the parameter readings are given.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 5.4.3 Using the same instrumentation channels for the first set of readings, record Critical N second set of parameter readings when T (error) meter is the same as in initial data set.

Standard: None, the second set of data is given to the trainees on turnover.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 5.4.4 IF dilution OR boration took place, THEN correct the leak rate by using the Critical N different totalizer readings. This step does not apply to PBF-2131(2132)

Standard: Determine no dilution or boration took place.

Evaluator Cue: If asked, per turnover inform trainee that no boration or dilution occurred.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 5.4.5 IF operator timed manual full divert was used, THEN calculate the number Critical N of gallons diverted by multiplying the letdown flow in gpm times minutes diverted.

This step does not apply to PBF-2131(2132)

Standard: Determine no divert took place.

Evaluator Cue: If asked, inform trainee that no diverts took place.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 5 5.4.6 Calculate AND record leak rate.

Critical N Standard: Calculate leak rate per Attachment A and record results.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 On Attachment A step 1.1 verify Reactor Power Stable.

Critical N Standard: Verify Reactor Power Stable.

Evaluator Note: Per turnover sheet, Reactor Power has not changed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 On Attachment A step 1.2 record data for LDGS:

Critical N 1. The LDGS is operating normally with controls in AUTO AND with no level adjustments being made

2. The LDGS is bypassed per OI-17, LDGS Operation Standard: Determine LDGS operation and level normal per turnover sheet.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 8 On Attachment A Record data in step 2.0 from turnover sheet.

Critical Y 1. Time change 20 minutes

2. RC Tavg change is zero (0).
3. RC T(Terr) change is zero (0).
4. PZR Level change is .5 % or 32.45 gal.
5. VCT Level change is 1.5 % or 19.5 gal.
6. Stripper Level change is zero (0).
7. RCDT Level change is .5 % or 1.75 gal.

Standard: Record data accurately from the turnover sheet and calculate the RCS leak rate.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 On Attachment A record data in step 3.0 RMW and BA additions Critical N Standard: n/a this step as it does not apply Evaluator Note: Per previous data given to trainee, no RMW or acid additions occurred.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 On Attachment A record data in step 4.0 divert.

Critical N Standard: n/a this step as it does not apply Evaluator Note: Per previous data given to trainee, no diverts occurred.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 11 On Attachment A calculate RCS leak rate in step 5.0 Critical Y Standard: Calculate RCS leak rate of 2.50 to 2.70 gpm given turnover data.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Attachment A step 6.0 Critical Y IF RCS leak rate is greater than 0.15 gpm, THEN perform the following:

6.1 Calculate RCDT leak rate:

Standard: Calculated RCDT leak rate per section 6.0 to be .08 to .10 gpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Attachment A step 6.2 Critical Y Measure AND record below any identified component leakage that is NOT Pressure Boundary Leakage.

Standard: Record identified component leak rate for 1P-2C charging pump.

Evaluator Note: 1P-2C Charging pump has 0.20 gpm identified leakage as stated in initial conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 14 Attachment A step 6.3 Critical Y Calculate Identified Leakage Standard: Add the RCDT leak rate to the sum of the identified component leak rates to obtain Identified Leakage. Calculate RCS identified leakage to be .28 to .30 gpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Attachment A step 6.4 Critical Y Calculate Unidentified Leakage Standard: Subtract Identified leakage from the RCS leak rate to obtain Unidentified Leakage.

Calculate RCS unidentified leakage to be 2.20 to 2.42 gpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 16 Attachment A step 7.0 Critical N Primary Leak Rate calculation completed Standard: Attachment A signed off that calculation was completed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 17 Attachment A step 8.0 Critical N Independent verification of calculation completed.

Standard: Independent verification of calculation requested.

Evaluator Note: Evaluator should sign as the IV check to satisfy procedural usage requirements.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 5.5 IF the Unit is in Mode 5, THEN perform Attachment B, Cold Shutdown Critical N Primary Leak Rate Worksheet as follows:

Standard: Examinee should determine this step is not applicable.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 19 5.6 IF the plant is in Mode 1 through 4, AND Pressure Boundary leakage is Critical N detected, THEN enter Technical Specification LCO 3.4.13 Action Condition B.

Standard: Examinee should determine that action condition entry is not required at this time.

Evaluator Cue: Relief crew is preparing for a containment entry to inspect for pressure boundary leakage.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 10 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 20 5.7 IF the RCS leak rate approaches 0.20 gpm and the cause is known, Critical N THEN the priority of the work order associated with the contributor shall be increased.

Standard: Examinee should determine that this step is not applicable.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 21 5.8 IF RCS Unidentified leakage shows a significantly increasing trend, Critical N OR reaches 0.15 gpm, THEN perform the following actions:

  • Inform the Shift Manager and DCS.
  • Check the following at least once per hour:

o Containment particulate monitor (RE 211) high and low values.

o Containment radiogas monitor (RE 212) high and low values.

o Containment humidity.

  • Perform the RCS leakrate calculation of Section 5.4 OR 5.5 as applicable at least once per shift.
  • Obtain a sump A sample and have Chemistry analyze to aid in determining the source of leakage.
  • Direct Chemistry to sample and analyze Containment atmosphere for hydrogen content AND report the results to the SM.
  • IF a containment inspection is warranted to localize the source of leakage, THEN the inspection should consist of the following:

o Evidence of steam in containment.

o Wetness on the floor.

o Boric Acid deposits.

o Abnormal packing or gasket leakage.

o Reactor vessel head locations as permitted by Health Physics.

Standard: Examinee identifies actions required as listed by procedure Evaluator Cue: Shift Manager will have OS 2 address actions contained in step 5.8 Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 11 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 22 5.9 IF RCS leak rate is greater than 0.20 gpm, THEN perform the following on Critical N using Attachment A or B as appropriate:

Standard: This step has already been completed as a part of attachment A Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 23 5.10 IF the plant is in Mode 1 through 4, AND Unidentified Leakage exceeds one Critical Y gpm, THEN enter Technical Specification LCO 3.4.13 Action Condition.

Standard: Identify RCS unidentified leakage >1 gpm is in excess of limit for Technical Specifications LCO 3.4.13.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 12 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

THIS IS A KEY DO NOT HAND OUT ATTACHMENT A PRIMARY LEAK RATE WORKSHEET UNIT ______________ DATE ______________

NOTE: Normally, no system dilution, boration, or divert to holdup tank should take place. However, if required, blender totalizers and operator timed manual full divert can account for these operations. Positive leak rates indicate leakage from the RCS.

NOTE: VCT Level is taken at the same point in the level cycle when the LDGS is on-line to provide as accurate of a leak rate as possible.

INITIALS 1.0 Monitor AND maintain the following during the performance of this test:

1.1 Reactor Power is stable.

1.2 The Letdown Gas Stripper (LDGS) meets ONE of the following:

1.2.1 The LDGS is operating normally with control in AUTO AND with no level adjustments being made.

1.2.2 The LDGS is bypassed per OI-17, Letdown Gas Stripped Operation.

NOTE: Final and Initial values of Terr must be equal.

2.0 Record the following data:

RCS LEAK RATE DATA Parameter Initial Final Formula Result Time (T) min 0 20 TF TI = T 20 min RC Tavg (Tavg) 569.8 °F 569.8 °F TavgI TavgF = Tavg 0 °F RC Terror (Terr) 0 °F 0 °F TerrI TerrF = Terr 0 °F Pzr Level (PZR) 46.5 % 46 % (PZRI PZRF ) 64.9 = PZRgal 32.45gal VCT Level (VCT) 45 % 43.5 % (VCTI VCTF ) 13 = VCTgal 19.5 gal Stripper Level (STP) 66 in 66 in (STPI STPF) 17 = STPgal 0 gal (RCDTF RCDTI ) 3.5 =

RCDT Level (RCDT) 52 % 52.5 % 1.75 gal RCDTgal Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 13 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

THIS IS A KEY DO NOT HAND OUT ATTACHMENT A PRIMARY LEAK RATE WORKSHEET 3.0 IF RMW or BA additions are made during test period, THEN record the following data:

RMW AND BA ADDITIONS Time of Addition Gallons Added gal gal gal Total Gallons Added (MUgal): 0 gal 4.0 IF divert to holdup tank is performed during test period, THEN record the following data:

DIVERT Time of Divert Flow Rate (DF) Divert Duration (DT) Formula Gallons Diverted (DV)

DF x DT = gal gpm min DV DF x DT = gal gpm min DV DF x DT = gal gpm min DV Total Gallons Diverted (Dgal): 0 gal 5.0 Calculate RCS leak rate:

CALCULATED RCS LEAK RATE Parameter Formula Leak Rate RCS Leak Rate (LRRCS) (PZRgal + VCTgal + STPgal + MUgal Dgal ) ÷ T = LRRCS 2.50-2.70 gpm 6.0 IF RCS Leak Rate is greater than 0.15 gpm, THEN perform the following:

6.1 Calculate RCDT leak rate:

CALCULATED RCDT LEAK RATE Parameter Formula RCDT Leak Rate RCDT Leak Rate (LRRCDT) RCDTgal ÷ T = .08-.10 gpm LRRCDT Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 14 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

THIS IS A KEY DO NOT HAND OUT ATTACHMENT A PRIMARY LEAK RATE WORKSHEET 6.2 Measure AND record below any identified component leakage that is NOT Pressure Boundary Leakage:

COMPONENT LEAK RATE Component Leak Rate Unit 1 P-2C Charging Pump 0.20 gpm gpm gpm gpm Total Component Leakage (LRC): 0.20 gpm 6.3 Calculate Identified Leakage:

RCS IDENTIFIED LEAKAGE Parameter Formula Identified Leakage LRRCDT + LRC =

RCS Identified Leakage (LRID) .28 to 0.30 gpm LRID 6.4 Calculate Unidentified Leakage:

RCS UNIDENTIFIED LEAKAGE Parameter Formula Unidentified Leakage RCS Unidentified Leakage LRRCS - LRID =

2.20 to 2.42 gpm (LRUID) LRUID 7.0 Primary Leak Rate calculation completed.

8.0 Independent Verification of calculations completed.

IV Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 15 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 is operating at rated power with indications of a primary leak.
  • Unit 1 LDGS is operating normally with controls in AUTO.
  • 1P-2C Charging Pump has pre-identified leakage of 0.20 gpm.
  • The following plant parameters were observed at time 0 minutes:
  • RCS Tavg 569.8 °F
  • RCS T(Terr) 0 °F
  • PZR Level 46.5 %
  • VCT Level 45 %
  • U1 LDGS level 66
  • The following plant parameters were observed at time 20 minutes:
  • RCS Tavg 569.8 °F
  • RCS T(Terr) 0 °F
  • PZR Level 46.0 %
  • VCT Level 43.5 %
  • U1 LDGS level 66
  • U1 RCDT Level 52.5 %
  • No borations or dilutions took place.

INITIATING CUES (IF APPLICABLE):

  • OS1 directs you to perform OI-55, Primary Leak Rate Calculation per step 21 of AOP-1A Unit 1 Reactor Coolant Leak.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 16 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 17 of 17

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: REMOVE AN RMS CHANNEL FROM SERVICE JPM NUMBER: PBN JPM P119.903.SRO REV. 0 RELATED PRA INFORMATION:

TASK NUMBERS / P119.903.SRO Evaluate RMS abnormalities TASK TITLE(S):

K/A NUMBERS: 2.3.13 (3.4/3.8)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other: X Lab:

Time for Completion: 30 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN P119.903.SRO JPM

Title:

REMOVE AN RMS CHANNEL FROM SERVICE Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 OS with the plant operating in Mode 1.
  • RE-225 Combined Air Ejector and RE-214 Auxiliary Building Vent stack have been removed from service due to a DAM 7 failure.
  • RE-315 ABVS Exhaust SPING Low Range Gas Channel has been removed from service due to a sample pump failure
  • The 3rd RO just reported that 1RE-215 Condenser Air Ejector Gas Monitor Unit 1 has failed high.

INITIATING CUES (IF APPLICABLE):

  • The Shift Manager has directed you to remove 1RE-215 from service per PBF-2068g 1RE-215.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: PBF-2068g 1RE-215 Unit 1 Stream Air Ejector PBF-2068g RE-315 ABVS Exhaust SPING low range Gas filled out for being removed from service.

PBF-2068g RE-214 PAB Vent Stack filled out for being removed from service PBF-2068g RE-225 Combined Air Ejector filled out for being removed from service General

References:

RMSASRBs CAMP 014 Steam Generator Tube Leak Calculation TRM 3.3.1 Instrumentation TS 3.4.13 RCS Operational Leakage NP 3.2.4 Primary to Secondary Leak Rate Monitoring Program Radiological Effluent Control Manual (RECM)

Task Standards: Remove 1RE-215 Condenser Air Ejector Gas Monitor Unit 1 from service per PBF-2068g 1RE-215.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Determine Channel Number.

Critical N Standard: Verify correct channel number on PBF-2068g. [1RE-215 (3-5)]

Evaluator Note: Completed PBF-2068gs for 1RE-315, RE-214 and RE-225 should be made available for review if asked for during the remainder of this JPM.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Determine Channel Name/Location.

Critical N Standard: Verify correct Channel Name/Location on PBF-2068g. (Unit 1 Steam Air Ejector/

44 El. Unit 1 Turbine Hall)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Standard:

Performance Step: 3 Determine if TS, RECM, or E-Plan applicable.

Critical N Standard: Verify TS, RECM and E-Plan applicable for 1RE-215.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Determine applicable sections of TS, RECM or E-Plan.

Critical N Standard: Verify listed references on PBF-2068g 1RE-215.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 5 Determine redundant channel or compensatory action required.

Critical N Standard: Determine redundant channels and compensatory measures are required.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 If required, then list below (otherwise mark N/A)

Critical Y Standard:

  • Determine Chemistry needs sample and analyze Unit 1 S/Gs within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per CAMP014.

Evaluator Cue: If asked, current primary to secondary leakage is 0.01 gpd Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 If required, then list below (otherwise mark N/A)

Critical Y Standard: Determine grab samples once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> per RECM Note 6 for table 3-2.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 6 If required, then list below (otherwise mark N/A)

Critical Y Standard: TLCO 3.3.1 not met. TRMAC 3.3.1.A and TRMAC 3.3.1.D entered to determine Secondary Gross activity once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Determine time channel may be out of service.

Critical N Standard: Verify 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is the most time limiting requirement for taking 1RE-215 OOS.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Name(s) of Chem and/or RP supervision contacted.

Critical Y Standard: List names of contacted personnel from RP and Chemistry.

Evaluator Note: The critical portion of this step is to contact Chemistry if not already done previously.

Evaluator Cue: Shift Chemistry Technician has been notified.

Shift RP Technician has been notified.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 9 If required, notify Regulatory Affairs of potential Reportability requirements.

Critical N Standard: List name of Regulatory Affairs person notified.

Evaluator Cue: The on call Regulatory Affairs person has been contacted.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Name(s) of Emergency Plan staff contacted (at earliest convenience):

Critical N Standard: List names of contacted personnel from E-Plan.

Evaluator Cue: The on call Emergency Plan staff person has been notified.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 SM authorization to remove the channel from service or acknowledgment that the Critical N channel has failed:

Standard: Have Shift Manager acknowledge that 1RE-215 has failed.

Evaluator Note: The examinee may request the SM initials to be filled out. Initial the block as the SM in order to complete the JPM.

Evaluator Cue: Shift Manager acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 12 Channel placed into Maintenance or other mode:

Critical N Standard: 1RE-215 placed in maintenance.

Evaluator Cue: If asked, the RO has place 1RE-215 in maintenance.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Reason the channel was removed from service (circle one):

Critical N Standard: 1RE-215 failure circled.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Historical Record:

Rev 0: Developed for the ILT 2009 NRC exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 10 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 OS with the unit operating in Mode 1.
  • RE-225 Combined Air Ejector and RE-214 Auxiliary Building Vent stack have been removed from service due to a DAM 7 failure.
  • RE-315 ABVS Exhaust SPING Low Range Gas Channel has been removed from service due to a sample pump failure
  • The 3rd RO just reported that 1RE-215 Condenser Air Ejector Gas Monitor Unit 1 has failed high.

INITIATING CUES (IF APPLICABLE):

  • The Shift Manager has directed you to remove 1RE-215 from service per PBF-2068g 1RE-215.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 11 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 12 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: SUPPLY THE TSC WITH EMERGENCY POWER JPM NUMBER: PBN JPM P000.009aCOT REV. 1 RELATED PRA None INFORMATION:

TASK NUMBERS / P000.009.COT / SUPPLY THE TSC WITH EMERGENCY POWER TASK TITLE(S):

K/A NUMBERS: Gen - 2.4.29 (3.1/4.4)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION In-Plant: X Control Room:

LOCATION:

Simulator: Other:

Lab:

Time for Completion: 15 Minutes Time Critical: No Alternate Path: No TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by: Tom Larson Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P000.009COT JPM

Title:

SUPPLY THE TSC WITH EMERGENCY POWER Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

You are a licensed operator called in to support the on-shift operations crew. A serious plant transient has occurred, resulting in the following conditions:

  • 13.8 kV AC buses H01 and H02 are de-energized.
  • 4.16 kV and 480 VAC buses 1A01/1B01 and 1A02/1B02 are de-energized.
  • The G501 diesel generator ("Dinky Diesel") is currently running and supplying the G05 gas turbine auxiliaries.
  • Because of the failure (fault) associated with the 13.8 kV H01 bus, the G05 Gas Turbine cannot be used and is NOT running.
  • An Unusual Event emergency classification has been declared by the Shift Manager.
  • Additional ERO resources have been called in for support, however, the TSC currently has no power.

INITIATING CUES (IF APPLICABLE):

The Shift Manager has requested that you supply the TSC with emergency power per EPIP 4.1, Attachment C.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: EPIP 4.1, Technical Support Center (TSC) Activation and Evacuation General

References:

EPIP 4.1, Technical Support Center (TSC) Activation and Evacuation, Rev. 37 Task Standards: Breakers are re-aligned to supply the TSC with emergency power per EPIP 4.1, Technical Support Center (TSC) Activation and Evaluation, Rev. 37 Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Attachment C of EPIP 4.1 reviewed, applicable section/steps needed to perform Critical N task determined.

Standard: Section 2.0 "Operation" determined to be the appropriate section of Attachment C to perform.

Evaluator Cue: If examinee expresses concern with the third CAUTION (directly above Step 2.1.1), indicate that supervision is generating a tag series to ensure both breakers will not be closed simultaneously.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Place breaker 52T control switch to open.

Critical N Standard: Breaker 52T control switch placed in the open position.

Evaluator Note: Both indicating lights are off for breaker 52T since the switch is not in the circuit with the Auto/Manual selector switch in the Auto position.

Evaluator Cue: Breaker 52T control switch is in the open position, the green and red indicating lights are off.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 The Auto/Manual selector switch must be placed to MANUAL.

Critical Y Standard: Auto/Manual selector switch on panel H-507 is placed in MANUAL.

Evaluator Cue: The Auto/Manual selector switch is in MANUAL, green light is lit for breaker 52T.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 4 Breaker (52E) to G05 auxiliaries OPENED locally via its control switch.

Critical Y Standard: Breaker 52E is locally opened using its control switch on panel H-507.

Evaluator Note: Actual plant conditions will be different than the initial cue for this step.

Evaluator Cue:

  • Red light is lit above breaker 52E (prior to opening breaker).
  • After breaker is opened with switch, green light is lit above breaker 52E.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Breaker (52T) TSC loads, CLOSED locally via its control switch.

Critical Y Standard: Breaker 52T is closed locally by placing its control switch in the closed position.

Evaluator Cue: Red light is lit above control switch for breaker 52T.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 6 Recognize the fuel supply limitation for the G501 diesel generator (Step 2.2).

Critical N Standard: An approximate 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fuel supply is determined to exist unless a manual fill is performed.

Evaluator Cue: The 13.8 kV bus H01 is expected to be restored in approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (manual fill is not necessary).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Shift Manager is notified that Attachment C of EPIP 4.1 is complete.

Critical N Standard: Shift Manger contacted and notified of Attachment C status.

Evaluator Cue: The Shift Manager acknowledges the report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: THIS COMPLETES THE JPM.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

You are a licensed operator called in to support the on-shift operations crew. A serious plant transient has occurred, resulting in the following conditions:

  • 13.8 kV AC buses H01 and H02 are de-energized.
  • 4.16 kV and 480 VAC buses 1A01/1B01 and 1A02/1B02 are de-energized.
  • The G501 diesel generator ("Dinky Diesel") is currently running and supplying the G05 gas turbine auxiliaries.
  • Because of the failure (fault) associated with the 13.8 kV H01 bus, the G05 Gas Turbine cannot be used and is NOT running.
  • An Unusual Event emergency classification has been declared by the Shift Manager.
  • Additional ERO resources have been called in for support, however, the TSC currently has no power.

INITIATING CUES (IF APPLICABLE):

The Shift Manager has requested that you supply the TSC with emergency power per EPIP 4.1, Attachment C.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: PERFORM REQUIRED NOTIFICATIONS JPM NUMBER: PBN JPM P119.214aSRO REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / P119.214.SRO / PERFORM REQUIRED NOTIFICATIONS TASK TITLE(S):

K/A NUMBERS: 2.4.29 (3.1/4.4) 2.4.40 (2.7/4.5)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other: X Lab:

Time for Completion: 15 Minutes Time Critical: Yes Alternate Path: No TASK APPLICABILITY: SRO: RO: NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: JPM P119.214aSRO JPM

Title:

PERFORM REQUIRED NOTIFICATIONS Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are participating in an ERO Team Training Drill. The following conditions exist in the Simulator.
  • Unit 1 and Unit 2 were operating at 100% normal steady-state conditions.
  • An RCS leak occurred inside containment on Unit 1 which led to trip criteria per the AOPs.
  • Shift management ordered a Unit 1 trip at 0800.
  • The RO tried to trip the reactor manually with both sets of pushbuttons unsuccessfully.
  • The RO tried to de-energize 1B01 and 1B02 480 VAC busses unsuccessfully.
  • An AO has been dispatched to open the Unit 1 reactor trip breakers locally.
  • An automatic Safety Injection has occurred on low Pressurizer pressure.
  • The Crew is responding in accordance with the Critical Safety Procedures (CSPs).

It is 0812 and the Shift Manager has just declared a Site Area Emergency classification in accordance with EAL SS2.1, Failure of Reactor Protection System Instrumentation to Complete or Initiate an Automatic Reactor Trip Once a Reactor Protection System Setpoint Has Been Exceeded and Manual Trip Was NOT Successful.

PPCS page 2726 indicates the following:

Wind Speed 12.6 MPH Wind Direction 303.2 DEGREES Stability Class D Lake Breeze NO INITIATING CUES (IF APPLICABLE):

  • The Shift Manager (Emergency Director) has directed you to complete the Nuclear Accident Reporting System Form (NARS) through, and including Box 11 and return the form to him for his authorization signature per EPIP 1.1, Course of Actions, Section 10.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

This JPM is time critical.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: EPIP 1.1, Course of Actions.

General

References:

EPIP 1.1, Course of Actions, Section 10, Nuclear Accident Reporting System Form (NARS)

Task Standards: EPIP 1.1, Course of Actions, Section 10, Nuclear Accident Reporting System Form (NARS), Boxes 1 through 11 and returns it to the Shift Manager (Emergency Director) in less than or equal to 15 minutes.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Fill out heading.

Critical N Standard: Examinee circles CR Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Box 1 Reason For Call Critical Y Standard: The Examinee checks Initial Report box Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 3 Box 2 Status Critical Y Standard: The Examinee checks the [B] Drill / Exercise Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Box 3 Affected Station Critical N Standard: The Examine ensures that the [B] Point Beach box is checked Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Box 4 Onsite Classification Critical N Standard: The Examinee ensures the [C] Site Area Emergency box is checked Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 6 Critical Y Standard:

  • The Examinee ensures the [A] Classification box is checked,
  • Enters 0812 and todays date, and
  • Enters the EAL# (EAL SS2.1)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Box 6 Event Release Status Critical Y Standard: The Examinee checks the [A] None.

Evaluator Note: Indicate whether a radioactive release is occurring. The definition of radioactive release is the release of radioactive material to the environment attributable to the emergency event. Examples are given on back of NARS form box 6.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Critical Y Standard: The Examinee checks the [A] Not Applicable.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 9 Box 8 Wind Direction Critical Y Standard:

  • The Examinee enters the From _____Degrees value (303.2°) and
  • Circles the affected sectors (EFGH).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Critical Y Standard:

  • The Examinee enters the Miles/Hr.: _____ value (12.6 mph) and
  • Circles the applicable Stability Class (D).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Critical Y Standard: The Examinee checks the [A] None block.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 12 Critical N Standard: The Examinee at a minimum describes the EAL being implemented, Failure of Reactor Protection System Instrumentation to Complete or Initiate an Automatic Reactor Trip Once a Reactor Protection System Setpoint Has Been Exceeded and Manual Trip Was NOT Successful Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Return the form to the Emergency Director for approval.

Critical Y Standard: The Examinee returns the form (Boxes 1 through 11 completed) to the Shift Manager (Emergency Director) for his review and approval within 15 min.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The Evolution is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

THIS IS KEY DO NOT HAND OUT ATTACHMENT B NUCLEAR ACCIDENT REPORTING SYSTEM FORM (NARS)

TIME ANSWERED State Warning Center I or II __________(Time) Kewaunee Co. ___________ (Time) Manitowoc Co. _____________ (Time)

"This is the Point Beach Nuclear Site calling from the (circle one) CR/TSC/EOF/AEOF. An incident has occurred at our facility. Please record the following information on your Nuclear Accident Reporting System form." (Read below Box 1 through Box 12)

1. Reason For Call: Initial Report Emergency Classification Change PAR Change Change in Release Status
2. STATUS 3. AFFECTED STATION

[A] Actual Event [B] Point Beach

[B] Drill/Exercise

4. ONSITE CLASSIFICATION 5. TIME & DATE OF CLASSIFICATION / PAR CHANGE / TERMINATION

[A] Unusual Event

[A] Classification Time ___0812_ Date _Today_ EAL # __SS2.1_

[B] Alert

[C] Site Area Emergency

[D] General Emergency

[B] Par Change Time ________ Date _______

[E] Recovery

[F] Terminated

[C] Recovery/Termination Time ________ Date _______

6. EVENT RELEASE STATUS 7. TYPE OF RELEASE

[A] NOT APPLICABLE

[A] NONE [B] OCCURRING [C] TERMINATED

[B] AIRBORNE

[C] LIQUID

8. WIND DIRECTION 9. WIND SPEED & STABILITY CLASS FROM ___303.2_ DEGREES (Circle applicable stability class)

DOWNWIND SECTORS: A B C D E F G H J K L M N P Q R MILES/HR.: ___12.6_____

(Circle affected sectors.) STABILITY CLASS: A B C D E F G (Unstable < = = > Stable)

10. PROTECTIVE ACTION RECOMMENDATIONS

[A] NONE

[B] EVACUATE ALL SECTORS OUT TO ______ MILES [C] SHELTER ALL SECTORS OUT TO ______ MILES EVACUATE SECTORS __________OUT TO ______ MILES SHELTER SECTORS __________OUT TO ______ MILES

11. ADDITIONAL INFORMATION ( EAL Description)

Failure of Reactor Protection System Instrumentation to Complete or Initiate an Automatic Reactor Trip Once a Reactor Protection System Setpoint Has Been Exceeded and Manual Trip Was NOT Successful_______________________________________________________________________________________________________

ED: APPROVAL SIGNATURE ___________________________________ DATE / TIME APPROVED ______________/_____________

1. "State Warning Center, please read back this message to verify accuracy." (Pause to allow message to be read back)
2. "Have all agencies received this message?" (Wait for reply)
3. "Relay this information to Emergency Management immediately. Have the appropriate personnel verify this message by placing a return phone call. The return phone number is _______________________."
12. EMERGENCY COMMUNICATOR _________________________________/__________________________________

(Print/sign)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 10 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are participating in an ERO Team Training Drill. The following conditions exist in the Simulator.
  • Unit 1 and Unit 2 were operating at 100% normal steady-state conditions.
  • An RCS leak occurred inside containment on Unit 1 which led to trip criteria per the AOPs.
  • Shift management ordered a Unit 1 trip at 0800.
  • The RO tried to trip the reactor manually with both sets of pushbuttons unsuccessfully.
  • The RO tried to de-energize 1B01 and 1B02 480 VAC busses unsuccessfully.
  • An AO has been dispatched to open the Unit 1 reactor trip breakers locally.
  • An automatic Safety Injection has occurred on low Pressurizer pressure.
  • The Crew is responding in accordance with the Critical Safety Procedures (CSPs).

It is 0812 and the Shift Manager has just declared a Site Area Emergency classification in accordance with EAL SS2.1, Failure of Reactor Protection System Instrumentation to Complete or Initiate an Automatic Reactor Trip Once a Reactor Protection System Setpoint Has Been Exceeded and Manual Trip Was NOT Successful.

PPCS page 2226 indicates the following:

Wind Speed 12.6 MPH Wind Direction 303.2 DEGREES Stability Class D Lake Breeze NO INITIATING CUES (IF APPLICABLE):

  • The Shift Manager (Emergency Director) has directed you to complete the Nuclear Accident Reporting System Form (NARS) through, and including Box 11 and return the form to him for his authorization signature per EPIP 1.1, Course of Actions, Section 10.

This JPM is time critical.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 11 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 12 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: PERFORM ROD EXERCISE TEST JPM NUMBER: PBN JPM P001.020COT REV. 1 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P001.020.COT/PERFORM CONTROL ROD EXERCISES TASK TITLE(S):

K/A NUMBERS: 001.K4.02 (3.8/3.8), 001.A3.05 (3.5/3.5), 001.A4.03 (4.0/3.7)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: No Alternate Path: Yes TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P001.020COT JPM

Title:

PERFORM ROD EXERCISE TEST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 CO.
  • Unit 1 is at 100% power, steady state Xenon.

INITIATING CUES:

  • The SRO has directed you to perform TS-5, Rod Exercise Test Unit 1. The Pre-job brief has been completed.
  • An AO is standing by in the Unit 1 Rod Drive MG Set Room to assist in the performance of the test.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: TS-5, Rod Exercise Test Unit 1 REI 7.0, Control Rod Position Determination General

References:

TS-5, Rod Exercise Test Unit 1 Rev 31 REI 7.0, Control Rod Position Determination Rev 24 Task Standards: Bank D rods have been exercised, bank overlap counter discrepancy corrected and bank D rods returned to their original position.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Review Precautions/Limitations and Initial Conditions Critical N Standard: The examinee reviews TS-5, Rod Exercise Test Precautions and Limitations and Initial Conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Record the following indications:

Critical N RDC-LOGIC Cabinet (Key #21):

-Bank Overlap Counter reading Standard: Examinee contacts Unit 1 Turbine Hall Operator and obtains the Bank Overlap Counter Reading.

Evaluator Note: Counter Reading is in the rod control cabinet in the Rod Drive MG set Room.

Evaluator Cue: AO reports that the Bank Overlap Counter is reading 594.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Status of the Group Select Lights for the following power cabinets:

Critical N -1AC - Group Select Light C

-2AC - Group Select Light C

-1BD - Group Select Light B Standard: Examinee contacts the U1 TH Operator and obtains the status of the lights.

Evaluator Note: Light status is found on the power cabinets in the RD MG Set Room Evaluator Cue: AO Reports C lights lit for 1AC and 2AC and B light lit for 1BD.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 4 1C04, Rod Bank Group (Demand) counters:

Critical Y -Control Bank A Group 1

-Etc.

Standard: The examinee correctly records Control and Shutdown Bank Group Demand counter readings.

Evaluator Note: *All Bank Demand counters should indicate 228 steps except Bank D which should indicate 220 steps. Since only Bank D rods are being exercised for this JPM, only the Bank D readings are critical.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 1C-120A, RPI #1, Bank Position Display Critical N -Bank A

-Bank B

-Bank C

-Bank D Standard: The examinee correctly records bank positions on 1C-120A.

Evaluator Note: Bank Positions are indicated behind the Main Control Boards on 1C-120A.

Examinee may ask permission to go behind the boards. Indicate that the 3rd license will have responsibility for the Unit while the examinee retrieves the readings.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 6 Compare the Bank Overlap Counter reading to Control Bank position (Step Critical N Counters) in REI 7.0, Control Rod Position Determination.

Standard: The examinee obtains a copy of REI 7.0 and compares the Control Bank position with the Bank Overlap Counter and determines whether the readings agree.

Evaluator Note: The examinee should determine that the Control Bank position and Bank Overlap Counter do NOT agree. With Control Bank D at 220 steps, the Bank Overlap Counter should read 595.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 If the Control Bank Position AND Bank Overlap Counter reading do not agree, Critical Y then perform Attachment A.

Standard: The examinee determines the readings do not agree and goes to attachment A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Place Rod control selector to Manual Critical Y Standard: The examinee places Rod control selector switch to the Manual position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 9 Step Control Bank D out 1 step from its current position.

Critical Y Standard: The examinee steps Control Bank D out 1 step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Bump step Control Bank D in one step.

Critical Y Standard: The examinee bumps Control Bank D in one step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Check card A105 has the BOTTOM LIGHT ILLUMINATED (top row, 3rd card Critical N from the left in the Rod Control Logic Cabined directly above the Bank Overlap Counter).

Standard: The examinee contacts the Auxiliary Operator in the Rod Drive Room and obtains status of card A105 bottom light.

Evaluator Note: Based on the report from the AO, steps 5.0 and 6.0 of Attachment A will be N/A Evaluator Cue: The AO reports card A105 has the bottom light illuminated.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 12 Compare the Bank D Demand Position (Step Counters) to the Bank Overlap Critical N Counter.

Standard: The examinee contacts the AO for the Bank Overlap Counter reading and compares the Step Counter for Bank D to the obtained Bank Overlap Counter reading.

Evaluator Cue: AO reports the Bank Overlap Counter reads 595.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 IF the Control Bank D Position (Step Counters) and the Bank Overlap Counter do Critical N not agree, THEN adjust the Bank Overlap Counter at RDC Logic Cabinet by depressing the +1 or -1 button as necessary until the proper value correlating to the Control Rod Bank D Position (Step Counters).

Standard: Determine step is not required to be performed and N/A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 14 Return the Control Rod selector switch to AUTO.

Critical N Standard: The examinee places Control Rod selector to auto.

Evaluator Note: When examinee asks for an Independent Verification of this step, initial the step for IV.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 15 If printed PPCS data is required, then obtain a screen print of PPCS display page Critical N 2121 prior to and following movement of each rod group.

Standard: The examinee requests whether PPCS printed data is required.

Evaluator Note: Examinee may wish to print the data, inform them that it is not required.

Evaluator Cue: Printed PPCS data is not required.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 16 IF Control Bank D is not fully inserted, THEN perform the following exercise test:

Critical Y Place the Control Rod Bank Selector switch to the CBD position.

Standard: The examinee places the Control Rod Bank Selector switch to the CBD position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 Perform the following rod step sequence twice:

Critical N Step Control Bank D out 1 step from its current position.

Standard: The examinee steps Control Bank D out 1 step.

Evaluator Note: This step and the next will be repeated.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 10 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 18 Bump step Control Bank D in one step.

Critical N Standard: The examinee bumps Control Bank D in one step.

Evaluator Note: This step and the previous will be repeated.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 19 Insert OR Withdraw Control Bank D at least 10 steps but no more than 20 steps Critical Y while observing movement on individual Control Bank D rods.

Standard: The examinee inserts Control Bank D at least 10 but not more than 20 steps.

Evaluator Note: The examinee must recognize that there is not enough room to withdraw the rods 10 steps and must therefore insert the rods the required distance Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 20 Withdraw OR insert Control Bank D to the position recorded in Step 5.1.3 Critical Y Standard: The examinee withdraws Control Bank D to its original position recorded in Step

5.1.3. Performance

SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 11 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 21 Withdraw Control Bank D one step.

Critical Y Standard: The examinee withdraws Control Bank D one step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 22 Insert Control Bank D one step.

Critical Y Standard: The examinee inserts Control Bank D one step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 23 Ensure Control Bank D is in the position recorded in Step 5.1.3.

Critical N Standard: The examinee ensures the Control Bank D Group Demand Counter reading matches the number obtained in step 5.1.3.

Evaluator Note: CB D Demand Counter should read 220. When examinee asks for an Independent Verification of this step, initial the step for IV.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 12 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

Simulator Setup Instructions:

Snap Simulator into IC-2 Verify Rod Counter reading are at 228 for all banks except CB D which should be set to 220.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 13 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 CO.
  • Unit 1 is at 100% power, steady state Xenon.

INITIATING CUES:

  • The SRO has directed you to perform TS-5, Rod Exercise Test Unit 1. The Pre-job brief has been completed.
  • An AO is standing by in the Unit 1 Rod Drive MG Set Room to assist in the performance of the test.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 14 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 15 of 15

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Respond to a loss of Containment Sump Recirculation Capability JPM NUMBER: PBN JPM P000.023.COT REV. 3 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P000.023.COT / Respond to a loss of Containment Sump Recirculation TASK TITLE(S): Capability K/A NUMBERS: E11 EK1.2(3.6/4.1), E11 EK3.3(3.8/3.8), E11 EA2.2 (3./4.2)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: No Alternate Path: Yes TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: JPM P000.023.COT JPM

Title:

Respond to a loss of Containment Sump Recirculation Capability Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the third RO
  • Unit 1 has tripped due to a large break LOCA.
  • The crew has transitioned to EOP-1.3, Transfer to Containment Sump Recirculation - Low head Injection.
  • When the Crew discovered that SI-850A and SI-850B would not open they transitioned to ECA-1.1, Loss of Containment Sump Recirculation.
  • ECA-1.1 has been completed up through Step 21.
  • The Unit 1 RO will respond to any alarms not associated with this task INITIATING CUES (IF APPLICABLE):
  • The OS directs you to delay depletion of the RWST by continuing with ECA-1.1, Loss of Containment Sump Recirculation, starting at Step 22.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: ECA-1.1, Loss of Containment Sump Recirculation steps 22 -27 and Figure 1.

General

References:

ECA-1.1, Loss of Containment Sump Recirculation, Rev 32 Task Standards: Throttle SI pump flow to at least 225 gpm per ECA 1.1, Loss of Containment Sump Recirculation.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Check if SI should be terminated.

Critical N

  • Check Reactor Vessel Level from table below satisfied:

RCPS RUNNING REQUIRED REACTOR VESSEL LEVEL 1 Wide Range > [100] 95 feet 0 Narrow Range > [30] 27 feet.

  • Check RCS Subcooling based on CET > [130°F] 85 °F.

Standard: SI Termination conditions not met due to subcooling and RNO is referenced.

Evaluator Note: This is a Continuous Action step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Establish minimum injection flow:

Critical N 1) Determine minimum injection flow required for decay heat removal from Figure 1.

2) Try to establish minimum injection flow using charging flow, 1HC-142 Standard: Determine based on plant conditions and elapsed time (cue) that 150 gpm is required per Figure 1 and establish total flow not less than 150 gpm.

Evaluator Note: In addition to adjusting HC-142, examinee may adjust charging pump speed and/or start a third charging pump, but will recognize that 150 gpm cannot be established with charging alone.

Evaluator Cue: Reactor trip was 30 minutes ago Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 If minimum injection flow can not be established using charging flow, then Critical Y minimize charging flow and establish SI pump flow:

  • If SI pump suction is from RWST, then reduce SI flow to establish 225 gpm 1SI-866A for pump A or 1SI-866B for pump B Standard: Minimize charging Lower SI flow on the running SI pump using the associated SI-866 valve observing indication on the flow-meter until 225 gpm is established.

Evaluator Note: SI flow of at least 225 gpm must be established for this step to be SAT Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 4 Stop SI and RHR pumps not required to maintain minimum required injection Critical Y flow.

Go to Step 26.

Standard: Running RHR pump secured Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Verify adequate injection flow:

Critical Y

  • Check reactor vessel level indication:

RCPS RUNNING REQUIRED REACTOR VESSEL LEVEL 1 Wide Range > [100] 95 feet 0 Narrow Range > [30] 27 feet.

  • Core exit thermocouples stable or trending lower.

Standard: Adequate injection flow verified or adjusted as necessary to establish vessel level > 27 ft and temperature stable or lowering.

Evaluator Note: Examiner can stop JPM any time after the examinee has adjusted SI Pump discharge flow to stabilize or restore CETs and Reactor Vessel level.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This JPM is complete Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the third RO
  • Unit 1 has tripped due to a large break LOCA.
  • The crew has transitioned to EOP-1.3, Transfer to Containment Sump Recirculation.
  • The crew then transitioned to ECA-1.1, Loss of Containment Sump Recirculation, when it was discovered that SI-850A and SI-850B would not open.
  • ECA-1.1 has been completed up to Step 21.
  • The Unit 1 RO will respond to any alarms not associated with this task INITIATING CUES (IF APPLICABLE):
  • The OS directs you to delay depletion of the RWST by continuing with ECA-1.1, Loss of Containment Sump Recirculation, starting at Step 22.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

Insert trigger 1 to Trip Unit 1 from full power, perform actions of EOP-0, transition to EOP-1.3, transition to ECA-1.1 and complete Steps 1-21 of ECA-1.1, then freeze simulation and snap IC.

After reaching step 21, to minimize core decay heat you can run the IC without taking procedure actions.

This will inject RWST water to minimize core decay heat, from trip to snapping final IC could be 45 minutes. This will better model the time it would take a crew to get to the ECA. Make sure you do not cool down to the point where subcooling will not allow the RNO actions of an alternate path JPM.

SIMULATOR OVERRIDES; TIME OVERRIDE ID. OVERRIDE DESCRIPTION VALUE Trigger 1 MAL1RCS002D Loop B Hot Leg LOCA 100 Preload VLV1RHR014 SI-850A RHR Suction Valve 1- Fail Control Fuse Preload VLV1RHR015 SI-850B RHR Suction Valve 3- Close Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 9

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: DRAIN THE ACCUMULATORS JPM NUMBER: JPM P006.003COT REV. 5 RELATED PRA None INFORMATION:

TASK NUMBERS / P006.003.COT TASK TITLE(S): DRAIN THE ACCUMULATORS K/A NUMBERS: 006 A1.13 (3.5/3.7), 006 A4.02 (4.0/3.8)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: JPM P000.003COT JPM

Title:

DRAIN THE ACCUMULATORS Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 and Unit 2 are at 100% steady-state conditions.
  • Unit 1 RCDT level is 30%.

INITIATING CUES (IF APPLICABLE):

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: OI 100, Adjusting SI Accumulator Level And Pressure.

Calculator General

References:

OI 100, Adjusting SI Accumulator Level And Pressure. Rev 32 Task Standards: The Examinee lowers 1(2) T-34A SI accumulator level to 30% (+/-2%) in accordance with OI 100, Adjusting SI Accumulator Level And Pressure.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Perform Attachment A, Accumulator Level/Pressure Change Data Sheet, Section Critical N (SEQ-1) 1.0 and 2.0.

Standard: The Examinee performs Attachment A, Accumulator Level/Pressure Change Data Sheet, Sections 1.0 and 2.0.

Evaluator Cue: If asked, report daily accumulator leak rate is <0.7%/day.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 5.3.2 Pump down the RCDT for affected Unit to 30% per OI-57, Reactor Coolant Critical N (SEQ-1) Drain Tank Pump Priming and Operation: (Mark the one NOT used N/A.)

  • Unit 2 RCDT Standard:
  • The Examinee marks Step 5.3.2 N/A and
  • Proceeds to Step 5.3.3.

Evaluator Note: Unit 1(2) RCDT level at 30% is one of the Initial Conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 5.3.3 Establish communications with PAB Auxiliary Operator to monitor RCDT Critical N (SEQ-1) pressure and level during accumulator draining to RCDT.

Standard:

  • The Examinee establishes communications with the primary auxiliary building Auxiliary Operator and

Evaluator Cue:

  • You have established radio communications with the PAB Auxiliary Operator and
  • The PAB Auxiliary Operator acknowledges your request to monitor RCDT pressure and level during accumulator draining.
  • If asked, report current RCDT pressure is 1.4 psig Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 4 5.3.4 Record RCDT initial level in Attachment A, Accumulator Level/Pressure Critical N (SEQ-1) Change Data Sheet, Section 4.0 Standard: The Examinee records RCDT initial level in Attachment A, Accumulator Level/Pressure Change Data Sheet, Section 4.0.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 5.3.5 Monitor all available channels for accumulator pressure and level during Critical N (SEQ-1) accumulator drain.

Standard: Examinee may ask another operator to monitor front of the boards during draining.

Evaluator Cue: If asked, another operator will monitor accumulator indications on the front of the boards.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 5.3.6 Open accumulator drain valve to drain the affected accumulator to desired Critical Y (SEQ-2) level: (Mark the valve NOT used N/A.) (C01R)

  • The Examinee places the control switch for the accumulator drain valve, SI-844A to the Open position and

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 7 5.3.7 Drain the SI accumulator to the desired level as indicated on one of the Critical Y (SEQ-3) following indicators: (Mark the indicators NOT used N/A.)

Standard: The Examinee drains the SI accumulator to 30% (+/-2%) as indicated on chosen indicators. Indicators not used are marked N/A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 5.3.8 WHEN the desired level in the accumulator is achieved, THEN shut the Critical Y (SEQ-4) accumulator drain valve opened in Step 5.3.5: (Mark the valve NOT used N/A)

(C01R)

  • The Examinee places the control switch for the accumulator drain valve, SI-844A to the Close position and

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 9 5.3.9 Perform Attachment A, Accumulator Level/Pressure Change Data Sheet, Critical N (SEQ-5) Sections 4.0, 5.0 and 7.0.

Standard: The Examinee performs Attachment A, Accumulator Level/Pressure Change Data Sheet, Sections 4.0, 5.0 and 7.0.

Evaluator Cue:

  • When asked, final RCDT level is 39%.
  • When asked, log entry has been made.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 5.3.10 Ensure accumulator pressure is between 720 and 760 psig as indicated on Critical N (SEQ-5) one of the following indicators: (Mark the indicators NOT used N/A).

Standard: The Examinee ensures accumulator pressure is between 720 and 760 psig as indicated on one of the following indicators:

And marks the following indicators N/A:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 11 Inform the OS that T-34A, SI accumulator has been drained to 30% in accordance Critical N (SEQ-5) with OI 100, Adjusting SI Accumulator Level And Pressure, Section 5.3.

Standard: The Examinee informs the OS that T34A, SI accumulator has been drained to 30%

in accordance with OI 100, Adjusting SI Accumulator Level And Pressure, Section 5.3.

Evaluator Cue: The OS acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This evolution is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SIMULATOR SET UP: (Modify table as necessary)

Simulator Setup Instructions:

Initial Setup:

  • Load an IC where conditions support Unit 1 and Unit 2 100% steady-state conditions
  • Start the simulation and let the preload take effect.
  • Freeze the simulator.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Save to an IC for multiple use.

Multiple Use:

  • Load the saved IC for this JPM.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Resave if required.

SIMULATOR INFORMATION:

Initiation Action or Action Malf. Ramp Delay Trigger Verification Performed Cue Component Tagname Value Time Time Ready Inserted Description Preload 1T34A Phd Expert Accumulator Command:

Level set to Set 35%

asi1t34a=701 50 (Unit 1)

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 10 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 and Unit 2 are at 100% steady-state conditions.
  • Unit 1 RCDT level is 30%.

INITIATING CUES (IF APPLICABLE):

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 11 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 12 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Synchronize Turbine Generator Output With Grid At Minimum Load JPM NUMBER: PBN JPM P045.005COT REV. 5 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P045.005.COT / Synchronize Turbine Generator Output With Grid At TASK TITLE(S): Minimum Load K/A NUMBERS: 062 A4.01 (3.3/3.1) 062 A4.03(2.8/2.9) 062 A4.07 (3.1/3.1)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P045.005COT JPM

Title:

Synchronize Turbine Generator Output With Grid At Minimum Load Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is at low power with OP-1C, Startup to Power Operation Unit 1"complete through Step 5.81. The secondary is started up and the turbine generator is ready to be placed on the grid.
  • Unit 1 TH Auxiliary Operator is standing by at 1E02 Voltage Regulator Cabinet.
  • You are the 3rd license INITIATING CUES (IF APPLICABLE):
  • OS1 directs you to place the turbine generator on the grid per OP-1C, Startup to Power Operation Unit 1",

starting at Step 5.82.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: OP-1C, "Startup to Power Operation Unit 1" Synchroscope Switch Filled out OP-1C up to step for synchronizing to grid.

General

References:

OP-1C, "Startup to Power Operation Unit 1" Rev 16 Task Standards: Main Generator in parallel with the grid at minimum load.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Ensure Generator Voltage Regulator Control Switch is in the MANUAL position Critical N Standard: Generator Voltage Regulator Control Switch is in the MANUAL position Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Ensure turbine speed between 1750 and 1800 rpm.

Critical N Standard: Turbine speed checked.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step:3 CLOSE Unit 1 Generator Exciter Field Breaker.

Critical Y Standard: Unit 1 generator Exciter Field Breaker closed.

Evaluator Note: The following alarms may occur when closing the field breaker:

  • C01 A 3-2 Unit 1 Generator Reg/Metering Voltage Failure
  • C01 A 4-4 Unit 1 Voltage Regulator Trouble Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Reset Unit 1 voltage regulator panel alarms at 1E02.

Critical N Standard: Voltage regulator alarms reset.

Evaluator Note: Insert trigger 1 to clear alarms at the Voltage Regulator Panel Evaluator Cue: Unit 1 Turbine Hall AO reports that he has reset panel 1E02 and all alarms are clear.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 5 Slowly adjust the Generator Voltage Regulator DC Adjuster to obtain a Critical N Generator Voltmeter indication of approximately 19kV at 1800 rpm.

Standard: Generator voltage raised to approximately 19 kV.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Check all three phases approximately 19 kV, using Unit 1 Generator Voltmeter Critical N switch.

Standard: Phase voltages verified at approximately 19 kV.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 For Automatic Voltage Regulation:

Critical N

  • Place Unit 1 Generator Voltage Regulator to TEST, o CHECK yellow light is LIT.
  • Ensure Generator Voltage Regulator Balance Meter is at approximately zero using Generator Voltage Regulator AC Adjuster.
  • Place Generator Voltage Regulator to AUTO o CHECK red light is LIT Standard: Automatic Voltage Regulation is set up.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 8 Place the Unit 1 Generator Breaker 122 Synchroscope switch to ON.

Critical Y Standard: Unit 1 Generator Breaker Synchroscope to on.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Adjust Incoming Voltmeter reading to match Running Voltmeter reading, using Critical Y Generator Voltage Regulator AC Adjuster.

Standard: Incoming and running voltages matched.

Evaluator Note: Incoming voltmeter reading is generator voltage. Running voltmeter reading represents line voltage.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Check Unit 1 Generator Exciter Field Ammeter at less than 23 amps.

Critical N Standard: Exciter Field current verified.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 11 Adjust turbine speed (using Reference Control raise and lower pushbuttons) as Critical Y necessary to rotate the synchroscope 2 to 5 rpm in the "FAST" direction.

Standard: Synchroscope rotating slowly in "FAST" direction.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Ensure 1F52-122 is removed from PULLOUT Critical N Standard: 1F52-122 out of PULLOUT Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 WHEN the synchroscope is just before 12:00 AND within the Green Band, Critical Y THEN Close 1F52-122, Unit 1 Generator Main Breaker.

Standard: Unit 1 Generator Main Breaker closed.

Evaluator Note: If Generator is allowed to motor, a Generator Trip and Lockout will occur in 45 seconds after receipt of reverse power alarm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 14 Check the following:

Critical N

  • 20-30 MWe Unit 1 Generator Wattmeter.
  • Unit 1 Generator Varmeter indicates a positive number (MVARS OUT).
  • "LOAD CONTROL" status light is LIT.

Standard: Status of generator load verified.

Evaluator Note: Operation of generator in VARS IN is prohibited due to risk of overheating generator bore ring Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Place the Unit 1 Generator Breaker 122 Synchroscope switch to OFF.

Critical N Standard: Synchroscope OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 16 Make notification that the unit is online intent to raise power per NP 2.1.5 Critical N Standard: Notification made to Shift Manager Evaluator Cue: SM will notify power systems supervisor.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This completes the JPM.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

Create IC with Turbine up to speed and ready for synchronization to the grid.

SIMULATOR MALFUNCTIONS:

Trigger MALFUNCTION Description DELAY RAMP Value 1 LOAGEN001 VRC Local panel alarm reset On Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 10 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Turnover Sheet INITIAL CONDITIONS:

  • Unit 1 is at low power with OP-1C, Startup to Power Operation Unit 1"complete through Step 5.81. The secondary is started up and the turbine generator is ready to be placed on the grid.
  • Unit 1 TH Auxiliary Operator is standing by at 1E02 Voltage Regulator Cabinet.
  • You are the 3rd license INITIATING CUES (IF APPLICABLE):
  • OS1 directs you to place the turbine generator on the grid per OP-1C, Startup to Power Operation Unit 1",

starting at Step 5.82.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 11 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 12 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Respond to a RCP Malfunction JPM NUMBER: JPM PBN P000.031b.COT REV. 2 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P000.031.COT / Respond to a RCP Malfunction TASK TITLE(S):

K/A NUMBERS: 015/017 AK3.03 (3.7/4.0)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical: NO Alternate Path: YES TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: JPM PBN P000.031b.COT JPM

Title:

Respond to a RCP Malfunction Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Referenced Procedure: AOP 1B, Reactor Coolant Pump Malfunction COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are C04 Operator
  • AOP-1B is in progress, currently performing step 18. Step 18 a. and b. have been completed. Unit 1 is tripped and immediate actions of EOP-0 have been completed.

INITIATING CUES (IF APPLICABLE):

  • OS1 has directed you to perform the remainder of AOP-1B, Step 18, beginning with sub step c.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: AOP-1B, Reactor Coolant Pump Malfunction, Unit 1 General

References:

AOP-1B, Reactor Coolant Pump Malfunction, Unit 1 Task Standards: The Examinee takes appropriate action to secure A RCP IAW AOP-1B, Reactor Coolant Pump Malfunction Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 18. Secure Affected RCP:

Critical Y c. Trip affected RCP Standard: Examinee Trips A RCP Evaluator Cue: A RCP green light on, red light off (as indicated on simulator)

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 d. Check at least one RCP running Critical N Standard: Examinee checks B RCP running.

Evaluator Cue: B RCP red light on, green light off. Flow indicated in B RCS loop (as indicated on simulator)

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 3 e. Shut associated PZR normal spray valve Critical N 1RC-431A for RCP A Standard: Examinee recognizes A spray valve is not shut and attempts to manually close the valve. Examinee enters RNO column for sub step e due to spray valve stuck open.

Evaluator Note: A Spray Valve controller is failed and spray valve is stuck open. Examinee will need to shut A Spray valve using override switch.

Evaluator Cue: A Spray valve red and green lights are both lit, Controller for A spray valve indicates 10% output and manual control unsuccessful (as indicated on simulator)

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 4 e. RNO IF spray valve can NOT be shut, THEN place manual Critical Y override switch for affected spray valve to close.

o 1RC-431A-S for 1RC-431A Standard: Examinee places 1RC-431A-S to close Evaluator Cue: A Spray valve green light on, red light off (as indicated on simulator).

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 5 f. Check Affected RCP has been tripped for 3 minutes.

Critical N RNO WHEN affected RCP has been tripped for 3 minutes, THEN do Steps 18.g through 18.h.

Standard: Examinee ensures 3 minutes has elapsed and continues to Step 18.g.

Evaluator Note: Examinee should note time and navigate through the procedure correctly, i.e.,

less than 3 minutes proceed to 18 f. RNO, greater than 3 minutes proceed to step 18. g. Do NOT report time to examinee.

Evaluator Cue: (Evaluator may cue that 3 minutes have elapsed once examinee has demonstrated intention and ability to perform the step correctly.)

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 6 g. Shut affected RCP No. 1 seal water return MOV Critical Y o 1CV-270A for A RCP Standard: Examinee shuts 1CV-270A Evaluator Cue: 1CV-270A green light on, red light off.

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Performance Step: 7 h. Check RCP seal water bypass control valve shut Critical N

  • 1CV-386 Standard: Examinee checks 1CV-386 shut Evaluator Cue: 1CV-386 green light on, red light off (as indicated on simulator).

Performance: SATISFACTORY _____ UNSATISFACTORY _____

Comments:

Terminating Cues: JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Historical Record:

Rev. 1 Reformatted to current revision of QF-1075-01. Revised to Rev. 20 of AOP 1B Unit 1, Reactor Coolant Pump Malfunction.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM SETUP INFORMATION Simulator Setup Instructions:

  • Load IC-2 or other full power IC
  • Insert RCP malfunctions as listed
  • Trip Reactor
  • Verify immediate actions of EOP-0 are met and insert 1HC-431K malfunction.
  • Freeze simulator and snap for reuse Simulator Malfunctions Order Type Code Severity/ Event Timing Description Value trigger Preload 1YVPNAFH RCP XMT1RCP011A 4 NA A RCP A Frame Horiz Frame Horiz Vibration Fixed Vibes Output Preload 1YVPNAFV RCP XMT1RCP012A 3 NA A RCP A Frame Vert Frame Vert Vibration Fixed Vibes Output Preload 1YVPNASH RCP XMT1RCP013A 17 NA A RCP A Shaft Horiz Shaft Horiz Vibration Fixed Vibes Output Preload 1YVPNASV RCP XMT1RCP014A 20 NA A RCP A Shaft Vert Shaft Vert Vibration Fixed Vibes Output Simulator Overrides Order Type Code Value Trigger Timing Description Preload 1PCV-431A CNH1PCS007B 10 1 NA A Spray Spray Valve controller Hand fails to Controller 10% open, Fixed Output Insert post trip NOTE: During Administration of JPM, delete Vibration Malfunctions shortly after RCP is tripped.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are C04 Operator
  • AOP-1B is in progress, currently performing step 18. Step 18 a. and b. have been completed. Unit 1 is tripped and immediate actions of EOP-0 have been completed.

INITIATING CUES (IF APPLICABLE):

  • OS1 has directed you to perform the remainder of AOP-1B, Step 18, beginning with substep c.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 10 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 11 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Nitrogen Purge the PRT JPM NUMBER: PBN JPM P007.007 COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN JPM P007.007 COT Nitrogen Purge the PRT TASK TITLE(S):

K/A NUMBERS: 007 A1.01 (2.9/3.1) 007 A1.02 (2.7/2.9) 007 A4.04 (2.6/2.6)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other:

Lab:

Time for Completion: 30 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P007.007 COT JPM

Title:

Nitrogen Purge the PRT Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is preparing for a refueling shutdown.
  • The unit is in Mode 5 with RCPs secured.
  • Temperature is 177°F and stable.
  • You are the third license.
  • Containment Closure Checklist, CL-1E is maintaining the status of containment isolation valves.

INITIATING CUES (IF APPLICABLE):

  • The OS has directed you to Purge Pressurizer Relief Tank per OP 4C, Pressurizer Relief Tank Operation Unit 1 section 5.1.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: OP 4C Pressurizer Relief Tank Operation Unit 1 General

References:

OP 4C Pressurizer Relief Tank Operation Unit 1, Rev 0 Task Standards: PRT purges PRT IAW OP 4C Pressurizer Relief Tank Operation Unit 1 Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Notify the PAB AO that during PRT purging, a Waste Gas Compressor may be Critical N required to be in operation.

Standard: Contact PAB AO and notify that a Waste Gas compressor may be required.

Evaluator Cue:

  • The PAB AO is standing by to operate a Waste Gas compressor.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Ensure 1RC-527, T-2 PRT Vent Isolation, is OPEN.

Critical Y Standard: Take 1RC-527, T-2 PRT Vent Isolation switch to OPEN Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Raise PRT level to top of indicating band (~95%), as follows:

Critical Y - Start RMW Pump selected for the service header.

Standard: Take P-23B Reactor Water pump switch (C01R) to ON and verify red light is lit.

Evaluator Note: Step 5.1.6 may be performed at this time to align nitrogen to the PRT.

If performed, insert trigger 1 when examinee contacts AO to align nitrogen to the PRT.

Evaluator Cue:

  • If Shift Supervision is asked, no Level 2 Dedicated is needed.
  • If asked, the PAB Auxiliary operator has opened RC-595 and adjusted the nitrogen regulator to 3 psig.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 4 Locally OPEN 1RC-508A, U1C (U2C) Reactor Makeup Water Isolation.

Critical Y Standard: Direct PAB AO to open 1RC-508A, U1C (U2C) Reactor Makeup Water Isolation Evaluator Note: This valve is not modeled on the simulator so we are using 0-BS-1280B instead.

Insert trigger 3 when examinee requests the PAB AO to open 1RC-508A.

Evaluator Cue: Acknowledge request and report the PAB AO has opened 1RC-508A, Reactor Makeup Water Isolation Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 OPEN 1RC-557, RMW to T-2 PRT Spray Nozzles Inlet.

Critical Y Standard: Take 1RC-557 switch to OPEN, verify red light lit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 OPEN 1RC-508, U1C Reactor Makeup Water Supply.

Critical Y Standard: Take 1RC-508 switch to OPEN, verify red light lit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 7 While filling the PRT, cycle 1RC-508 as required to maintain the PRT pressure Critical N less than 7 psig.

Standard: Monitor PRT pressure and cycle 1RC-508 if necessary to keep pressure < 7 psig Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 WHEN PRT level is approximately 95%, THEN SHUT 1RC-557, RMW To T-Critical Y 2 PRT Spray Nozzles Inlet.

Standard: Monitor PRT level and when 95 +/- 2%, take 1RC-557 switch to shut Evaluator Note: Shutting 1RC-557 is only critical if 1RC-508, U1C Reactor Makeup Water Supply is not shut later.

Sign step for Initial Verification (IV) complete for procedure use and adherence rules of usage.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 IF desired, THEN stop RMW Pump selected for the service header.

Critical N Standard: Take P-23B Reactor Makeup Water pump switch (C01R) to OFF or PULLOUT Evaluator Note: If asked, shift supervision requests that the pump be secured Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 10 SHUT 1RC-508, U1C Reactor Makeup Water Supply.

Critical Y Standard: Take 1RC-508 switch to SHUT, verify indications Evaluator Note: This step is only critical if 1RC-557, RMW to T-2 PRT Spray Nozzles Inlet was not shut previously.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Locally SHUT 1RC-508A, U1C Reactor Makeup Water Isolation.

Critical N Standard: Contact PAB AO to shut 1RC-508A, U1C Reactor Makeup Water Isolation.

Evaluator Note: This valve is not modeled on the simulator Evaluator Cue:

  • Acknowledge request and report the PAB AO has shut 1RC-508A, Reactor Makeup Water Isolation.
  • An IV has performed by a relief crew AO.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 12 WHEN PRT pressure is approximately equal to vent header pressure, THEN Critical Y SHUT 1RC-527, T-2 PRT Vent Isolation.

Standard: Contact AO to determine vent header pressure. Take 1RC-527, T-2 PRT Vent Isolation switch to SHUT Evaluator Note: Critical portion of step is to shut 1RC-527.

Sign step for Initial Verification (IV) complete for procedure use and adherence rules of usage.

Evaluator Cue: When asked, the PAB reports a pressure value equal to current PRT pressure.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

Establish initial conditions to meet procedural conditions required for PRT purge. On RHR, below 200F with RCPS secured.

Shut 0-BS-1280B Services Isolation. It will be used in place of 1RC-508A in order to meet critical tasks.

SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNCTION TITLE VALUE RAMP FUNCTION NO.

Trigger 1 LOA1PRT001 PRT nitrogen pressure regulator As requested (should be 3 psig)

Trigger 3 LOA1RMW007 Services Header Isolation 1 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 10 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 is preparing for a refueling shutdown.
  • The unit is in Mode 5 with RCPs secured.
  • Temperature is 177°F and stable.
  • You are the third license.
  • Containment Closure Checklist, CL-1E is maintaining the status of containment isolation valves.

INITIATING CUES (IF APPLICABLE):

  • The OS has directed you to Purge Pressurizer Relief Tank per OP 4C, Pressurizer Relief Tank Operation Unit 1 section 5.1.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 11 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 12 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Secure from Main Transformer Backfeed JPM NUMBER: PBN JPM P062.025.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P062.025.COT Perform Main Transformer Backfeed TASK TITLE(S):

K/A NUMBERS: 062 A4.01 (3.3/3.1) 062 A4.07 (3.1/3.1)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P062.025.COT JPM

Title:

Secure from Main Transformer Backfeed Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is in Mode 5.
  • 1X-04 Low Voltage Station Transformer has been restored after maintenance.
  • Unit 1 is on backfeed per 1-SOP-19KV-001, 1X-01 Main Power Transformer Backfeed.
  • 1A01 and 1A02 4160 Non-Safeguards Busses will remain energized per Shift Manager.
  • You are the 4th RO.

INITIATING CUES (IF APPLICABLE):

  • The OS directs you to secure from backfeed and realign busses 1A01 and 1A02 4160 Non-Safeguards Busses to 1X-04 Low Voltage Station Transformer per 1-SOP-19KV-001, 1X-01 Main Power Transformer Backfeed beginning at step 5.3.5.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials:

  • 1-SOP-19KV-001 1X-01 MAIN POWER TRANSFORMER BACKFEED OPERATION steps 5.3.5 through5.3.9 with steps 5.3.6 and 5.3.8 N/Ad.
  • Synchroscope switch General

References:

1-SOP-19KV-001 1X-01 MAIN POWER TRANSFORMER BACKFEED OPERATION Rev 4 Task Standards: Realign busses 1A01 and 1A02 to X-04 per 1-SOP-19KV-001 1X-01 Main Power Transformer Backfeed Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 1 IF transferring 1A-01 power alignment from 1X-02 to 1A-03, Critical N THEN perform the following:

- Place 1A-03 To 1A-01 Bus Tie Synchroscope switch to ON.

Standard: 1A-03 To 1A-01 Bus Tie Synchroscope switch to ON.

Evaluator Note: NOTE: Total time 1A-01 and 1A-03 are paralleled should be minimized, due to potential for 345KV breaker fault that could cause transformer/bus overload.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Ensure two supplies are in sync.

Critical N Standard: Check synchroscope indication is stationary at the 12 oclock position Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 CLOSE 1A52-37, 1A-03 To 1A-01 Bus Tie Breaker.

Critical Y Standard: Close breaker 1A52-37 Evaluator Note: Annunciator C02 E 4-7, TRANSFORMERS PARALLELED will alarm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 4 Place 1A-03 To 1A-01 Bus Tie Synchroscope switch to OFF.

Critical N Standard: 1A-03 To 1A-01 Bus Tie Synchroscope switch to OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 OPEN 1A52-01, Bus 1A-01 Normal Feed breaker Critical Y AND place control switch in PULLOUT.

Standard: Breaker 1A52-01 open with control switch in PULLOUT.

Evaluator Note:

  • Annunciator C02 E 4-7, TRANSFORMERS PARALLELED will clear.
  • Critical portion of step is to open the breaker.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 IF 1A-01 will be de-energized, Critical N THEN perform the following:

Standard: None Evaluator Note: Step was previously N/Ad by Shift Management.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 7 IF transferring 1A-02 power alignment from 1X-02 to 1A-04, Critical N THEN perform the following:

- Place 1A-04 To 1A-02 Bus Tie Synchroscope switch to ON.

Standard: 1A-04 To 1A-02 Bus Tie Synchroscope switch to ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Ensure two supplies are in sync.

Critical N Standard: Check synchroscope scope indication is stationary at the 12 oclock position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 CLOSE 1A52-55, 1A-04 To 1A-02 Bus Tie Breaker.

Critical Y Standard: Close breaker 1A52-55.

Evaluator Note: NOTE: Annunciator C02 E 4-7, TRANSFORMERS PARALLELED will alarm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 10 Place 1A-04 To 1A-02 Bus Tie Synchroscope switch to Critical N OFF.

Standard: 1A-04 To 1A-02 Bus Tie Synchroscope switch to OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 OPEN 1A52-17, Bus 1A-02 Normal Feed breaker Critical Y AND place control switch in PULLOUT.

Standard: Breaker 1A52-17 open with control switch in PULLOUT.

Evaluator Note:

  • Annunciator C02 E 4-7, TRANSFORMERS PARALLELED will clear.
  • Critical portion of the step is to open the breaker.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 IF 1A-02 will be de-energized, Critical N THEN perform the following:

Standard: None Evaluator Note: Step was previously N/Ad by Shift Management.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 13 OPEN 1F52-122, Unit 1 Generator Main Breaker.

Critical Y Standard: Open breaker 1F52-122, Unit 1 Generator Main Breaker Evaluator Note: This step will clear annunciator C02 F 1-3 if alarming due to isophase ground. (Power to alarm relay is derived from 19KV PT circuits)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 is in Mode 5.
  • 1X-04 Low Voltage Station Transformer has been restored after maintenance.
  • Unit 1 is on backfeed per 1-SOP-19KV-001, 1X-01 Main Power Transformer Backfeed.
  • 1A01 and 1A02 4160 Non-Safeguards Busses will remain energized per Shift Manager.
  • You are the 4th RO.

INITIATING CUES (IF APPLICABLE):

  • The OS directs you to secure from backfeed and realign busses 1A01 and 1A02 4160 Non-Safeguards Busses to 1X-04 Low Voltage Station Transformer per 1-SOP-19KV-001, 1X-01 Main Power Transformer Backfeed beginning at step 5.3.5.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 10 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

  • Set initial conditions to meet procedural conditions required for transformer backfeed. On RHR, below 200F with RCPS secured.
  • Establish transformer backfeed per 1-SOP-19KV-001 1X-01 Main Power Transformer Backfeed per section 5.2
  • Alarm window C02 F 1-3 is a SPARE. This window needs to be covered or replaced with a tile reading Unit 1 19KV ISOPHASE BUS GROUND for a step in the procedure/JPM.

SIMULATOR OVERRIDES; TIME OVERRIDE ID. OVERRIDE VALUE RAMP DESCRIPTION Preload LOA1GEN003 Main Generator 90 flex Removed connection removed Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 11 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 12 of 12

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: ADJUST NUCLEAR INSTRUMENTS JPM NUMBER: PBN JPM P015.011a.COT REV. 4 RELATED PRA None INFORMATION:

TASK NUMBERS / P015.011.COT / Adjust Nuclear Instruments TASK TITLE(S):

K/A NUMBERS: 015 A1.01 (3.5/3.8)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION In-Plant: Control Room:

LOCATION:

Simulator: X Other:

Lab:

Time for Completion: 25 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P015.011aCOT JPM

Title:

ADJUST NUCLEAR INSTRUMENTS Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are Unit 1 Control Operator
  • 0-TS-RE-001, Power Level Determination, Section 5.2 was previously performed. RTOP 15 was not within 0.75% of NIS power range indication on NI Channel 41.
  • This requires 0-TS-RE-002, Power Range Detector Power Level Adjustment to be performed.

INITIATING CUES (IF APPLICABLE):

  • The SM/OS directs you to perform Attachment A of 0-TS-RE-002, Power Range Detector Power Level Adjustment for power range detector N-41. All prerequisites and initial conditions have been satisfied.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: 0-TS-RE-002, Power Range Detector Level Adjustment with all channels except N-41 nad.

Completed 0-TS-RE-001, Power Level Determination.

