UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

March 10, 2010

Mr. Timothy J. OConnor

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - NOTIFICATION OF AN

NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST

FOR INFORMATION -- INSPECTION REPORT 05000263/2010003

Dear Mr. OConnor:

On April 26, 2010, the NRC will begin the on-site portion of the Triennial Heat Sink

Performance Inspection at your Monticello Nuclear Generating Plant. This inspection will be

performed in accordance with NRC baseline inspection procedure (IP) 71111.07. The onsite

portion of the inspection will take place on April 26 - 30, 2010.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than March 29, 2010. By

April 5, 2010, the inspector will communicate the initial selected set of approximately 2-3

risk significant heat exchangers.

The second group of documents requested is those items needed to support our in-office

preparation activities. This set of documents, including the calculations associated with

the selected heat exchangers, should be available at the Regional Office no later than

April 16, 2010. This information should be separated by each selected component,

especially if provided electronically (e.g., folder with component name that includes

calculations, condition reports, maintenance history, etc.). During the in-office preparation

activities, the inspector may identify additional information needed to support the

inspection.

The last group includes the additional information above, as well as, plant specific

reference material. This information should be available to the inspector by the first day of

the onsite inspection, April 26, 2010. It is also requested that corrective action documents

and/or questions developed during the inspection be provided to the inspector as the

documents are generated.

T. OConnor

-2-

The lead inspector for this inspection is Mr. Gerard ODwyer. We understand that our regulatory

contact for this inspection is Mr. Ronald N. Baumer of your organization. If there are questions

about the inspection or material requested, please contact the lead inspector at (630) 829-9624

or via email gerard.odwyer@nrc.gov.

It is important that these documents be as complete as possible, in order to minimize the

number of documents requested during the preparation week, or during the onsite inspection. A

hard-copy with the required information is also an acceptable option.

All requested documents are to be within the time period from the onsite inspection back to the

documents that were provided in response to the previous heat sink performance inspection. If

no activities were accomplished in that time period, then the request applies to the last

applicable documents in the previous time period.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Jamie Benjamin, Acting Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263;

License No. DRP-22

Enclosure: TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

cc w/encl: Distribution via ListServ

TRIENNIAL HEAT SIK PERFORMANCE INSPECTION DOCUMENT REQUEST

Inspection Report: 05000263/2010003

Inspection Dates:

April 26 - 30, 2010 Inspection week

Inspection Procedure:

IP 71111.07, Heat Sink Performance

Lead Inspector:

Gerard ODwyer

(630) 829-9624

Gerard.Odwyer@nrc.gov

I.

Information Requested By March 29, 2010

1.

List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2.

Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3.

List of corrective action program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous three years or since the last corrective action

program document list was sent to the NRC for the previous heat sink performance

inspection. The list should include all corrective action program documents not on

the last corrective action program document list.

4.

Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5.

Last two system health report(s) and maintenance rule system notebooks for all the

GL 89-13 heat exchangers.

6.

List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be for

the time period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

7.

List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers. The requested documents are to be for the time

period from the onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

Enclosure

1

TRIENNIAL HEAT SIK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

2

2. Information Requested By April 16, 2010

1.

Copy of the UFSAR section applicable to the GL 89-13 Heat Exchanger Program.

2.

Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

3.

For the specific heat exchangers selected:

a. Copies of the Updated Final Safety Analysis Report (UFSAR) sections applicable

for each heat exchanger;

b. Copy of system description and design basis document for the heat exchangers

(as applicable);

c. Provide a list of calculations (with a short description) which currently apply to

each heat exchanger; and

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

4.

For the ultimate heat sink (UHS) and the safety-related service water system

(or equivalent):

a. Copies of the applicable Updated Final Safety Analysis Report (UFSAR)

sections;

b. Copy of system description and design basis document (as applicable);

c. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system; and

d. Copy of the document (e.g. UFSAR or Technical Requirements Manual) that

states the maximum cooling water system inlet temperature limit that still allows

full licensed power operation of the nuclear reactor.

5.

A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related plant heat exchanger to be performed during the on-site portion of the

inspection.

3. Information Requested to be Available on First Day of Inspection, April 26, 2010

1.

For the specific heat exchangers selected:

a. Copy of the calculation which correlates surveillance testing results from these

heat exchangers with design basis heat removal capability (e.g., basis for

surveillance test acceptance criteria);

TRIENNIAL HEAT SIK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

3

b. Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers which are performance tested;

c. Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests;

d. Information regarding any alarms which monitor on-line performance;

e. Copy of the document describing the inspection results of each heat exchanger;

f.

