ML100570170
| ML100570170 | |
| Person / Time | |
|---|---|
| Site: | Oconee, Mcguire, Catawba, McGuire |
| Issue date: | 02/24/2010 |
| From: | Brandi Hamilton Duke Energy Carolinas, Duke Energy Corp |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML100570170 (17) | |
Text
10 CFR 26.717 Bruce Hamilton Duke Vice President, Nuclear Operations
ýýEnergy Nuclear Generation Duke Energy Corporation 526 South Church Street Charlotte, NC 28202 Mailing Address:
P.O. Box 1006 ECO7H February 24, 2010 Charlotte, NC 28201-1006 704-382-3877 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Bruce. Hamilton@duke-energy.com Washington, DC 20555-001
Subject:
Duke Energy Carolinas, LLC (Duke)
Oconee Nuclear Station Units 1, 2, and 3 Docket Nos. 50-269/270/287 McGuire Nuclear Station Units 1 and 2 Docket Nos. 50-369/370 Catawba Nuclear Station Units 1 and 2 Docket Nos. 50-413/414 Fitness-For-Duty Program Performance Data Reports Pursuant to 10 CFR 26.717 Duke hereby submits the consolidated Fitness-For-Duty Program Performance Data Reports for Oconee, McGuire, and Catawba Nuclear Stations and the Nuclear General Office. The reporting period covered by this submittal is January 1, 2009 through December 31, 2009.
Based on quantitative analysis accumulated from the drug and alcohol screening results which are recorded and maintained in Duke's Fitness for Duty database, this data is considered to be complete, accurate and consistent with industry and Duke program expectations.
This correspondence contains no regulatory commitments. Questions regarding these reports should be directed to P.R. Fowler at 704-382-6188 or T. J. Wadsworth at (704) 382-5836.
Sincerely, Bruce H. Hamilton Attachments www.dukepower.com
10 CFR 26.717 U. S. Nuclear Regulatory Commission February 24, 2010 Page 2 xc:
L. A. Reyes, Region II Administrator U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth St., SW Suite 23T85 Atlanta, GA 30303-8931 J. F. Stang, Jr., Senior Project Manager (ONS)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738.
J. H. Thompson, Project Manager (CNS & MNS)
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 A. T. Sabisch NRC Senior Resident Inspector Oconee Nuclear Station J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station G. A. Hutto, III NRC Senior Resident Inspector Catawba Nuclear Station
Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Duke Energy Carolinas, LLC (Duke)
Company Catawba Nuclear Station Location Anita Barnette 01/01/09 - 12/31/09 Period (704) 382-4904 Cutoffs:
Marijua Cocaine Opiates Contact Name Screen/Confirmation (ng/ml) na
/
/
Phone (Include area code)
Appendix A to 10 CFR 26 Amphetamines Phencyclidine Alcohol (%BAC)
/
/
/
Long-Term Testing Results Licensee Employees Contractor Personnel Average Number with 1285 Unescorted Access Categories
- Tested
- Positive
- Tested
- Positive
- Pre-Access 144 0
For Cause - Post 8
0 Accident For Cause - Observed 3
0 Behavior Random 714 1
Follow-up 29 0
Other 3
1 Total 901 2
Short-Term Contractor Personnel 792
- Tested
- Positive 1584 11 10 0
6 0
463 2
15 0
3 0
2081 13 Rev. 1/92
Breakdown of Confirmed Positive Tests for Specific Substances - Catawba Nuclear Station (for reporting period 01/01/09 - 12/31/09)
A
- Refusals to Test numbers are included in the "Breakdown of Confirmed Positive Tests" therefore, there may be a difference between the Total Positive tests on the first page of this report and this page.
Attachment A Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 (for Catawba Nuclear Station) for period 01/01/09 - 12/31/09 Summary of Management Actions:
(Include initiatives taken, lessons learned, effectiveness evaluation, etc. as appropriate.)
General Note:
Duke randomly tests at a rate of at least 50% of the pool population.
Summary Listing of Events Reported Under 10 CFR 26.719(b):
Date of Position of How Discovered Substance Management Actions Taken Event Individual Detected Involved None during this reporting period
WORKER FATIGUE
SUMMARY
Duke Energy - Catawba Nuclear Station Period: 10/01/09 - 12/31/09 Duke Energy-Catawba Nuclear Station had no Fatigue Waivers created in 2009. All Fatigue Assessments that were performed were based on either "Post Event" or "For Cause" issues. Fatigue was not found to be a contributing event in any of the assessments performed.
Category Post Event For Cause
- of assessments 4
1 Total 5
Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Duke Energy Carolinas, LLC (Duke) 01/01/09 - 12/31/09 Company Period McGuire Nuclear Station Location Anita Barnette Contact Name Cutoffs: Screen/Confirmation (ng/ml)
(704) 382-4904 Phone (Include area code)
[
Appendix A to 10 CFR 26 Marijuana Cocaine Opiates
/
/
/
Amphetamines Phencyclidine Alcohol (%BAC)
/
/
Long-Term Testing Results Licensee Employees Contractor Personnel Average Number with 1401 Unescorted Access Categories
- Tested
- Positive
- Tested
- Positive
- Pre-Access 174 0
For Cause - Post 2
0 Accident For Cause - Observed 1
0 Behavior Random 735 1
Follow-up 32 0
Other 2
0 Total 946 1
Short-Term Contractor Personnel 547
- Tested
- Positive 1376 10 7
0 10 5
357 1
9 0
1 0
1760 17 Rev. 1/92
Breakdown of Confirmed Positive Tests for Specific Substances - McGuire Nuclear Station (for reporting period 01/01/09 - 12/31/09)
A
- Refusals to Test numbers are included in the "Breakdown of Confirmed Positive Tests"; therefore, there may be a difference between the Total Positive tests on the first page of this report and this page.
