MONTHYEARW3F1-2010-0003, License Amendment Request for Approval of Leak-Before-Break of the Pressurizer Surge Line2010-02-22022 February 2010 License Amendment Request for Approval of Leak-Before-Break of the Pressurizer Surge Line Project stage: Request ML1005506072010-02-28028 February 2010 WCAP-17187-NP, Technical Justification for Eliminating Pressurizer Surge Line Rupture as the Structural Design Basis for Waterford Steam Electric Station, Unit 3 Using Leak-Before-Break Methodology, Enclosure 2 to W3F1-2010-0003 Project stage: Request ML1007802812010-03-19019 March 2010 Acceptance Review Email, License Amendment Request for Approval of Leak-Before-Break of the Pressurizer Surge Line Project stage: Acceptance Review ML1011106352010-04-21021 April 2010 RAI, License Amendment Request, Approval of Final Safety Analysis Report Change for Leak-Before-Break of the Pressurizer Surge Line Project stage: RAI ML1011106472010-05-0303 May 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance W3F1-2010-0064, Response to NRC Requests for Additional Information Regarding License Amendment Request for Leak-Before-Break of the Pressurizer Surge Line2010-08-12012 August 2010 Response to NRC Requests for Additional Information Regarding License Amendment Request for Leak-Before-Break of the Pressurizer Surge Line Project stage: Response to RAI ML1030000702010-10-27027 October 2010 Request for Information, Round 2, License Amendment Request to Approve FSAR Change for Leak-Before-Break of the Pressurizer Surge Line Project stage: RAI ML1029904062010-10-27027 October 2010 Notice of Meeting with Entergy Operations, Inc. to Discuss Request for Additional Information for Waterford Unit 3 License Amendment Request to Approve FSAR Change for Leak-Before-Break of Pressurizer Surge Line Project stage: RAI ML1030101052010-10-27027 October 2010 Correction 11/10/10 Meeting Notice with Entergy Operations, Inc. to Discuss Request for Additional Information for Waterford Unit 3 License Amendment Request to Approve FSAR Change for Leak-Before-Break of the Pressurizer Surge Line Project stage: RAI ML1030600782010-10-27027 October 2010 Corrected Notice of Meeting with Entergy Operations, Inc. to Discuss Request for Additional Information for Waterford Unit 3 License Amendment Request to Approve FSAR Change for Leak-Before-Break of the Pressurizer Surge Line Project stage: RAI ML1031403752010-11-10010 November 2010 Handouts for the 11/10/10 Meeting Regarding Surge Line Leak-Before Break RCS Leakage Detection Project stage: Request ML1031904162010-11-17017 November 2010 Summary of Meeting with Entergy Operations, Inc. to Discuss Request for Additional Information for Waterford Unit 3 License Amendment Request to Approve FSAR Change for Leak-Before-Break of the Pressurizer Surge Line Project stage: RAI W3F1-2010-0083, Supplemental Response to NRC Requests for Additional Information Regarding License Amendment Request for Leak-Before-Break of the Pressurizer Surge Line2010-11-23023 November 2010 Supplemental Response to NRC Requests for Additional Information Regarding License Amendment Request for Leak-Before-Break of the Pressurizer Surge Line Project stage: Supplement ML1034806322010-12-14014 December 2010 Email, Request for Information, Round 3, License Amendment Request to Approve FSAR Change for Leak-Before-Break of the Pressurizer Surge Line Project stage: RAI W3F1-2010-0087, Additional Responses to NRC Requests for Additional Information Regarding License Amendment Request for Leak-Before-Break of the Pressurizer Surge Line2010-12-21021 December 2010 Additional Responses to NRC Requests for Additional Information Regarding License Amendment Request for Leak-Before-Break of the Pressurizer Surge Line Project stage: Response to RAI W3F1-2011-0007, Transmittal of Proprietary EPRI Report MRP-1092011-01-24024 January 2011 Transmittal of Proprietary EPRI Report MRP-109 Project stage: Request ML1103504212011-02-18018 February 2011 Request for Withholding Information from Public Disclosure - Affidavit Executed by C. King, Electric Power Research Institute on 12/17/10; 04/05 MRP-109, Alloy 82/182 Pipe Butt Weld Safety Assessment for U.S. PWR Plant Designs Project stage: Withholding Request Acceptance ML1104101192011-02-28028 February 2011 Issuance of Amendment No. 232, Approval of Change to Final Safety Analysis Report for Leak-Before-Break of the Pressurizer Surge Line Project stage: Approval 2010-02-28
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23097A0412023-04-0606 April 2023 June 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23076A0552023-03-13013 March 2023 EP Program Inspection RFI Hjs 10132022 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23052A0882023-02-17017 February 2023 Inspection Request for Information ML22335A4802022-12-0101 December 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22336A0202022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Revise Technical Specification 3/4.3.2 ML22329A0152022-11-0202 November 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22290A0442022-10-13013 October 2022 December 2022 Emergency Preparedness Program Inspection - Request for Information ML22215A2062022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Adopt Title 10 of the Code of Federal Regulations, Section 50.69: Loe and Completion Date Update ML22215A1492022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Permit the Use of Risk-Informed Completion Times in Accordance with Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2 ML22206A0172022-07-22022 July 2022 NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22209A1082022-07-15015 July 2022 NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2 ML22144A1662022-05-24024 May 2022 PI&R Request for Information and Transmittal e-mail ML22108A1792022-04-14014 April 2022 WF3 Cpcs Installation Inspection Plan Email ML22209A1062022-01-20020 January 2022 NRR E-mail Capture - (External_Sender) Options Moving Forward Regarding Waterford TSTF-505 and 50.69 ML22209A1052022-01-0606 January 2022 NRR E-mail Capture - Estimate for Completion of 50.69-TSTF-505 Peer Review ML22012A1592022-01-0505 January 2022 WF3 2022 EP Exercise Inspection RFI Sdh 010522 ML21356A5872021-12-22022 December 2021 NRR E-mail Capture - Acceptance for Review: Waterford 3 - Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML21349A2242021-12-14014 December 2021 NRR E-mail Capture - (External_Sender) Waterford 3 - Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial EP Exercise ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 ML21285A0242021-10-0505 October 2021 Digital Instrumentation and Control Modification Inspection Request for Information ML22112A1512021-08-0606 August 2021 NRR E-mail Capture - for Review: Draft RAIs to LAR to Relocate Chemical Detection Systems Technical Specifications (TS) to Technical Requirements Manual (TRM) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21218A0402021-07-26026 July 2021 NRR E-mail Capture - Final RAIs to Entergy Operations, Waterford Steam Electric Station, Unit 3 LAR to Adopt 10 CFR 50.69 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21173A1082021-06-22022 June 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Adopt TSTF-563 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21160A0852021-06-0404 June 2021 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Louisiana Regarding a Waterford Steam Electric Station, Unit 3 Amendment - Digital Upgrade I&C ML21145A0062021-05-24024 May 2021 NRR E-mail Capture - Supplement Received - Waterford Unit 3 - License Amendment Request for Boration Systems Tech Specs ML21120A1192021-04-30030 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - LAR to Relocate Chemical Detection TSs to TRM ML21105A0512021-04-14014 April 2021 4-14-21 Email - RFI for In-Office Inspection of Recent WF3 Submission of EAL Procedure Revision ML21104A0382021-04-13013 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request for TSTF-505 ML21084A2552021-03-22022 March 2021 NRR E-mail Capture - Supplement to Audit Plan Dated October 1, 2020 (Waterford 3, L-2020-LLA-0164) ML21088A1512021-03-15015 March 2021 NRR E-mail Capture - Draft Waterford Acceptance Review Letter for TSTF-505 LAR ML21069A1842021-03-0202 March 2021 NRR E-mail Capture - Announcement of QA Inspection ML21040A3892021-02-0808 February 2021 NRR E-mail Capture - Announcement of QA Inspection ML21039A6412021-01-28028 January 2021 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford 3 50.69 LAR ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email ML20288A2082020-10-0808 October 2020 8Oct2020 Email - Request for Information (RFI) to Support and Prepare for the Emergency Preparedness (EP) Program Inspection at the Waterford 3 Station Scheduled to Occur the Week of December 7, 2020 ML20289A3502020-10-0505 October 2020 NRR E-mail Capture - NRC Request for Additional Information - WF3 EAL Scheme Change - L-2020-LLA-0122 ML20239B0552020-08-26026 August 2020 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford U3 Digital Upgrade LAR ML20197A3122020-07-14014 July 2020 NRR E-mail Capture - NRC Notification of State of Louisiana Re. Waterford Steam Electric Station License Amendments - Changes to Technical Specifications ML20191A0172020-06-26026 June 2020 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford U3 EAL Scheme Change LAR ML20093C3072020-04-0101 April 2020 NRR E-mail Capture - (External_Sender) Entergy Fleet - Performance-Based Cyber Security Testing Plan Fee Waiver Response Letter (EPID P-2020-PRF-0000; CAC No. 001648) 2023-04-06
[Table view] |
Text
From: Kalyanam, Kaly Sent: Friday, March 19, 2010 11:43 AM To: MASON, MICHAEL E (WF3); MURILLO, ROBERT J Cc: Lingam, Siva; Feintuch, Karl; Lent, Susan; Burkhardt, Janet
Subject:
Acceptance Review Result License Amendment Request for Approval of Leak-Before-Break of the PZR Surge line (TAC No. ME3420)
Mike:
By letter dated February 22, 2010, Entergy Operations, Inc. (Entergy) submitted a License Amendment Request (LAR) for Approval of Leak-Before-Break of the PZR Surge line.
Your application states that based on design changes in the replacement SGs, piping systems will require rerouting in the steam generator cavity area. Due to the existing dynamic piping protection associated with the pressurizer surge line, rerouting of the replacement SG blowdown line cannot be effectively performed without the elimination of dynamic protection for the pressurizer surge line.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of Code/Regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1480.
N. Kalyanam E-mail Properties Mail Envelope Properties (94A2A4408AC65F42AC084527534CF4160882674E11)
Subject:
Acceptance Review Result License Amendment Request for Approval of Leak-Before-Break of the PZR Surge line (TAC No. ME3420)
Sent Date: 3/19/2010 11:43:29 AM Received Date: 3/19/2010 11:43:29 AM From: Kalyanam, Kaly Created By: Kaly.Kalyanam@nrc.gov
Recipients:
MMASON@entergy.com (MASON, MICHAEL E (WF3))
Tracking Status: None RMURILL@entergy.com (MURILLO, ROBERT J)
Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)
Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)
Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)
Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 7560 3/19/2010 Options Expiration Date: