Email from Peter Bamford, NRR to Rebecca Sigmon, NRR FW: Action: Update on the TMI Event Int'L Interest - So Consider an INES Rating
ML100780484
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 11/23/2009
From: Peter Bamford
Plant Licensing Branch 1
To: Rebecca Sigmon
NRC/NRR/DIRS/IOEB
References
FOIA/PA-2010-0118
Download: ML100780484 (6)


Text

B dP Bamford, Peter From: Bamford, Peter fZ 'Ž Sent: Monday, November 23, 200P 5:10 PM To: Sigmon, Rebecca (C tv P-)-

Cc: Chernoff, Harold; Miller, Ed I .LJ P-P(-

Subject:

FW: ACTION: Update on the TMI event int'l interest- so consider an INES rating Attachments: TMI High Activity Preliminary ERF with Site Comments.doc Rebecca, attached is the version of the IAEA report that incorporates the licensee's comments. It looks like they just had some minor comments to the sentence on dose estimates for the site workers.

Bear in mind that if you decide to formally submit this report you will have to re-evaluate the press release question in conjunction with OPA.

Peter Bamford NRR/DORL/LPL 1-2 Limerick & TMI-1 Project Manager 301-415-2833

-- Original

--- Message -----

From: Sigmon, Rebecca Sent: Monday, November 23, 2009 4:31 PM To: Bamford, Peter

Subject:

FW: ACTION: Update on the TMI event int'l interest- so consider an INES rating

-- Original

--- Message -----

From: Brown, Frederick Sent: Monday, November 23, 2009 4:28 PM To: Leeds, Eric Cc: Cullingford, Michael; Zimmerman, Jacob; Cheok, Michael; Orders, William; Johnson, Michael; Jones, Cynthia; Burnell, Scott; Brenner, Eliot; Leach, Melvyn; McDermott, Brian; Lew, David; Roberts, Darrell; Sigmon, Rebecca; Thomas, Eric; Thorp, John; Boger, Bruce

Subject:

RE: ACTION: Update on the TMI event int'l interest- so consider an INES rating In an effort to ensure that we would not be doing more harm than good, we coordinated with OPA and Region I prior to submitting the INES notification to the IAEA.

OPA felt strongly that making a notification at this time would be counterproductive. Based on that input, and unless something changes, we do not intend to make the notification.

The NRR Operating Experience Branch rates every EN against the INES criteria as a part of our assessment process. This event was rated at the "0" level if anyone asks.

Fred

- Original


Message -----

From: Leeds, Eric Sent: Monday, November 23, 2009 12:56 PM To: Boger, Bruce Cc: Cullingford, Michael; Zimmerman, Jacob; Brown, Frederick; Cheok, Michael; Orders, William; Johnson, Michael 28

Subject:

ACTION: Update on the TMI event int'l interest- so consider an INES rating Importance: High Bruce -

I think Cindy makes a good suggestion below. Who on the staff would take this for action?

Eric J. Leeds, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comfmission 301-415-1270


Original Message -----

From: Jones, Cynthia Sent: Monday, November 23, 2009 9:39 AM To: Sigmon, Rebecca Cc: Dean, Bill; Wiggins, Jim; Leeds, Eric; Ross-Lee, MaryJane; Thorp, John

Subject:

Re: Update on the TMI event int'l interest- so consider an INES rating Importance: High Thx Rebecca Based on what you have given me it based on exposures its a level 0 (NRC does not have dose constraints). If you gather more info from the licensee I agree with you it could rise to a Level 1. I think it would be a good idea for NRR mgmt to decide to issue an ERF for this as a Level 1 or 0 just to help alleviate the concerns of the int'l community (I have had inquiries from Bulgaria, IAEA, Germany and the UK on this so far).

Look forward to hearing what NRR decides to do. And remind the mgmt that this would be a good example of expaining the safety signifiance of the event via INES- esp for your international counterparts who are wondering what the INES rating would be. But try to issue a provisional ERF within a day to make NRC's point.

Cyndi Cynthia G. Jones, Ph.D.

