Acceptance Review Email, License Amendment Request for Approval of Leak-Before-Break of the Pressurizer Surge Line
ML100780281
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/19/2010
From: Kalyanam N
Plant Licensing Branch IV
To: Mason M, Murillo R
Entergy Nuclear South, Entergy Operations
Kalyanam N, NRR/DORL/LPL4, 415-1480
References
TAC ME3420
Download: ML100780281 (2)


Text

From: Kalyanam, Kaly Sent: Friday, March 19, 2010 11:43 AM To: MASON, MICHAEL E (WF3); MURILLO, ROBERT J Cc: Lingam, Siva; Feintuch, Karl; Lent, Susan; Burkhardt, Janet

Subject:

Acceptance Review Result License Amendment Request for Approval of Leak-Before-Break of the PZR Surge line (TAC No. ME3420)

Mike:

By letter dated February 22, 2010, Entergy Operations, Inc. (Entergy) submitted a License Amendment Request (LAR) for Approval of Leak-Before-Break of the PZR Surge line.

Your application states that based on design changes in the replacement SGs, piping systems will require rerouting in the steam generator cavity area. Due to the existing dynamic piping protection associated with the pressurizer surge line, rerouting of the replacement SG blowdown line cannot be effectively performed without the elimination of dynamic protection for the pressurizer surge line.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of Code/Regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1480.

N. Kalyanam E-mail Properties Mail Envelope Properties (94A2A4408AC65F42AC084527534CF4160882674E11)

Subject:

Acceptance Review Result License Amendment Request for Approval of Leak-Before-Break of the PZR Surge line (TAC No. ME3420)

Sent Date: 3/19/2010 11:43:29 AM Received Date: 3/19/2010 11:43:29 AM From: Kalyanam, Kaly Created By: Kaly.Kalyanam@nrc.gov

Recipients:

MMASON@entergy.com (MASON, MICHAEL E (WF3))

Tracking Status: None RMURILL@entergy.com (MURILLO, ROBERT J)

Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)

Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)

Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)

Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 7560 3/19/2010 Options Expiration Date: