Information Available for NRC Review and Setpoint Methodology for Protection Systems
ML100540143
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/05/2010
From: Bajestani M
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML100540143 (9)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 February 5, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391

Subject:

Watts Bar Nuclear Plant (WBN) Unit 2 - Information Available For NRC Review and Setpoint Methodology for Protection Systems During a meeting with NRC staff and TVA on January 13, 2010, NRC requested the opportunity to-review several Westinghouse proprietary documents related to the Common Q Post-Accident Monitoring System. Enclosure 1 lists the documents available for NRC review at the Westinghouse Rockville office. provides the Westinghouse Setpoint Methodology for Protection Systems (WCAP-17044). Attachment 1 to Enclosure 2 contains information proprietary to Westinghouse.

Accordingly, Attachment 2 to Enclosure 2 includes the Westinghouse Application for Withholding Proprietary Information from Public Disclosure with an accompanying affidavit signed by Westinghouse, the owner of the information. The affidavit provides the basis for withholding the information from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR § 2.390. TVA requests that the Westinghouse proprietary information be withheld from public disclosure in accordance with 10 CFR § 2.390. to Enclosure 2 provides the non-proprietary version of the Westinghouse Setpoint Methodology.

Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 February 5, 2010 There are no new commitments contained in this letter. If you have any questions, please contact me at (423) 365-2351.

Sincerely, Masoud B31a~ani Watts Bar it 2 Vice President

Enclosures:

1. List of Westinghouse Available Information
2. Westinghouse Setpoint Methodology for Protection Systems (Proprietary and Non-Proprietary versions enclosed) cc (Enclosures):

U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

Enclosure I List of Westinghouse Available Information

OWestinghouse Mr. Larry Bond Tennessee Valley Authority Watts Bar Nuclear Plant P 0 Box 2000 Spring City, TN 37381

)

Westinghouse Electric Corn pany Nuclear Services P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA WBT-D-1564.

Date: February 3, 2010 Response Required: None Ref Contract No: 65717 In Response To: N/A CWA: WEST-WBT-2008-012 WBS: 3.1.1 P3 Activity # N/A Originator: Andrew Drake TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT UNIT 2 NRC Access to Common 0 Documents at the Westinghouse Rockville Office Reference

1. WBT-D-1526, NRC Access to Common Q Documents at the Westinghouse Rockville Office, January 28, 2010

Dear Mr. Bond:

This letter re-issues Reference 1 as a non-proprietary letter as request by Mr. Steve Hilmes (TVA) such that the letter can be provided to the US Nuclear Regulatory Commission (USNRC).

At the. January 13, 2010 NRC meeting with TVA on I&C licensing the NRC requested the opportunity to review several Westinghouse proprietary documents related to the Common Q PAMS to determine if these documents should be submitted by TVA for licensing review or be auditable documents.

The following table lists the documents that are available at this time as discussed at the meeting and are available for the NRC to review at the Westinghouse Rockville office at 12300 Twinbrook Parkway, Suite #330, Rockville, MD. The documents will not be provided to TVA. The NRC can make arrangements to view these documents by contacting Ms. Leslie Collins at 301-881-7040 (e-mail: collinlj@westinghouse.com).

Commercial tirade Dedication Report for the QNX Operating System for Common Q Applications 00000-ICE-37722 00 00000-iCE-37722 (Rev 00).pdf Design and Life Cycle Evaluation Report On Pre-Developed Software in ABB AC160, I/O GKWF700777 2

GKWF700777 Rev 2.pdf Modules and Tools Generic Operating History Evaluation Report on Pre-Developed Software in ABB GKWF800778 2

GKWF800778 rev 2.pdf AC160, 1/0 Module and Tool Software Preparation of Commercial Dedication Instructions (CDIs)

NA 7-4 0

NA 7-4 (Rev 0).pdf Dedication Of Commercial Grade Items WEC 7-2 1

WEC 7-2 (Rev 1).pdf COMMERCIAL GRADE SURVEYS WEC 7-3 0

WEC 7-3 (Rev 0).pdf COMMERCIAL DEDICATION REPORT FOR QNX.4.25G FOR COMMON Q WNA-CD-00018-GEN 03 WNA-CD-00018-GEN (Rev 03).pdf APPLICATIONS

