ML100760128

From kanterella
Jump to navigation Jump to search
Senior Reactor Operator Limited to Fuel Handling Initial Examinations - Limerick and Peach Bottom
ML100760128
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 03/17/2010
From: Hansell S
Operations Branch I
To: Pardee C
Exelon Generation Co, Exelon Nuclear
References
NUREG-1021
Download: ML100760128 (5)


Text

UNITED S'rATES NUCLEAR REGULATORY COMMISSION REGU)N J 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19408-1415 March 17, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUB..IECT: SENIOR REACTOR OPERATOR LIMITED TO FUEL HANDLING INITIAL EXAMINATIONS - LIMERICK AND PEACH BOTTOM

Dear Mr. Pardee:

In a telephone conversation on March 10,2010, between Mr. Joseph D'Antonio, Senior Operations Engineer, and Mr. Corey Goff, Operations Training Manager, arrangements were made for the administration of licensing examinations at the Limerick and Peach Bottom Nuclear Generating Stations during the weeks of July 19 and July 26,2010.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 3,2010. The written examinations, operating tests, and the supporting reference materials requested by Mr. D'Antonio will be due by May 31, 2010. Pursuant to Title 10, Section 55.40{b} (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3>>, an authorized representative of the facility licensee shall approve the outlines, examinations, and tests befo're they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeg1,.lards information in your response be contained in a separate enclosure and appropriately ,

marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1 021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

C. Pardee 2 To permit timely NRC review and evaluation, your staff should submit preliminary limited senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150"0090). medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150~090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMS, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U.S. Nuclear Regulatory CommiSSion, Washington, DC 20555-0001, or by Internet electroniC mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agenoywide .

Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http;/Iwww.nrc.gov/reading rm/adams.html.

Thank you for your cooperation in this matter. Mr. Goff has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D'Antonio at (610) 337-5085. or me at (610) 337 5046.

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket Nos. 50-277, 50-278, 50~352, and 50-353 License Nos. DPR-44, DPR-56, NPF-39, and NPF-85 cc: Distribution via ListServ

C. Pardee 2 To permit timely NRC review and evaluation, your staff should submit preliminary limited senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOINPrivacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget. Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading rmfadams.htmL Thank you for your cooperation in this. matter. Mr. Goff has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D'Antonio at (610) 337-5085, or me at (610) 337 5046.

Sincerely, IRA!

Samuel L. Hansell. Jr., Chief Operations Branch Division of Reactor Safety Docket Nos. 50-277, 50-278,50-352, and 50-353 License Nos. DPR-44. DPR-56. NPF-39, and NPF-85 cc: Distribution via ListServ SUNSI Review Complete: JMDI (Reviewer's Initials)

. ADAMS PKG: ML092470056 ADAMS NO.: ML100760128 DOCUMENT NAME: G:\DRS\Operatlons Branch\DANTON/O\Exam 10**LGS...PB LSRO July 10(U01796-U01795)\120dayexamltr.doc After declann this document "An Official nc Record," it will be released to the Public.

RI/ORS/OB Rl/ORSfOB RlIDRS/OB CJBixler{ JDAntonio/JMD" SHansell1 03/12/10 03/10/10 03/15110 OFFICIAL RECORD COPY

.. See Previous Concurrem;e Page

C. Pardee 3

~

Corey Goff, Manager, Operations Training R. B. Dickinson, Limerick Director of Training A. Wasong, Peach Bottom Director of Training

Name -4 Distribution:

S. Collins, RA (R10RAMAIL Resource)

M. Dapas, DRA (R10RANlAIL Resource)

D. Lew, DRP (R1DRPMAIL Resource)

J. Clifford, DRP (R1DRPMAIL Resource)

D. Roberts, DRS (R1 oRSMaii Resource)

P. Wilson, DRS (R1DRSMail Resource)

P. Krohn, DRP A. Rosebrook, DRP E. Torres, DRP J. Bream, DRP E. DiPaolo, DRP, SRI N. Sieller, DRP, RI L. Trocine, RI, OEDO F. Bower, DRP, SRI A. Ziedonis, DRP, RI G. Cowan, Acting OA-Limerick S. Schmitt, DRP, OA-Peach Bottom RidsNrrPMLimerick Resource RidsNrrPMPeachBottom Resource RidsNrrDorlLpl1-2 Resource J. D'Antonio, Chief Examiner, DRS S. Hansell, DRS Distribution:

DRS Master Exam File (C. Bixler) (w/concurrences)

DRS File