Notification of Vogtle Electric Generating Plant - Component Design Bases Inspection - NRC Inspection Report 05000424-10-007 and 05000425-10-007
ML100770123
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/11/2010
From: Binoy Desai
NRC/RGN-II/DRS/EB1
To: Tynan T
Southern Nuclear Operating Co
References
IR-10-007
Download: ML100770123 (6)


See also: IR 05000424/2010007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

March 11, 2010

Mr. Tom E. Tynan

Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: NOTIFICATION OF VOGTLE ELECTRIC GENERATING PLANT -

COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION

REPORT 05000424/2010007 AND 05000425/2010007

Dear Mr. Tynan:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at Vogtle Nuclear Plant during

the period of June 14-July 16, 2010. The inspection team will be led by Mr. Robert Berryman, a

Senior Reactor Inspector from the NRC's Region II Office. This inspection will be conducted in

accordance with the baseline inspection procedure, Procedure 71111.21, Component Design

Bases Inspection, issued August 19, 2008.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

During a telephone conversation on March 3, 2010, Mr. Berryman confirmed, with Mr. Doug

McKinney of your staff, arrangements for an information gathering site visit and the three-week

onsite inspection. The schedule is as follows:

  • Information gathering visit: Week of April 26-30, 2010.
  • Onsite weeks: Weeks of June 14-18, June 28-July 2, and July 12-16, 2010.

The purpose of the information gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified and gathered or requested. Mr. George

MacDonald, a Region II Senior Reactor Analyst, may accompany Mr. Berryman during the

information gathering visit to review probabilistic risk assessment data and identify risk

significant components which will be examined during the inspection.

The enclosure lists documents that will be needed prior to the information gathering visit. Please

contact Mr. Berryman with any questions prior to preparing materials listed in the enclosure and

provide the referenced information to the Region II office by April 15, 2010. The inspectors will

try to minimize your administrative burden by specifically identifying only those documents

required for the inspection preparation.

SNC 2

During the information gathering visit, the team leader will also discuss the following inspection

support administrative details: office space; site, plant and information system access; required

resources; and information exchange protocol.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document Room

or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget control number.

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Berryman at (404) 562-4817 or me

at (404) 562-4519.

Sincerely,

/RA/

Binoy B. Desai, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-424, 50-425

License Nos.: NPF-68, NPF-81

Enclosure: Information Request for Vogtle Electric Generating Plant Component Design

Bases Inspection

cc w/encl: (See page 3)

SNC 3

cc w/encl: Moanica Caston

Vice President and General Counsel

Managing Attorney and Compliance Officer Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

Chris Clark

B. D. McKinney, Jr. Commissioner

Regulatory Response Manager Georgia Department of Natural Resources

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

Lee Foley

Hickox, T. Mark Manager of Contracts Generation

Vogtle Electric Generating Plant Oglethorpe Power Corporation

Electronic Mail Distribution Electronic Mail Distribution

N. J. Stringfellow F. Allen Barnes

Licensing Manager Director

Southern Nuclear Operating Company, Inc. Environmental Protection Division

Electronic Mail Distribution Georgia Department of Natural Resources

Electronic Mail Distribution

T. D. Honeycutt

Regulatory Response Supervisor Cynthia A. Sanders

Southern Nuclear Operating Company, Inc. Radioactive Materials Program Manager

Electronic Mail Distribution Environmental Protection Division

Georgia Department of Natural Resources

Jeffrey T. Gasser Electronic Mail Distribution

Executive Vice President

Southern Nuclear Operating Company, Inc. James A. Sommerville

Electronic Mail Distribution Program Coordination Branch Chief

Environmental Protection Division

L. Mike Stinson Georgia Department of Natural Resources

Vice President Electronic Mail Distribution

Fleet Operations Support

Southern Nuclear Operating Company, Inc. James C. Hardeman

Electronic Mail Distribution Environmental Radiation Program Manager

Environmental Protection Division

Paula Marino Georgia Department of Natural Resources

Vice President Electronic Mail Distribution

Engineering

Southern Nuclear Operating Company, Inc. Ted V. Jackson

Electronic Mail Distribution Emergency Response and Radiation

Program Manager

Bob Masse Environmental Protection Division

Resident Manager Georgia Department of Natural Resources

Vogtle Electric Generating Plant Electronic Mail Distribution

Oglethorpe Power Corporation

Electronic Mail Distribution (cc w/encl contd - See page 4)

SNC 4

(cc w/encl contd)

Mr. Steven M. Jackson

Senior Engineer - Power Supply

Municipal Electric Authority of Georgia

Electronic Mail Distribution

Mr. Reece McAlister

Executive Secretary

Georgia Public Service Commission

Electronic Mail Distribution

Office of the Attorney General

Electronic Mail Distribution

Office of the County Commissioner

Burke County Commission

Electronic Mail Distribution

Arthur H. Domby, Esq.

Troutman Sanders

Electronic Mail Distribution

Director

Consumers' Utility Counsel Division

Govenor's Office of Consumer Affairs

2 M. L. King, Jr. Drive

Plaza Level East; Suite 356

Atlanta, GA 30334-4600

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Vogtle Electric Generating Plant

U.S. NRC

7821 River Road

Waynesboro, GA 30830

Susan E. Jenkins

Director, Division of Waste Management

Bureau of Land and Waste Management

S.C. Department of Health and Environmental Control

Electronic Mail Distribution

_________________________ xG SUNSI REVIEW COMPLETE

OFFICE RII:DRS RII:DRS

SIGNATURE RA RA

NAME RBERRYMAN BDESAI

DATE 3/8/2010 3/11/2010

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

INFORMATION REQUEST FOR VOGTLE ELECTRIC GENERATING PLANT

COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM. The CDROM should be indexed and possibly hyperlinked to facilitate ease of use.

Information in lists should contain enough information to be easily understood to someone who

has knowledge of pressurized water reactor technology.

1. From your most recent probabilistic safety analysis (PSA) excluding external events and

fires, please provide:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance.

b. A list of the top 500 cutsets.

2. From your most recent probabilistic safety analysis (PSA) including external events and

fires, please provide:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance.

b. A list of the top 500 cutsets.

3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide

copies of your human reliability worksheets for these items.

4. Any pre-existing evaluation or list of components and calculations with low design

margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close

to design required output, heat exchangers close to rated design heat removal, MOV risk-

margin rankings, etc.).

5. A list of station applicability evaluations/reviews performed and documented in the station

corrective action program in the past two years for industry events, critical equipment

failures, and safety related equipment vulnerabilities (as communicated by NRC generic

communications, industry communications, 10 CFR Part 21 notifications, etc.).

6. A list of operability evaluations completed within the last two years, sorted by associated

component or system.

7. A list of common-cause failures of components that have occurred at Vogtle Electric

Generating Plant and have been identified within the last five years.

8. A list of equipment currently planned for upgrade/improvement by the site (e.g. ONE

List), including a description of the reason(s) why each component (i.e. not a

programmatic or system level concern) is on that list and summaries (if available) of your

plans to address those reasons.

9. A list of equipment currently in RIS 05-020 (formerly GL 91-18) status, or in MR (a)(1)

status.

10. Contact information for a person to discuss PRA information prior to the information

gathering trip: name, title, phone number, and e-mail address.

Enclosure