E-mail from S. Collins of USNRC to B. Bickett of USNRC, Regarding Weekly Status Report, 01/04/10
ML100810250
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 01/06/2010
From: Collins S
NRC Region 1
To: Brice Bickett
Reactor Projects Branch 2
References
FOIA/PA-2010-0118, IR-10-007
Download: ML100810250 (2)


Text

Gray, Mel From: Collins, Sam Sent: Wednesday, January 06, 2010 5:42 PM To: Bickett, Brice Cc: Gray, Mel; Lew, David

Subject:

Re Weekly Status Report, 01/04/10 Attachments: Brice Bickett-Tom Moslak Fitz Summary.doc; Fitz Status Update from telecon dtd 12-29-09.doc; ENS dtd 12-28 re Fitz Tritium.pdf Brice, nice summary of FitzP, assessments. Thanks, Sam From: Roberts, Darrell Sent: Friday, January 01, 2010 10:27 AM To: Collins, Sam; Dapas, Marc Cc: Wilson, Peter; Lew, David; Clifford, James

Subject:

Fw: Weekly Status Report, 01/04/10 Note plans for stand alone TMI report.

DJR Sent from NRC Blackberry Darrell Roberts From: White, John

.To: Wilson, Peter; Roberts, Darrell Cc: Doerflein, Lawrence; Rogge, John; Conte, Richard; Hansell, Samuel; Trapp, James; Furia, Joseph; Moslak, Thomas; Nimitz, Ronald; Noggle, James; Rolph, Ronald; Schmidt, Wayne; Cahill, Christopher Sent: Wed Dec 30 16:12:56 2009

-Subiect:_WeeklyStatusReppt,_01/04/10 .....

Outside of Scope Inspection Issue Status:

Three Mile Island:

ISI and RP inspections to cover the outage, ISI activities, and SG replacement activities in progress.

Inspections in progress. (Nimitz, Gray, Burket, Kaufman performing inspections.) Ron Nimitz is continuing inspection of HP issues associated with 11/21/09 contamination event. Based on complexity of the issue, a stand-alone report will be developed for this matter for the period 11/22/2009-1/31/2010. The report number is 05000289/2010007. Allegations relative to the contamination event have been processed by ARB and will be handled by RFI.

Licensee RCE has been completed and will be referenced in stand-alone report.

Hot Leg LBLOCA discussed in telecon with licensee and NRR on 12/15. Expect that submittal will be made prior to restart.

O ts -id

.Outsde ofScop e o f Sco e . ... ......................................................................................................................

IOutside of Scope L 2 .ai onEht~F'o John R.White Chief, Plant Support Branch 2 U.S. Nuclear Regulatory Commission, Region1 475 Allendale Road King of Prussia, PA 19406 Officp:610.3.37-5114-~