ML100740156

From kanterella
Jump to navigation Jump to search
Radiation Work Permit
ML100740156
Person / Time
Site: Oyster Creek
Issue date: 03/20/2009
From:
- No Known Affiliation
To:
Office of Information Services
References
FOIA/PA-2009-0214
Download: ML100740156 (2)


Text

RADIATION WORK PERMIT FACILITY:

OC 1 YEAR:

09 RWP NUMBER:

00054 REVISION:

00 TYPE:

SPC LOCATION:

CWST CAA ELEVATION:

ROOM:

AREA:

TITLE:

CONDENSATE STORAGE TANK-CLEAN,DESLUDGE AND INSPECT CST INTERNALS INITIATED:

03/20/09 SCHEDULED START:

05/06/09 EXPECTED COMPLETE:

01/01/10 ALARA CATEGORY 0

PROTECTIVE CLOTHING AND RESPIRATORY PROTECTION REQUIREMENTS DOSIMETRY REQUIREMENTS EXTREMITY HANDS MULTIPLE DOSIMETRY:

EXTREMITY FEET RELOCATE DOSIMETRY:

ION CHA)

ALARMING DOSIMETER:

Y SET TO ALARM AT:

,j0MEM OR AT:(400 MEM/HR ADMINISTRATIVE / EXPOSURE CONTROL REQUIREMET' MINIMUM TEDE BALANCE OF (200 EM REQUIRED FOR ENTRY PRE-JOB MEETING REQUIRED Y

AUTO ENTRY/EXIT PERMITTED :

Y WORK ORDER NUMBER REQUIRED:

SIGNATURE CHECK AT SIGN-IN:

Y HEALTH PHYSICS COVERAGE AND MONITORING PERIOD SURVEY FREQ:

1 ROUTINE SURVE REQD-IF:

BREACH OF SYSTEM HP COVERAGE:

POSITIVE SPECIAL INSTRUCTIONS / REMARKS CONDENSATE STORAGE TANK-CLEAN,DESLUDGE AND INSPECT CST INTERNALS.

  • ALARA PLAN44 2009-054.ALL PERSONNEL TO READ AND COMPLY WTTH AlAR* PTAN
  • ALARA PLAN# 2009-054 ALL PERSONNEL TO READ AND COMPLY WITH AL.A:k-& PLAN
  • ALL PERSONNEL TO READ AND COMPLY WITH SAFETY PLAN AND RP-AN'-461)
  • KNOWLEDGE OF RAD CONDITIONS REQ'D PRIOR TO ENTRY INTO RCA vJY-9b< RPT ESCORT.
  • CONTAINMENT DEVICE WHEN REMOVING MANWAY AND WHERE POTENTIAL FOR LEAKS EXIST
  • SURVEY REOUIRED AT SYSTEM OPENING, AT UNDERWATER DIVE LOCATIONS, ON SLUDGE

.DRUMS AND PER RP.

DRUMS AND PER RP.

  • AIR SAMPLING PER RP-TO INCLUDE AIR SAMPLE OUTSIDE TANK WHEN MANWAY IS OPEN.
  • WORKERS SHALL WEAR DOSIMETRY SO THEIR EXPOSURE CAN BE MONITORED IN ANY RCA.
  • PC REQUIREMENTS PER RADIOLOGICAL POSTINGS OR PER RP.
  • TENT (ENCLOSURE)

SHALL BE CONSTRUCTED AT TANK OPENING AS PER ALARA PLAN.

  • SAFETY REQUIREMENTS PER NRP & CONFINED SPACE PERMIT.

(SPECIAL INSTRUCTIONS ARE CONTINUED ON NEXT PAGE)

APPROVALS

/

TERMINATION Name RAYMENT.J PREPARED BY WORK SUPERVISOR:

HP SUPERVISOR TERMINATED BY POST JOB REVIEW:

HAWKINS, MIKE
HEFFNER, ROBERT Date 03/20/09 05/06/09 05/06/09 Signatures

/k"

RADIATION WORK PERMIT FACILITY:

OC 1 YEAR:

09 RWP NUMBER:

00054 REVISION:

00 TYPE:

SPC LOCATION:

CWST CAA ELEVATION:

ROOM:

AREA:

TITLE:

CONDENSATE STORAGE TANK-CLEAN,DESLUDGE AND INSPECT CST INTERNALS SPECIAL INSTRUCTIONS/

REMARKS

  • WORKERS EXITING CST RCA ARE TO GO TO FRISK HANDS & FEET AND PROCEED TO NEAREST PCM/PM7 FOR MONITORING.
  • OE-JUST-IN-TIME OPERATING EXPERIENCE(OE-OE 8317,3302,&SER 36-85).

P TASK NBR 100 DESCRIPTION HP OTHER END OF WORK PERMIT REPORT