Developmental Revision B - Technical Specifications 3.1 - Reactivity Control Systems
ML100550449
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/02/2010
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML100550449 (21)


Text

SDM - Tavg > 200°F 3.1.1 3.1 REACTIVITY CONTROL SYSTEMS 3.1.1 SHUTDOWN MARGIN (SDM) - Tavg > 200°F LCO 3.1.1 SDM shall be > 1.6% k/k.

APPLICABILITY: MODE 2 with keff < 1.0, MODES 3 and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. SDM not within limit. A.1 Initiate boration to restore 15 minutes SDM to within limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify SDM is > 1.6% k/k. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Watts Bar - Unit 2 3.1-1 (developmental) A

SDM - Tavg < 200°F 3.1.2 3.1 REACTIVITY CONTROL SYSTEMS 3.1.2 SHUTDOWN MARGIN (SDM) - Tavg < 200°F LCO 3.1.2 The SDM shall be 1.0% k/k.

APPLICABILITY: MODE 5.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. SDM not within limit. A.1 Initiate boration to restore 15 minutes SDM to within limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.2.1 Verify SDM is 1.0% k/k. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Watts Bar - Unit 2 3.1-2 (developmental) A

Core Reactivity 3.1.3 3.1 REACTIVITY CONTROL SYSTEMS 3.1.3 Core Reactivity LCO 3.1.3 The measured core reactivity shall be within +/- 1% k/k of predicted values.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Measured core reactivity A.1 Re-evaluate core design 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> not within limit. and safety analysis, and determine that the reactor core is acceptable for continued operation.

AND A.2 Establish appropriate 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> operating restrictions and SRs.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

Watts Bar - Unit 2 3.1-3 (developmental) A

Core Reactivity 3.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.3.1 ------------------------------NOTE-------------------------------

The predicted reactivity values may be adjusted (normalized) to correspond to the measured core reactivity prior to exceeding a fuel burnup of 60 effective full power days (EFPD) after each fuel loading.

Verify measured core reactivity is within +/- 1% k/k of Once prior to predicted values. entering MODE 1 after initial fuel loading and each refueling AND


NOTE---------

Only required after 60 EFPD 31 EFPD thereafter Watts Bar - Unit 2 3.1-4 (developmental) A

MTC 3.1.4 3.1 REACTIVITY CONTROL SYSTEMS 3.1.4 Moderator Temperature Coefficient (MTC)

LCO 3.1.4 The MTC shall be maintained within the limits specified in the COLR. The maximum upper limit shall be 0 k/k°F at hot zero power.

APPLICABILITY: MODE 1 and MODE 2 with keff 1.0 for the upper MTC limit, MODES 1, 2, and 3 for the lower MTC limit.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. MTC not within upper limit. A.1 Establish administrative 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> withdrawal limits for control banks to maintain MTC within limit.

B. Required Action and B.1 Be in MODE 2 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time keff < 1.0.

of Condition A not met.

C. MTC not within lower limit. C.1 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Watts Bar - Unit 2 3.1-5 (developmental) A

MTC 3.1.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.4.1 Verify MTC is within upper limit Once prior to entering MODE 1 after initial fuel loading and each refueling SR 3.1.4.2 Verify MTC is within 300 ppm Surveillance limit ----------NOTE---------

specified in the COLR. Not required to be performed until 7 effective full power days (EFPD) after reaching the equivalent of an equilibrium RTP all rods out (ARO) boron concentration of 300 ppm Once each cycle SR 3.1.4.3 -------------------------------NOTES---------------------------- ----------NOTE---------

1. If the MTC is more negative than the 300 ppm Not required to be Surveillance limit (not LCO limit) specified in the performed until COLR, SR 3.1.4.3 shall be repeated once per 7 EFPD after reaching the 14 EFPD during the remainder of the fuel cycle. equivalent of an equilibrium
2. SR 3.1.4.3 need not be repeated if the MTC RTP-ARO boron measured at the equivalent of equilibrium concentration of RTP-ARO boron concentration of < 60 ppm is 300 ppm less negative than the 60 ppm Surveillance limit ---------------------------

specified in the COLR.