Attachment A Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 (for McGuire Nuclear Station) for period 01/01/09 - 12/31/09 Summary of Management Actions:
(Include initiatives taken, lessons learned, effectiveness evaluation, etc. as appropriate.)
General Note:
Duke randomly tests at a rate of at least 50% of the pool population.
Summary Listing of Events Reported Under 10 CFR 26.719(b):
Date of Position of How Discovered Substance Management Actions Taken Event Individual Detected Involved None during this reporting period
WORKER FATIGUE
SUMMARY
Duke Energy - McGuire Nuclear Station Period: 10/01/09 - 12/31/09 Duke Energy-McGuire Nuclear Station had no Fatigue Waivers created in 2009. All Fatigue Assessments that were performed were based on either "Post Event" or "For Cause" issues. Fatigue was not found to be a contributing event in any of the assessments performed.
Category
- of assessments Post Event For Cause 2
2 Total 4
Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Duke Energy Carolinas, LLC (Duke) 01/01/09 - 12/31/09 Company Oconee Nuclear Station Period L
Cutoffs:
Marijua Cocaine Opiates An ocation ita Barnette (704) 382-4904 Contact Name Screen/Confirmation (ng/ml) na
/
/
Phone (Include area code)
Appendix A to 10 CFR 26 Amphetamines Phencyclidine Alcohol (%BAC)
/
/
/
Long-Term Testing Results Licensee Employees Contractor Personnel Average Number with 1433 Unescorted Access Categories
- Tested
- Positive
- Tested
- Positive
- Pre-Access 136 0
For Cause - Post 5
0 Accident For Cause - Observed 3
0 Behavior Random 724 1
Follow-up 23 0
Other 1
0 Total 892 1
Short-Term Contractor Personnel 1605
- Tested
- Positive 1999 12 12 1
6 2
811 5
23 1
7 0
2858 21 Rev. 1/92
Breakdown of Confirmed Positive Tests for Specific Substances - Oconee Nuclear Station (for reporting period 01/01/09 - 12/31/09)
A
- Refusals to Test numbers are included in the "Breakdown of Confirmed Positive Tests"; therefore, there may be a difference between the Total Positive tests on the first page of this report and this page.
Attachment A Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 (for Oconee Nuclear Station) for period 01/01/09 - 12/31/09 Summary of Management Actions:
(Include initiatives taken, lessons learned, effectiveness evaluation, etc. as appropriate.)
General Note:
Duke randomly tests at a rate of at least 50% of the pool population.
Summary Listing of Events Reported Under 10 CFR 26.719(b):
Date of Position of How Discovered Substance Management Actions Taken Event Individual Detected Involved None during this reporting period
WORKER FATIGUE
SUMMARY
Duke Energy - Oconee Nuclear Station Period: 10/01/09 - 12/31/09 Duke Energy-Oconee Nuclear Station had no Fatigue Waivers created in 2009. All Fatigue Assessments that were performed were based on either "Post Event" or "For Cause" issues. Fatigue was not found to be a contributing event in any of the assessments performed.
Category
- of assessments Post Event For Cause 3
1 Total 4
Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Duke Energy Carolinas, LLC (Duke) 01/01/09 - 12/31/09 Company Charlotte General Office Period Location Anita Barnette Contact Name Screen/Confirmation (ng/ml) na
/
/
(704) 382-4904 Cutoffs:
Marijua Cocaine Opiates Phone (Include area code)
Appendix A to 10 CFR 26 Amphetamines Phencyclidine Alcohol (%BAC)
/
/
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access Categories
- Tested
- Positive
- Tested
- Positive
- Pre-Access 50 0
For Cause - Post 0
0 Accident For Cause - Observed 0
0 Behavior Random 276 0
Follow-up 0
0 Other 0
0 Total 326 0
- Tested
- Positive 11 (1) 0 0
0 0
0 0
0 0
0 0
0 11(1) 0 Rev. 1/92
Breakdown of Confirmed Positive Tests for Specific Substances - Charlotte General Office (for reporting period 01/01/09 - 12/31/09)
Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal 1
2 3
4 tamines clidine To Test*
Licensee Employees Long-Term Contractors Short-Term Contractors 0
0 0
0 0
0 0
0 0
0 0
0 0
0 Total 0
0 0
0 0
0 0It A
- Refusals to Test numbers are included in the "Breakdown of Confirmed Positive Tests"; therefore, there may be a difference between the Total Positive tests on the first page of this report and this page.
Attachment A Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 (for Charlotte General Office) for period 01/01/09 - 12/31/09 Summary of Management Actions:
(Include initiatives taken, lessons learned, effectiveness'evaluation, etc. as appropriate.)
General Note:
Duke randomly tests at a rate of at least 50% of the pool population.
Note (1):
Duke approved the Pre-Access Testing portion of Westinghouse's Fitness for Duty Program effective August 3, 1999.
The 11 Pre-Access screens reported under "Short Term Contractor Personnel" are being reported with Duke's performance data as a result of accepting Westinghouse's program.
Summary Listing of Events Reported Under 10 CFR 26.719(b):
Date of Position of How Discovered Substance Management Actions Taken Event Individual Detected Involved None during this reporting period