Sr. Technical Advisor for Nuclear Security, NRC/NSIR Sent from blackberry


Original Message -----

From: Sigmon, Rebecca To: Jones, Cynthia Cc: Ross-Lee, MaryJane; Rini, Brett; Thorp, John; Thomas, Eric; Brown, Michael Sent: Mon Nov 23 08:14:05 2009

Subject:

Update on the TMI event Below is the latest update I have from Region I. Highest dose appears to be 38 mrem with about 20 people showing excess exposure - I'd call it a nominal Level 0 that could possibly be considered for upgrade to Level 1 based on the number of people involved. I don't see any indication that the criteria for consideration of a Level 2 under radiological barriers and controls were tripped. The reactor is currently defueled so there were still a substantial number of safety layers in place to prevent the maximum possible release (though pending determination of the cause a Level 1 under Defense in Depth might be warranted).

As far as submission to NEWS based on significant public interest, I can float the idea on the NRR end; more information as to the cause will hopefully be available in the next couple of hours.

29

Rebecca Sigmon Reactor Systems Engineer NRR/DIRS/IOEB Operating Experience Branch (301) 415-4018 Rebecca.Sigmon@nrc.gov

-- Original

--- Message -----

From: Bamford, Peter Sent: Monday, November 23, 2009 5:49 AM To: NRR DIRSIOEB Distribution

Subject:

FW: Update on the TMI event This is information available as of Sunday evening(1 1/22). I'll send an update Mon AM sometime around 0800.

Peter Bamford NRRPDORL/LPL 1-2 Limerick & TMI-1 Project Manager 301-415-2833

-- Original

--- Message -----

From: Bamford, Peter Sent: Sunday, November 22, 2009 7:09 PM To: Chernoff, Harold Cc: Nelson, Robert; Gitter, Joseph

Subject:

FW: Update on the TMI event Harold, I participated in a conference call today (Sunday 11/22) at 4:30 PM sponsored by the Region at which they provided an update to this weekend's activities at TMI-1. Here is a summary:

Approximately at 4 PM Saturday 11/21 TMI had an event involving loss of contamination control inside containment. At the time the reactor was defueled with a hole cut in the containment wall to support the ongoing SG replacement outage. The licensee is not sure at this time what activity inside containment led to the problem. Their investigation is focusing on two activities (1) "A" piping loop decontamination activities or (2) some work on a drain line on the B" SG.

At the time of the event 175 workers were inside containment. Of these workers 151 people were selected for detailed monitoring based on nasal smears and portal monitor readings. Of the 151, about 20 people have potentially received doses greater than 10 mR. Two workers initially haven calculated doses of 183 and 202 mR. However the region feels that these estimates may be in error and are being re-evaluated. The next highest dose to a worker was 38 mR. The region appeared confident the the 38 mR person would end up being the highest exposure for this event. No site worker left the site with external contamination. Airborne contamination levels inside containment have been restored to pre-event levels and cleanup of containment surfaces is in progress. The tarp that was covering the containment opening was contaminated on its inside surface and is in the process of being replaced.

With the open equipment hatch and the SG opening there was the potential for a release outside of containment. At the time of the event a slight positive pressure existed in containment. This has now been corrected to what it should be, ie a slightly negative pressure. Based on readings from radiation monitors present at the SG opening and the duration of the positive pressure, the estimates of release levels are still less than one percent of the quarterly ODCM limit.

30

This event has generated a significant amount of media interest., Regional OPA and state liason officers have taken inquiries from multiple radio, print media and TV stations. They have performed a media briefing at TMI at 2 PM today and have conducted an interview with CNN. Good Morning America is also interested and requested an interview with the Chariman tomorrow (Monday) morning. The region offered them Sam Collins or possibly the EDO representing the NRC. (The Chariman's office and the acting DEDO were represented on the 4:30 pm call today.) GMA said they may decide to interview just an Exelon manager (possibly Bill Noll the Site VP) if they cannot get the Chariman. The GMA interview was left to be decided after the phone call. If it occurs, it sounded to me that it would likely take place in a Philadelphia studio with Sam representing the NRC.

The region feels the local reporting has been balanced and factual with no fear-mongering.

The PA governor's office has been notified and they understand this is a low level event. They apparently have some concerns about notification timeliness. The PA state was notified about 9:30 PM last night (event time was 4 PM). Based on the PA state notification, an event report was filed with the HOO (event number 45514). This event was far below levels that would warrant an unusual event declaration.