Verify MTC is within lower limit. Once each cycle Watts Bar - Unit 2 3.1-6 (developmental) A

Rod Group Alignment Limits 3.1.5 3.1 REACTIVITY CONTROL SYSTEMS 3.1.5 Rod Group Alignment Limits LCO 3.1.5 All shutdown and control rods shall be OPERABLE, with all individual indicated rod positions within 12 steps of their group step counter demand position.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more rod(s) A.1.1 Verify SDM is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> untrippable. 1.6% k/k.

OR A.1.2 Initiate boration to restore 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SDM to within limit.

AND A.2 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> B. One rod not within B.1 Restore rod to within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> alignment limits. alignment limits.

OR B.2.1.1 Verify SDM is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 1.6% k/k.

OR B.2.1.2 Initiate boration to restore 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SDM to within limit.

AND (continued)

Watts Bar - Unit 2 3.1-7 (developmental) A

Rod Group Alignment Limits 3.1.5 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2.2 Reduce THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> POWER to < 75% RTP.

AND B.2.3 Verify SDM is Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 1.6% k/k.

AND B.2.4 Perform SR 3.2.1.1. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND B.2.5 Perform SR 3.2.2.1. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND B.2.6 Re-evaluate safety 5 days analyses and confirm results remain valid for duration of operation under these conditions C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B not met.

D. More than one rod not D.1.1 Verify SDM is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> within alignment limit. 1.6% k/k.

OR D.1.2 Initiate boration to restore 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> required SDM to within limit.

AND D.2 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Watts Bar - Unit 2 3.1-8 (developmental) A

Rod Group Alignment Limits 3.1.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify individual rod positions within alignment limit. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND Once within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> thereafter when the rod position deviation monitor is inoperable SR 3.1.5.2 Verify rod freedom of movement (tripability) by 92 days moving each rod not fully inserted in the core 10 steps in either direction.

SR 3.1.5.3 Verify rod drop time of each rod, from the fully Prior to reactor withdrawn position, is < 2.7 seconds from the criticality after initial beginning of decay of stationary gripper coil voltage fuel loading and to dashpot entry, with: each removal of the reactor head

a. Tavg 551°F; and
b. All reactor coolant pumps operating.

Watts Bar - Unit 2 3.1-9 (developmental) A

Shutdown Bank Insertion Limits 3.1.6 3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Shutdown Bank Insertion Limits LCO 3.1.6 Each shutdown bank shall be within insertion limits specified in the COLR.

APPLICABILITY: MODE 1, MODE 2 with any control bank not fully inserted.


NOTE--------------------------------------------

This LCO is not applicable while performing SR 3.1.5.2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more shutdown A.1.1 Verify SDM is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> banks not within limits. 1.6% k/k.

OR A.1.2 Initiate boration to restore 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SDM to within limit.

AND A.2 Restore shutdown banks 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to within limits.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

Watts Bar - Unit 2 3.1-10 (developmental) A

Shutdown Bank Insertion Limits 3.1.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify each shutdown bank is within the limits 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> specified in the COLR Watts Bar - Unit 2 3.1-11 (developmental) A

Control Bank Insertion Limits 3.1.7 3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 Control Bank Insertion Limits LCO 3.1.7 Control banks shall be within the insertion, sequence, and overlap limits specified in the COLR APPLICABILITY: MODE 1, MODE 2 with keff 1.0.


NOTE--------------------------------------------

This LCO is not applicable while performing SR 3.1.5.2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Control bank insertion limits A.1.1 Verify SDM is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> not met. 1.6% k/k.

OR A.1.2 Initiate boration to restore 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SDM to within limit.

AND A.2 Restore control bank(s) to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> within limits.

(continued)

Watts Bar - Unit 2 3.1-12 (developmental) A

Control Bank Insertion Limits 3.1.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Control bank sequence or B.1.1 Verify SDM is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> overlap limits not met. 1.6% k/k.

OR B.1.2 Initiate boration to restore 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SDM to within limit.

AND B.2 Restore control bank 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> sequence and overlap to within limits.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.1 Verify estimated critical control bank position is within Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior the limits specified in the COLR. to achieving criticality (continued)

Watts Bar - Unit 2 3.1-13 (developmental) A

Control Bank Insertion Limits 3.1.7 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.1.7.2 Verify each control bank insertion is within the limits 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> specified in the COLR.

AND Once within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> thereafter when the rod insertion limit monitor is inoperable SR 3.1.7.3 Verify sequence and overlap limits specified in the 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> COLR are met for control banks not fully withdrawn from the core.

Watts Bar - Unit 2 3.1-14 (developmental) A

Rod Position Indication 3.1.8 3.1 REACTIVITY CONTROL SYSTEMS 3.1.8 Rod Position Indication LCO 3.1.8 The Analog Rod Position Indication (ARPI) System and the Demand Position Indication System shall be OPERABLE.

APPLICABILITY: MODES 1 and 2 ACTIONS


NOTE----------------------------------------------------------

Separate Condition entry is allowed for each inoperable rod position indicator per group and each demand position indicator per bank.

CONDITION REQUIRED ACTION COMPLETION TIME


NOTE----------------- A.1 Verify the position of the Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Rod position monitoring by rods with inoperable Required Actions A.2.1 and position indicators by A.2.2 may only be applied to using the PDMS.

one inoperable ARPI and shall only be allowed: (1) until the OR end of the current cycle, or (2) until an entry into MODE 5 A.2.1 Verify the position of the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of sufficient duration, whichever rod with the inoperable occurs first, when the repair of position indicator by using AND the inoperable ARPI can safely the PDMS.

be performed. Required Once every 31 days Actions A.2.1, A.2.2 and A.2.3 thereafter shall not be allowed after the AND plant has been in MODE 5 or other plant condition, for a sufficient period of time, in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, if rod control which the repair of the system parameters inoperable ARPI could have indicate unintended safely been performed. movement A. One ARPI per group AND inoperable for one or more groups.

(continued)

Watts Bar - Unit 2 3.1-15 (developmental) B

Rod Position Indication 3.1.8 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2.2 Review the parameters of 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> the rod control system for indications of unintended AND rod movement for the rod with an inoperable Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> position indicator. thereafter AND A.2.3 Verify the position of the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, if the rod rod with an inoperable with an inoperable position indicator by using position indicator is the PDMS. moved greater than 12 steps.

AND Prior to increasing THERMAL POWER above 50% RTP and within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of reaching 100% RTP OR A.3 Reduce THERMAL 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> POWER to less than or equal to 50% RTP.

B. One or more rods with B.1 Verify the position of the 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable position rods with inoperable indicators have been moved position indicators by in excess of 24 steps in one using the PDMS.

direction since the last determination of the rod's OR position.

B.2 Reduce THERMAL 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> POWER to less than or equal to 50% RTP.

(continued)

Watts Bar - Unit 2 3.1-16 (developmental) B

Rod Position Indication 3.1.8 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. One demand position C.1.1 Verify by administrative Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> indicator per bank means all ARPIs for the inoperable for one or more affected banks are banks. OPERABLE.

AND C.1.2 Verify the most withdrawn Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> rod and the least withdrawn rod of the affected banks are less than or equal to 12 steps apart.

OR C.2 Reduce THERMAL 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> POWER to less than or equal to 50% RTP.

D. Required Action and D.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.8.1 Verify each ARPI agrees within 12 steps of the group 18 months demand position for the full indicated range of rod travel.

Watts Bar - Unit 2 3.1-17 (developmental) A

PHYSICS TESTS Exceptions - MODE 1 3.1.9 3.1 REACTIVITY CONTROL SYSTEMS 3.1.9 PHYSICS TESTS Exceptions - MODE 1 LCO 3.1.9 During the performance of PHYSICS TESTS, the requirements of LCO 3.1.5, "Rod Group Alignment Limits";

LCO 3.1.6, "Shutdown Bank Insertion Limits";

LCO 3.1.7, "Control Bank Insertion Limits";

LCO 3.2.3, "AXIAL FLUX DIFFERENCE (AFD)"; and LCO 3.2.4, "QUADRANT POWER TILT RATIO (QPTR)"

may be suspended, provided:

a. THERMAL POWER is maintained 85% RTP;
b. Power Range Neutron Flux - High trip setpoints are 10% RTP above the THERMAL POWER at which the test is performed, with a maximum setting of 90% RTP; and
c. SDM is 1.6% k/k.

APPLICABILITY: MODE 1 during PHYSICS TESTS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. SDM not within limit. A.1 Initiate boration to restore 15 minutes SDM to within limit.

AND A.2 Suspend PHYSICS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TESTS exceptions.

(continued)

Watts Bar - Unit 2 3.1-18 (developmental) A

PHYSICS TESTS Exceptions - MODE 1 3.1.9 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. THERMAL POWER not B.1 Reduce THERMAL 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> within limit. POWER to within limit.

OR B.2 Suspend PHYSICS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TESTS exceptions C. Power Range Neutron C.1 Restore Power Range 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Flux - High trip setpoints Neutron Flux - High trip

> 10% RTP above the setpoints to 10% above PHYSICS TEST power the PHYSICS TEST level. power level, or to 90% RTP, whichever is OR lower.

Power Range Neutron OR Flux - High trip setpoints

> 90% RTP. C.2 Suspend PHYSICS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TESTS exceptions.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.9.1 Verify THERMAL POWER is 85% RTP. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SR 3.1.9.2 Verify Power Range Neutron Flux - High trip Within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior setpoints are 10% above the PHYSICS TESTS to initiation of power level, and 90% RTP. PHYSICS TESTS SR 3.1.9.3 Perform SR 3.2.1.1 and SR 3.2.2.1. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.1.9.4 Verify SDM is 1.6% k/k. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Watts Bar - Unit 2 3.1-19 (developmental) A

PHYSICS TESTS Exceptions - MODE 2 3.1.10 3.1 REACTIVITY CONTROL SYSTEMS 3.1.10 PHYSICS TESTS Exceptions - MODE 2 LCO 3.1.10 During the performance of PHYSICS TESTS, the requirements of LCO 3.1.4, "Moderator Temperature Coefficient (MTC)";

LCO 3.1.5, "Rod Group Alignment Limits";

LCO 3.1.6, "Shutdown Bank Insertion Limits";

LCO 3.1.7, "Control Bank Insertion Limits"; and LCO 3.4.2, "RCS Minimum Temperature for Criticality" may be suspended, and the number of required channels for LCO 3.3.1, RTS Instrumentation, Functions 2, 3, 6, and 16.e, may be reduced to 3 required channels provided:

a. RCS lowest loop average temperature is 541°F; and
b. SDM is 1.6% k/k.

APPLICABILITY: MODE 2 during PHYSICS TESTS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. SDM not within limit. A.1 Initiate boration to restore 15 minutes SDM to within limit.

AND A.2 Suspend PHYSICS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TESTS exceptions.

B. THERMAL POWER not B.1 Open reactor trip Immediately within limit. breakers.

(continued)

Watts Bar - Unit 2 3.1-20 (developmental) A

PHYSICS TESTS Exceptions - MODE 2 3.1.10 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. RCS lowest loop average C.1 Restore RCS lowest loop 15 minutes temperature not within limit. average temperature to within limit.

D. Required Action and D.1 Be in MODE 3. 15 minutes associated Completion Time of Condition C not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.10.1 Perform a CHANNEL OPERATIONAL TEST on Prior to initiation of power range and intermediate range channels per PHYSICS TESTS SR 3.3.1.7, SR 3.3.1.8, and Table 3.3.1-1.

SR 3.1.10.2 Verify the RCS lowest loop average temperature is 30 minutes 541°F.

SR 3.1.10.3 Verify SDM is 1.6% k/k. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Watts Bar - Unit 2 3.1-21 (developmental) A