ML100820138

From kanterella
Jump to navigation Jump to search
Requalification Program Inspection - Beaver Valley Unit 1
ML100820138
Person / Time
Site: Beaver Valley
Issue date: 03/23/2010
From: Hansell S
Operations Branch I
To: Harden P
FirstEnergy Nuclear Operating Co
References
Download: ML100820138 (4)


Text

Mr. Paul Harden Site Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION REGION!

475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 March 23, 2010 FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077-0004

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - BEAVER VALLEY UNIT 1

Dear Mr. Harden:

In a telephone conversation on March 15,2010, Mr. Kevin Martin, Supervisor Licensed Operator Continuing Training, of your staff and Mr. David Silk, Sr. Operations Engineer, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Beaver Valley Unit 1 facility. The inspection is planned for the week of May 24, 2010, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please fumish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection; and the procedures governing your licensed operator requalification program to the NRC by April 15, 2010. Mr. K. Martin has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.

20503.

P. Harden 2

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(The Public Electronic Reading Room).

Thank you for your cooperation in this matter.* If you have any questions regarding this inspection, please contact Mr. D. Silk at (610) 337-5372.

sincere~~

=z;:.......-~2~ cO 0-..

Samuel L. Hansell, Jr., Chief tI Docket Nos:

50-334; 50-412 License Nos: DPR-66, NPF-73 cc:

Operations Branch Division of Reactor Safety William J. Rudolph, II, Manager, Operations Training cc: Distribution via ListServ

P. Harden 2

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. D. Silk at (610) 337-5372.

Docket Nos:

50-334; 50-412 License Nos: DPR-66, NPF-73 cc:

Sincerely, IRA!

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety William J. Rudolph, II, Manager, Operations Training cc: Distribution via ListServ SUNSI Review Complete:

SLH (Reviewer's Initials)

ADAMS PKG: ML100560252 ADAMS ACC #ML100820138 DOCUMENT NAME: G:\\DRS\\Operations Branch\\SILK\\Requal FY10-BV1 May10\\60dayrpi.doc After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a CODY of this document, indicate in the box: "e":::; CODY without attachment/enclosure "E" = COpy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB I

RI/DRS/OB 1 RIIDRS/OB I

I NAME CBixlerl DSilklSLH SHanseli1 DATE 03/17/10 03/17/10 03/18/10 OFFICIAL RECORD COpy I

P. Harden Distribution S. Collins, RA (R10RAMAIL Resource)

M. Dapas, DRA (R10RAMAIL Resource)

D. Lew, DRP (R1DRPMAIL Resource)

J. Clifford, DRP (R1DRPMAIL Resource)

D. Roberts, DRS (R1DRSMaii Resource)

P. Wilson, DRS (R1DRSMail Resource)

R. Bellamy, DRP S. Barber, DRP C. Newport, DRP J. Greives, DRP D. Werkheiser, SRI D. Spindler, RI P. Garrett, Resident OA L. Trocine, RI OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1-1 Resource D. Silk, DRS Examiner, DRS L. Vick, NRR/ADRO/DIRS/IOLB S. Hansell, DRS Distribution:

C. Bixler, DRS (OL Facility File)

DRS File 3