ML100750361
| ML100750361 | |
| Person / Time | |
|---|---|
| Site: | Crystal River, San Onofre, Crane |
| Issue date: | 10/08/2009 |
| From: | Karwoski K Office of Nuclear Reactor Regulation |
| To: | Meena Khanna NRC/NRR/DE/EMCB |
| References | |
| FOIA/PA-2010-0010 | |
| Download: ML100750361 (4) | |
Text
2/
Orf, Tracy From:
Sent:
To:
Subject:
Attachments:
Karwoski, Kenneth Thursday, October 08, 2009 12:16 PM Khanna, Meena Plants who have Replaced Steam Generators Steam Generator Replacements - Completed.doc
- Meena, The list is attached. It probably has more information than you need, but all the plants are listed.
Please note that in addition to Crystal River, TMI-1 and San Onofre 2 are also replacing steam generators this fall.
Ken I
STEAM GENERATOR REPLACEMENTS Completed SG Manufacturer/Model No. of Original Replacement Tube Plant Name Loops Date Material Surry 2 3
W/51 W/51 F 9/80 600TT Surry 1 3
W/51 W/51F 7/81 600TT Turkey Point 3 3
W/44 W/44F 4/82 600TT Turkey Point 4 3
W/44 W/44F 5/83 600TT Point Beach 1 2
W/44 W/44F 3/84 600TT Robinson 2 3
W/44 W/44F 10/84 600TT Cook 2 4
W/51 W/54F 3/89 690TT Indian Point 3 4
W/44 W/44F 6/89 690TT Palisades 2
CE CE 3/91 600MA Millstone 2 2
CE-67 BWC 1/93 690TT North Anna 1 3
W/51 W/54F 4/93 690TT Summer 3
W/D3 W/D75 12/94 690TT North Anna 2 3
W/51 W/54F 5/95 690TT Ginna 2
W/44 BWC 6/96 690TT Catawba 1 4
W/D3 BWC 9/96 690TT Point Beach 2 2
W/44 W/D47 12/96 690TT McGuire 1 4
W/D2 BWC 5/97 690TT Salem 1 4
W/51 W/F 7/97 600TT McGuire 2 4
W/D3 BWC 12/97 690TT St. Lucie 1 2
CE-67 BWC 1/98 690TT Byron 1 4
W/D4 BWC 1/98 690TT Braidwood 1 4
W/D4 BWC 11/98 690TT
SG Manufacturer/Model No. of Original Replacement Tube Plant Name Loops Date Material South Texas 1 4
W/E W/D94 5/00 690TT Farley 1 3
W/51 W/54F 5/00 690TT Cook 1 4
W/51 BWC 12/00 690TT ANO 2 2
CE/2815 W/D109 12/00 690TT Indian Point 2 4
W/44 W/44F 12/00 600TT Farley 2 3
W/51 W/54F 5/01 690TT Kewaunee 2
W/51 W/54F 12/01 690TT Harris 3
W/D4 W/D75 12/01 690TT Calvert Cliffs 1 2
CE BWC 6/02 690TT South Texas 2 4
W/E W/Delta 94 12/02 690TT Calvert Cliffs 2 2
CE BWC 5/03 690TT Sequoyah 1 4
W/51 ABB/Doosan 6/03 690TT Palo Verde 2 2
CE 80 ABB/Ansaldo 12/03 690TT' Oconee 1 2
B&W BWC 1/04 690TT Oconee 2 2
B&W BWC 6/04 690TT Prairie Island 1 2
W/51 Fr 56/19 11/04 690TT Oconee 3 2
B&W BWC 12/04 690TT Callaway 4
W/F Fr 73/19T 11/05 690TT ANO 1 2
B&W Framatome 12/05 690TT Palo Verde 1 2
CE 80 ABB/Ansaldo 12/05 690TT Bvr. Valley 1 3
W/51 W/54F 4/06 690TT Watts Bar 4
W/D3 ABB/Doosan 11/06 690TT Ft. Calhoun 2
CE Mitsubishi 12/06 690TT
J SG Manufacturer/Model No. of Original Replacement Tube Plant Name Loops Date Material Comanche Peak 4
W/D4 W/D76 4/07 690TT 1
St. Lucie 2 2
CE Framatome 1/08 690TT Palo Verde 3 2
CE ABB/Ansaldo 1/08 690TT Diablo Canyon 2 4
W/51 W/D54 4/08 690TT Salem 2 4
W/51 Framatome 5/08 690TT Diablo Canyon 1 4
W/51 W/D54 3/09 690TT
+
+
+
+
+
+ i
+
+
t
.1.
.~
h Updated 6/09 W=Westinghouse CE=Combustion Engineering BWC=Babcock and Wilcox Canada B&W=Babcock and Wilcox ABB=Asea Brown Boveri Fr=Framatome