Filled out Unit 1 Rod 14 for Unit 1.

General

References:

0-TS-RE-002, Power Range Detector Level Adjustment, Rev 6 0-TS-RE-001, Power Level Determination, Rev 15 Rod 14 Task Standards: Properly adjust indicated power range drawer A for NI Channel N-41 within 0.75% of calculated reactor power.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Record reactor thermal output determined from 0-TS-RE-001, Power Level Critical N Determination.

Standard: Ask for 0-TS-RE-001 to obtain reactor thermal output value and record in Attachment A.

Evaluator Cue: A completed copy of 0-TS-RE-001 is available and supplied as requested.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Ensure control bank selector switch on 1C04 in manual.

Critical Y Standard: Rod bank selector switch placed in manual.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Record the as found power range drawer A indication.

Critical N Standard: Locate and obtain power range drawer A value for Channel N-41 and record on Attachment A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Unlock the gain potentiometer on power range drawer B.

Critical N Standard: Locate gain potentiometer on power range drawer B (for N-41) and rotate black knob to the left to unlock.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 5 Adjust the indicated power for N-41, on power range drawer A as close as Critical Y possible to the reactor thermal output recorded in step 1, using the gain potentiometer.

Standard: Locate gain potentiometer on power range drawer A and adjust N-41 to within 0.75% of calculated reactor power.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Lock the gain potentiometer on power range drawer B.

Critical N Standard: Locate and lock the gain potentiometer by turning the black knob to the right for N-41.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Record as left power ange drawer A indication.

Critical N Standard: Record power level on AttachementA.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 8 Ensure the following alarms are clear:

Critical N Standard: Verifies alarms 1C04 1A 3-5, 4-2, 4-3, and 4-5 are clear.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Ensure 1C04 1A, 3-3, Power Range Channel Deviation is clear Critical N Standard: Verified 1C04 1A, 3-3 is clear Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Place control bank selector switch on 1C04 to automatic if desired.

Critical Y Standard: Rod Bank Selector Switch to automatic.

Evaluator Cue: If asked, supervision desires controls should be returned to automatic.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 11 Record gain potentiometer setting for each power range channel on the logsheet in Critical N the Reactor Operating Data Book, Rod 14.

Standard: Log potentiometer setting for each power range channel recorded in ROD 14 to within +5 of actual setting.

Evaluator Cue: Examiner provides a copy of ROD 14 to fill out after examinee locates ROD 14 in its proper location.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM SETUP INFORMATION Instructor Actions Prior to JPM Administration:

Initialize into a full power IC.

Perform a 0-TS-RE-001 Adjust NI-41 to read >1% below determined power from 0-TS-RE-001 without bringing in the power deviation annunciator. RTOP should also be as close to 100% as possible with steady state conditions.

Save or snap IC as necessary for multiple implementations.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are Unit 1 Control Operator
  • 0-TS-RE-001, Power Level Determination, Section 5.2 was previously performed. RTOP 15 was not within 0.75% of NIS power range indication on NI Channel 41.
  • This requires 0-TS-RE-002, Power Range Detector Power Level Adjustment to be performed.

INITIATING CUES (IF APPLICABLE):

  • The SM/OS directs you to perform Attachment A of 0-TS-RE-002, Power Range Detector Power Level Adjustment for power range detector N-41. All prerequisites and initial conditions have been satisfied.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 10 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 11 of 11

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Locally Start Gas Turbine JPM NUMBER: PBN JPM P065.001.AOT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P065.001.AOT Operate Gas Turbine TASK TITLE(S):

K/A NUMBERS: APE 068 AA1.10 (3.7/3.9)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION In-Plant: X Control Room:

LOCATION:

Simulator: Other:

Lab:

Time for Completion: 30 Minutes Time Critical: No Alternate Path: Yes TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by: Andrew Zommers Developer Date Validated by: Tom Larson Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Randy Amundson Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: PBN JPM P065.001.AOT JPM

Title:

Locally Start Gas Turbine Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • There was a fire in the Cable Spreading Room.
  • You are the Third RO and have performed the applicable steps in Attachment B, Third Reactor Operator Local Actions up to step B26.

INITIATING CUES (IF APPLICABLE):

  • You are to continue performing Attachment B starting at step B26.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: AOP-10A, Safe Shutdown - Local Control, Attachment B General

References:

AOP-10A, Safe Shutdown - Local Control, Rev 48 Task Standards: G-05 running with output breaker closed IAW AOP 10A, Attachment B Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Check G-05 -NOT RUNNING Critical N Standard: Verify G05 Gas Turbine is not running.

Evaluator Cue: G-05 is not running Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 Isolate H-01 From Offsite Power Critical Y At Panel C222A:

1) Place 43/H52-20 in -LOCAL
2) Place H52-20 in - TRIP Standard: Breaker H52-20 OPEN.

Evaluator Note: Initially examinee sees actual plant conditions with 43/H52-20 in REMOTE and Red light is lit.

Evaluator Cue: 1. 43/ H52-20 is in LOCAL

2. H52-20 green flagged switch with Green light LIT and the Red light not lit.
3. If asked, examinee did hear breaker open right behind them.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 3 At Panel C222C:

Critical Y 1) Place 43/H52-21 in -LOCAL

2) Place H52-21 in - TRIP Standard: Breaker H52-21 OPEN.

Evaluator Note: Depending on the month, this breaker could be OPEN or CLOSED. If asked, any initial cues should reflect current plant conditions.

This step only critical if the breaker is initially closed.

Evaluator Cue: 1. 43/ H52-21 is in LOCAL

2. H52-21 green flagged switch with Green light LIT and the Red light not lit.
3. If asked, examinee did hear breaker open right behind them.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 At Panel C223C:

Critical Y 1) Place 43/H52-30 in - LOCAL

2) Place H52-30 in - TRIP Standard: Breaker H52-30 OPEN.

Evaluator Note: Initially examinee sees actual plant conditions with 43/H52-30 in REMOTE and Red light is lit with Green light off.

Evaluator Cue: 1. 43/ H52-30 is in LOCAL

2. H52-30 green flagged switch with Green light LIT and the Red light not lit.
3. If asked, examinee did hear breaker open right behind them.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 5 At Panel C223A:

Critical Y 1) Place 43/H52-31 in -LOCAL

2) Place H52-31 in -TRIP Standard: Breaker H52-31 OPEN.

Evaluator Note: Depending on the month, this breaker could be OPEN or CLOSED. If asked, any initial cues should reflect current plant conditions.

This step only critical if the breaker is initially closed.

Evaluator Cue: 1. 43/ H52-31 is in LOCAL

2. H52-31 green flagged switch with Green light LIT and the Red light not lit.
3. If asked, examinee did hear breaker open right behind them.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Align Gas Turbine To X-08 Critical N At Panel C221A:

1) Place 43/H52-10 in -LOCAL
2) Place H52-10 in -CLOSE Standard: Breaker H52-10 CLOSED.

Evaluator Note: Initially examinee sees actual plant conditions with 43/H52-10 in REMOTE and Red light is lit with Green light off.

Evaluator Cue: 1. 43/ H52-10 is in LOCAL Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 7 At Panel C221C:

Critical N 1) Place 43/H52-11 in -LOCAL

2) Place H52-11 in -CLOSE Standard: Breaker H52-11 CLOSED Evaluator Note: Initially examinee sees actual plant conditions with 43/H52-11 in LOCAL and Red light is lit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Take Local Control Of G-05 Gas Turbine:

Critical Y Place G-05 43 Local/Remote switch in - LOCAL Standard: G05 43 Local/Remote switch in LOCAL.

Evaluator Note: Gas Turbine G-05 will not auto synchronize to a dead bus.

Evaluator Cue: G-05 43 Local/Remote switch is in LOCAL.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 9 At back of C-500, place G-05 43I Normal/Isolate switches in - ISOLATE Critical Y 1) IS01 -ISOLATE

2) IS02 -ISOLATE
3) IS03 -ISOLATE Standard: G05 43I switches 1, 2 and 3 in ISOLATE.

Evaluator Cue: 1) G05 43I IS01 switch is in -ISOLATE.

2) G05 43I IS02 switch is in -ISOLATE.
3) G05 43I IS03 switch is in -ISOLATE.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 At Generator Field Breaker Panel, place G-05 43I Normal/Isolate switches in -

Critical Y ISOLATE IS06 -ISOLATE Standard: G05 43I switch 6 in ISOLATE Evaluator Cue: G05 43I IS06 switch is in -ISOLATE.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 11 At H52-GO5 Panel, place G-05 431 Normal/Isolate switches in - ISOLATE Critical Y IS05 -ISOLATE Standard: G05 43I switch 5 in ISOLATE Evaluator Cue: G05 43I IS05 switch is in -ISOLATE.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 e. At C-500 Panel. place G-05 431 Normal/Isolate switches in -ISOLATE Critical Y IS04 -ISOLATE Standard: G05 43I switch 4 in ISOLATE Evaluator Cue: G05 43I IS04 switch is in -ISOLATE.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 10 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 13 Check G-05 -RUNNING Critical N Standard: Verify G05 not running.

Evaluator Note: With G-05 not running, examinee should transition to the RNO column.

Evaluator Cue: G-05 is not running Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 14 Perform the following:

Critical Y Place trip reset control switch (74 device) to RESET then back to OFF.

Standard: Reset G05 74 device.

Evaluator Cue: Trip reset switch is placed to RESET and then back to OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 11 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 15 Below G-05 43 Local/Remote switch, ensure DC Control Breaker Critical Y -CLOSED.

Standard: G05 DC control breaker CLOSED.

Evaluator Note: Examinee finds DC control breaker OPEN (Off) which is different than actual or expected plant conditions.

Evaluator Cue: 1. DC control breaker is found OFF (switch in down position).

2. DC control breaker is ON (switch in up position).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 16 Check ready to start light -LIT.

Critical N Standard: Verify ready to start light LIT.

Evaluator Cue: Ready to start light is LIT.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 Depress start pushbutton Critical Y Standard: G05 start pushbutton depressed.

Evaluator Cue: Start button is depressed and G05 is starting up.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 12 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 18 WHEN G-05 is greater than 600 RPM THEN check G-05 field breaker closed.

Critical N Standard: G05 field breaker is checked OPEN.

Evaluator Note: By procedure, breaker indication should be checked with 41CS on C500. Examinee may locally check field breaker position.

Evaluator Cue:

  • G05 is 700 rpm and rising.
  • 41CS Generator Field Breaker green light is LIT.
  • Local Generator field breaker indication is green flag (open)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 19 IF G-05 field breaker is open, THEN close G-05 field breaker.

Critical Y Standard: G05 field breaker CLOSED.

Evaluator Note: By procedure, breaker closure should be with 41CS on C500.

Examinee may locally close field breaker.

Evaluator Cue:

  • 41CS Generator Field Breaker is CLOSED with Red light LIT and Green light not LIT.
  • Local Generator field breaker local indication is red flag (closed)
  • If asked, examinee did hear breaker close.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 13 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 20 Check G-05 Output Breaker -CLOSED Critical N H52-GO5 Standard: Checks position of G05 output breaker.

Evaluator Note: There are two places to obtain G05 Output Breaker indication, on C-500 and on the breaker cubicle itself.

If examinee wants to open the output breaker cubicle to obtain breaker position, do NOT allow them to do so.

With the ISOL switches positioned per procedure, the GREEN lights will not be lit under any condition.

Examinee should transition to the RNO column of the step.

Evaluator Cue:

  • If asked, H52-GO5 G-05 Output Breaker Green light is not LIT and Red light is not LIT.
  • If asked, local breaker indication inside the breaker cubicle is OPEN.
  • If asked, G05 is 900 RPM.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 14 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 21 Manually close H52-GO5 Critical Y Place 43ST Synch Mode Selector switch to -MANUAL.

Standard: Place 43ST sync mode switch to MANUAL.

Evaluator Cue: 43ST Synch Mode Selector switch is in MANUAL.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 22 Maintain frequency -60 hz Critical N 65 CS Turbine Governor Speed Changer Standard: Verify G05 frequency normal.

Evaluator Cue:

  • Frequency is 60 Hz.
  • If asked, G05 is 900 RPM.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 15 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 23 Maintain voltage -13.8 kV.