The cleaning and inspection maintenance schedule for each heat exchanger for

the next 5 years;

g. Copy of the design specification and heat exchanger data sheets for each heat

exchanger;

h. Copy of the vendor manuals including component drawings for each heat

exchanger;

i.

Copy of the calculation which establishes the limiting (maximum) design basis

heat load which is required to be removed by each of these heat exchangers;

j.

Copy of the operating procedure that ensures that the maximum cooling water

system inlet temperature limit is not exceeded;

k. Copy of the calculations or documents which evaluate the potential for water

hammer in each heat exchanger or associated piping;

l.

Copy of the calculations that evaluate excessive tube vibration in each heat

exchanger and the documents that describe the controls that prevent heat

exchanger degradation due to excessive flow induced vibration during operation;

m. Copy of the periodic flow testing at or near maximum design flow. The requested

documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink

performance inspection;

n. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger;

o. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger;

p. Copies of the documents that verify the structural integrity of the heat exchanger

(e.g. eddy current summary sheets, ultrasonic testing results, and visual

inspection results);

TRIENNIAL HEAT SIK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

4

q. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers;

4.

For the review of the operation of the safety-related service water system (or

equivalent) and the UHS:

1.

Copies of any design change performed on the UHS. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink performance

inspection.

2.

Copies of any design change performed on the safety-related service water

system. The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response to the

previous heat sink performance inspection.

3.

Copies of procedures for a loss of UHS.

4.

Copies of procedures for a loss of service water system.

5.

Inspections and/or maintenance related to preventing macrofouling (e.g. silt,

dead mussel shells, or debris) and biotic fouling (e.g. fish, algae, grass, or kelp).

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

6.

Copies of chemistry procedures that monitor for pH, calcium hardness, etc. Also,

provide copies of the associated results. The requested documents are to be for

the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection.

7.

Copies of documents associated with the monitoring of pump performance for

potential strong-pump vs. weak-pump interaction.

5.

For the review associated with the system walkdown of the Closed Cooling

Water System :

1.

Copies of the testing, inspection, or monitoring program procedures for buried or

inaccessible piping and the associated results. The requested documents are to

be for the time period from the onsite inspection period back to the documents

that were provided in response to the previous heat sink performance inspection.

2.

Copies of the ultrasonic test results and/or visual inspections that verify the

structural integrity of the piping.

3.

Copies of the procedures to monitor assess, and disposition active through wall

pipe leaks, including structural evaluations and/or planned corrective actions.

TRIENNIAL HEAT SIK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

5

4.

History of any thru wall pipe leak on the system. The requested documents are

to be for the time period from the onsite inspection period back to the documents

that were provided in response to the previous heat sink performance inspection.

5.

Copies of the documents associated with the periodic inspection program used to

detect protective coating failure, corrosion, and erosion.

6.

Copies of the IST vibration monitoring results and operational history for deep

draft vertical pumps, if applicable. The requested documents are to be for the

time period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

If the information requested above will not be available, please contact Mr. ODwyer as soon as

possible at (630) 829-9624 or email at Gerard.Odwyer@nrc.gov.

T. OConnor

-2-

The lead inspector for this inspection is Mr. Gerard ODwyer. We understand that our regulatory contact

for this inspection is Mr. Ronald N. Baumer of your organization. If there are questions about the

inspection or material requested, please contact the lead inspector at (630) 829-9624 or via email

gerard.odwyer@nrc.gov.

It is important that these documents be as complete as possible, in order to minimize the number of

documents requested during the preparation week, or during the onsite inspection. A hard-copy with the

required information is also an acceptable option.

All requested documents are to be within the time period from the onsite inspection back to the

documents that were provided in response to the previous heat sink performance inspection. If no

activities were accomplished in that time period, then the request applies to the last applicable documents

in the previous time period.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a currently

valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the

NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Jamie Benjamin, Acting Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-263;

License No. DRP-22

Enclosure:

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

cc w/encl: Distribution via ListServ

Distribution:

See Next Page

DOCUMENT NAME: G:\\DRS\\Work in Progress\\Ltr. 031010 Monitcello HS RFI MAJ.doc

9 Publicly Available

9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive

To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy

OFFICE

RIII

RIII

NAME

MJones:ls

JBenjamin

DATE

03/10/10

03/10/10

OFFICIAL RECORD COPY

Letter to Mr. Timothy OConnor from Mr. Jamie Benjamin dated March 10, 2010.

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR

INFORMATION -- INSPECTION REPORT 05000263/2010003

DISTRIBUTION:

Susan Bagley

RidsNrrDorlLpl3-1 Resource

RidsNrrPMMonticello

RidsNrrDirsIrib Resource

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

ROPreports Resource