Activities for the remainder of the evening were to sort out the GMA interview and respond to further media requests (regional OPA lead). The rest of the regional activities are going to stand down at this time.

I'll update you in the morning after the 0730 call.

Pete 31

EVENT RATING FORM (ERF)

Event No.:

Sent Date:

THE INTERNATIONAL NUCLEAR EVENT SCALE (INES)

EVENT RADIATION RELEASE IN CONTAINMENT ASSOCIATED WITH STEAM EVENT DATE ItITLE GENERATOR REMOVAL 11/21/2009 RATING RATING OUT OF DEVIATION INCIDENT ACCIDENT FACILITY TYPE PROVISIONAL X DATE SCALE 0 1 2 3 4 5 6 7 Power Reactor X Research Reactor El PINAL 11/23/2009 El X E] [] E] [-E -]' [] RadWaste Facility D Radiation Source ED COUNTRY FACILITY NAME / PLACE Irradiation E] Transportation [

United States Three Mile Island, Unit ]/Middletown, PA Fuel Fabrication E] Fuel Reprocessing D Research Facility E] Mining/Milling E]

Enrichment [] Other Facility_

YES NO Off-site impact Release Beyond Authorised Limits E X Overexposure of Members of Public X On-Site Impact Contamination Spread X 17 Worker Overexposure X Damage to Radiological Barriers X Degradation of Defence In-depth X Person Injured Physically or Casualty D X Is There a Continuing Problem ED X Press Release Issued (if yes, please attach) ED X Event Description During refueling outage activities, which included operations to replace both of the unit's steam generators, low levels of radiation activity were measured on radiation monitors installed in the reactor building. Personnel were directed to immediately leave the reactor building until the source of the activity could be identified. Monitoring devices at the reactor building steam generator replacement construction opening indicated a slight increase in activity. Levels have since returned to'normal. No contamination was identified outside of the reactor building. Of 145 workers monitored for exposure to the radiation activity, about 19 were initially found to have exposures greater than 0.1 mSv (10 mrem), with the highest exposure estimated to be 0.38 mSv (38 mrem). No worker approached or exceeded any exposure limits. The sources of the activity are believed to be from maintenance tasks related to the removal of the plant's steam generators or ventilation line-up changes, though the exact cause of the increase in activity levels is still unknown. The reactor was defueled at the time ofthe event.

Rating Justification and Difficulties Encountered (quote relevant user manual paragraphs)

This event has been given a preliminary rating of 0, "Below Scale" based on section 2.3.1 of the International Nuclear and Radiological Event Scale 2008 User's Manual (http://www-pub.iaea.org/MTCD/publications/PubDetails.asp?publd=8120).

The justification for the rating is that no member of the public was exposed to any excess activity, and all exposures to workers were well within established statutory limits and licensee-established dose constraints. Though increasing the rating based on the number of personnel exposed is indicated for higher levels of exposure, at these levels no such increase is warranted: This event is being submitted due to interest expressed by member states of the IAEA for the INES rating of the event.

Contact Person for Further Information This form is provided by the IAEA INES Coordinator: Rejane Spiegelberg Planer, Incident and Emergency Centre, Department of Nuclear Safety and Security, Tel: +43 (I) 2600-26074, Fax: +43 (1) 26007-26074, email: r.spiegelberg-planeraiaea.org.

NOTE: This form should nor be used for sending information to the IAEA about an actual event!

For this puroose the Nuclear Events Web-based System (http://www-news.iaea.orL) should be used instead.

. I r EVENT RATING FORM (ERF)

Name Affiliation Dr. Cynthia Jones, Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Address: Mail Stop T4-D22A, Washington, DC 20555 Phone: 301-415-0298 Fax: 301-415-6382 eMaih cynthia.iones(anrc.gov This form is provided by the IAEA INES Coordinator: Rejane Spiegelberg Planer, Incident and Emergency Centre, Department of Nuclear Safety and Security, Tel: +43 (1) 2600-26074, Fax: +43 (1) 26007-26074, email: r.spiegelberg-planer'-iaea.org.

NOTE: This form should not be used for sending information to the IAEA about an actual event!

For this Purpose the Nuclear Events Web-based System (httT)://www-news.iaea.orv) should be used instead.