Critical N 70 CS Exciter Field RHEO Control Switch Standard: Verify G05 voltage normal.

Evaluator Note: There are multiple voltmeter indications, make sure the appropriate cue is given.

Evaluator Cue:

  • If asked, Generator Voltage is 13.8 kV.
  • If asked, Incoming Voltage is 13.8 kV.
  • If asked, Bus or Running Voltage is zero.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 24 Turn on synch scope.

Critical Y 43SS synchroscope Standard: Synchroscope is on Evaluator Cue: 43SS synchroscope is ON If asked, synchroscope meter is rotating in the clockwise direction with the sync lights lit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 16 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 25 Close H52-GO5, GO5 output breaker.

Critical Y 52CS Main Generator Bkr Standard: G05 output breaker CLOSED.

Evaluator Note: There are two places to operate G05 Output Breaker, on C-500 and on the breaker cubicle itself. Breaker operation on C-500 will work as well as the breaker cubicle.

Evaluator Cue:

  • 52CS Main Generator Bkr Red light is LIT and Green light is not LIT. (Same cue given if examinee goes to G05 output breaker cubicle.)
  • If asked, examinee did hear breaker close.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 26 Turn off synch scope.

Critical N 43SS synchroscope Standard: 43SS synchroscope to OFF.

Evaluator Cue: 43SS synchroscope is in OFF.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 17 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Historical Record:

Rev 0: Developed for the ILT 2009 NRC exam.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 18 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • There was a fire in the Cable Spreading Room.
  • You are the Third RO and have performed the applicable steps in Attachment B, Third Reactor Operator Local Actions up to step B26.

INITIATING CUES (IF APPLICABLE):

  • You are to continue performing Attachment B starting at step B26.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 19 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 20 of 20

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Perform Local Actions for Isolating a S/G JPM NUMBER: JPM PBN P000.017.AOT REV. 4 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P000.017.AOT / Perform Local Actions for Isolating a S/G TASK TITLE(S):

K/A NUMBERS: APE 040 AA1.03 (4.3/4.3)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION In-Plant: X Control Room:

LOCATION:

Simulator: Other:

Lab:

Time for Completion: 15 Minutes Time Critical: No Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO X Additional signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBM PBN P000.017.AOT, Perform Local Actions for Isolating a S/G, Rev. 4 JPM Number: JPM PBN P000.017.AOT JPM

Title:

Perform Local Actions for Isolating a S/G Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Referenced Procedure: EOP 2 Unit 1, Faulted Steam Generator Isolation COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBM PBN P000.017.AOT, Perform Local Actions for Isolating a S/G, Rev. 4 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the PAB Auxiliary Operator.
  • Unit 1 has tripped due to a steam leak (Faulted Steam Generator) in containment.
  • The crew has identified the steam leak as being from the Unit 1 A steam generator.

INITIATING CUES (IF APPLICABLE):

  • The Unit 1 control operator has directed you to shut the Main Steam Isolation Bypass Valve 1MS-234, which is currently open.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBM PBN P000.017.AOT, Perform Local Actions for Isolating a S/G, Rev. 4 JPM PERFORMANCE INFORMATION Required Materials: None General

References:

EOP 2 Unit 1, Faulted Steam Generator Isolation Task Standards: Locally operated valves for isolating the A steam generator are shut.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 Locally shut main steam isolation bypass, 1MS-234 (85 elevation of the Critical Y façade).

Standard: 1MS-234 shut.

Evaluator Cue: 1MS-234, main steam isolation bypass valve stem is inserted, Control Operator notified.

Evaluator Cue: After 1MS-234 is shut, inform trainee that the control operator has directed him to Locally shut 1P-29/Radwaste steam isolation 1MS-235 and Main steam trap isolation 1MS-228.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBM PBN P000.017.AOT, Perform Local Actions for Isolating a S/G, Rev. 4 Performance Step: 2 Locally shut 1P-29/Radwaste steam isolation 1MS-235 (85 elevation of the Critical Y façade).

Standard: 1MS-235 shut.

Evaluator Cue: 1MS-235, 1P-29/Radwaste steam isolation valve stem is inserted.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Locally shut main steam trap isolation, 1MS-228 (85 elevation of the façade).

Critical Y Standard: 1MS-228 is shut.

Evaluator Cue: 1MS-228, main steam trap isolation valve stem is inserted.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Notify the control room of the status of the locally operated valves.

Critical N Standard: Control notified.

Evaluator Cue: The control room acknowledges the report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Evolution complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant PBM PBN P000.017.AOT, Perform Local Actions for Isolating a S/G, Rev. 4 Historical Record:

Rev. 4 Reformatted to current revision of QF-1075-01. Revised to Rev. 20 of EOP 2, Faulted Steam Generator Isolation.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the PAB Auxiliary Operator.
  • Unit 1 has tripped due to a steam leak (Faulted Steam Generator) in containment.
  • The crew has identified the steam leak as being from the Unit 1 A steam generator.

INITIATING CUES (IF APPLICABLE):

  • The Unit 1 control operator has directed you to shut the Main Steam Isolation Bypass Valve 1MS-234, which is currently open.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 8

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

SITE: Point Beach JPM TITLE: Provide Bearing Cooling to TDAFWP During a Loss of All AC Power JPM NUMBER: JPM PBN P000.022a.AOT REV. 2 RELATED PRA None INFORMATION:

TASK NUMBERS / PBN P000.022.AOT / Provide Bearing Cooling To TDAFWP During a Loss of All TASK TITLE(S): AC Power K/A NUMBERS: 2.4.34 (4.2/4.1)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION In-Plant: X Control Room:

LOCATION:

Simulator: Other:

Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path: Yes TASK APPLICABILITY: SRO: X RO: X NLO Additional signatures may be added as desired.

Developed by:

Developer Date Validated by:

Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 1 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM Number: JPM PBN P000.022a.AOT JPM

Title:

Provide Bearing Cooling to TDAFWP During a Loss of All AC Power Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Referenced Procedure: AOP-10C, Safe Shutdown Following Fire at PAB 26 Central COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 2 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 Control Operator.
  • A fire has occurred in PAB 26 Central which has caused loss of plant control from the control room.
  • AOP-10C, Safe Shutdown Following Fire at PAB 26, is in progress. Attachment C has been completed through step C10.

INITIATING CUES (IF APPLICABLE):

  • You are to continue with the performance of Attachment C, Step C11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 3 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

JPM PERFORMANCE INFORMATION Required Materials: 1. AOP-10C, Safe Shutdown Following Fire at PAB 26 Central, Attachment C

2. Diesel Fire Pump Local operator aid.

General

References:

1. AOP-10C, Safe Shutdown Following Fire at PAB 26 Central, Attachment C
2. Diesel Fire Pump Local operator aid.

Task Standards: 1. The Examinee properly places Steam Driven AFW pumps in service Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1 C11. In AFW Room, Place Turbine-Driven AFW Pumps in Service:

Critical Y a. Open the associated service water suction.

2AF-4006 handwheel stops turning, stem is extended.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 4 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 2 b. Check BOTH turbine-driven AFW pump suction pressures - GREATER Critical N THAN 7.5 PSIG

2PI-4013-B reads 9 PSIG.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 c. Check service water pressure to turbine-driven AFW pumps -

Critical Y GREATER THAN 10 PSIG.

  • PI-4364 Standard: Examinee checks SW pressure to AFW pumps and performs RNO actions Evaluator Note: Examinee should realize that SW pressure is inadequate to supply bearing cooling to TDAFW pumps and perform RNO of step 11.c.

Evaluator Cue: PI-4364 reads 8 PSIG.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 5 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 4 c. RNO Locally start P35B diesel fire pump per local instructions.

Critical N Standard: Examinee proceeds to CW pump house to start P35B.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Check the oil level in the diesel driven fire pump, P-35B.

Critical N Standard: The Examinee checks the oil level in the diesel driven fire pump, P-35B adequate for pump run.

Evaluator Cue: The oil level is full for the diesel driven fire pump, P-35B.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 6 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 6 Manually override the fuel shut off valve - turn knurled knob fully clockwise.

Critical Y Standard: The Examinee overrides the fuel shut off valve for the diesel driven fire pump, P-35B by turning the knurled knob fully clockwise (as viewed from the knob end of the valve).

Evaluator Note:

  • The knurled knob is part of the fuel shut off valve assembly, located on the east side of the diesel and is painted orange.
  • If the Examinee indicates that he is overriding the fuel shut off valve by turning the black fluted knob (engine rpm adjust), provide the following cue:
  • The knob does not turn.
  • If the Examinee indicates that he has undone the locking device for the engine rpm adjust, provide the following cue:
  • The locking device is disengaged and the knob is rotated fully clockwise.

Evaluator Cue: The knurled knob is rotated fully clockwise for the diesel driven fire pump, P-35B fuel shut off valve.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 7 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 7 Manually operate either starter solenoid joystick and start the diesel driven Critical Y fire pump, P-35B.

Standard: The Examinee positions either starter solenoid joystick to start the diesel driven fire pump, P-35B.

Evaluator Note:

  • If the Examinee had repositioned the engine rpm adjust (rather than the fuel shutoff valve override), then provide the following cue:
  • The diesel driven fire pump, P-35B turns over but does not start.

Evaluator Cue:

  • One or the other starter solenoid joysticks is position to the left to start the diesel driven fire pump, P-35B.
  • The diesel driven fire pump, P-35B turns over and starts.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Monitor diesel fire pump, P-35B cooling flow to the radiator, discharge Critical N pressure, and flow from the full flow relief valve.

Standard: The Examinee monitors cooling flow to the radiator, discharge pressure and flow from the full flow relief valve for the diesel driven fire pump, P-35B.

Evaluator Note: This completes the plaque instructions. Examinee should now continue in Attachment C.

Evaluator Cue:

  • There is adequate cooling flow to the diesel driven fire pump, P-35 radiator.
  • The discharge pressure of the diesel driven fire pump, P-35B is 125 psig.
  • There is flow from the full flow relief valve for the diesel driven fire pump, P-35B.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 8 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 9 d. Ensure 1P-29 discharge to B S/G - 10% OPEN Critical N

Evaluator Note: Examinee may check cooling water supply pressure on gauge 1PI-4458. If checked, pressure is 15 PSIG. (Service water pressure on PI-4364 still reads 8 PSIG.)

Evaluator Cue: * (prior to closing down on valve) Indicator on 1AF-4000 reads as recorded on wall plaque.

  • (after examinee declutches valve and turns handwheel clockwise)

Indicator on 1AF-4000 reads 10%.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 e. Shut 1P-29 discharge to A S/G Critical N

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 9 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Performance Step: 11 f. Ensure 2P-29 discharge to B S/G - 10% OPEN Critical N

Evaluator Note: Examinee may check cooling water supply pressure on gauge 2PI-4458. If checked, pressure is 15 PSIG. (Service water pressure on PI-4364 still reads 8 PSIG.)

Evaluator Cue: * (prior to closing down on valve) Indicator on 2AF-4000 reads as recorded on wall plaque.

  • (after examinee declutches valve and turns handwheel clockwise)

Indicator on 2AF-4000 reads 10%.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 g. Shut 2P-29 discharge to A S/G Critical N

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 10 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

Historical Record:

Rev.1 Reformatted to current revision of QF-1075-01. Revised to Rev. 6 of AOP 10C, Safe Shutdown Following Fire at PAB 26 Central.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 11 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 Control Operator.
  • A fire has occurred in PAB 26 Central which has caused loss of plant control from the control room.
  • AOP-10C, Safe Shutdown Following Fire at PAB 26, is in progress. Attachment C has been completed through step C10.

INITIATING CUES (IF APPLICABLE):

  • You are to continue with the performance of Attachment C, Step C11 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 12 of 13

Reference:

FP-T-SAT-75

Point Beach Nuclear Plant Job Performance Measure (JPM)

ATTACHMENT 1 Job Performance Measure Validation Checklist ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in NP 1.3.1.

QF-1075-01 Revision 2 05/12/08 Page 13 of 13

Reference:

FP-T-SAT-75