)

WBT-D-1564 Post Accident Monitoring System-WNA-DS-01617-WBT I

WNA-DS-01617-WiBT (Rev 1).pd f System Requirements Specification Post Accident Monitoring System-esyisg Rr menssfo Cation WNA-DSQ01617-WBT 1

WNA-DS-01617-WT (Rev 1).pdf Project Plan

Title:

Common Q Post Accident

'APD003WT 0

W

-D003WT(ev)pd Monitoring SystemWN--003WT 0

W AP-07WB(ev).d Testing Process for Common Q Safet WNA-PT-00058-GEN 0

WNA-PT-00058-GEN (Rev 0).pdf Systems Software Requirements Specification for the WNA-SD00239W3T 0

WNA-SD-00239-WBT (Rev 0).pdf Post Accident Monitoring System W AS-09WT 0ASD03WB e0.d Element Software Test Procedure

.WNA-TP-00357-GEN 4

WNA-TP-00357-GEN (Rev 4).pdf As these documents contain information that is PROPRIETARY to Westinghouse they are being made available to the NRC for review under the following restrictions.

1. All documents will be bound.
2.

The NRC project manager must schedule appointments with Ms. Leslie Collins for viewing documents during normal business hours (8 AM - 4 PM).

3.

The NRC project manager shall make sure the NRC and their Contractors understand they cannot make copies or faxed any document or portion(s) of a document.

4.

To provide NRC staff with electronic search capability we are providing a CD appropriately marked as proprietary with'the documents. Not all documents can be searched as some are image files. The NRC staff can view the documents on their PCs at the Westinghouse office. No copies of CDs can be made and information on the CD can not be stored on their computers.

5. All CDs and documents. must remain in the Westinghouse office.

Attached, for reference, is the table of documents presented at the January 13, 2010 NRC meetings with the addition of the applicable documents identified. Please make the necessary notification to the NRC regarding access to the documents along with the restrictions as noted in this letter.

if you have any questions regarding this letter, please contact me at 412-374-6515.

Very truly yours, G. A. Gisoni Vice President and Project Director cc:

Frank Koontz Greg Gisoni Pete Olson Tsing-Y Liu Leslie Collins Mike Easter Jack Moseley Dave Ellis Susan Napolitano Andy Drake John Merkovsky Nick Norante Mike Warshafsy Mark Marscher Mark Stofko Mike Norrell Patricia Schaffer

Watts Bar 2 - NRC Licensing Documents (List from January 13, 2010 NRC Meeting)

Commercial Grade Dedication Plan Common Q Topical Report (Section 11)

S Completed M L050350234 D3 Analysis WB2 PAMS D3 Analysis N/A N/A N/A Design Report on Computer Integrity, Test and Calibration, Common Q Topical Report (Sections 6.4 and 9)

S Completed M L050350234 and Fault Detection Theory of Operation Description Common Q Topical Report (Sections 6.2 and 6.3)

S Completed M L050350234 EQ Testing Plans Common Q Topical Report (Section 8)

S Completed M L050350234 SQA Plans and Procedures Common Q Software Program Manual (Section 4)

S Completed ML050350234 System Description to Block Diagram Level Watts Bar 2 PAMS System Design Specification A

Completed WNA-DS-01667-WBT, Rev. 0 HW and SW Architecture Watts Bar 2 PAMS System Design Specification and A

WNA-DS-01667-WBT, Rev. 0 Descriptions Software Requirements Specification A

Completed 0

WNA-SD-00239-WBT, Rev. 0 Preliminary FMEA Watts Bar 2 PAMS specific FMEA 5

September 2010 Document not available at this time Safety Analysis Part of IV&V Report A

September 2010 Document not available at this time System Requirements Watts Bar 2 PAMS specific System Requirements SpeifcatonSpeifcatonA Completed WNA-DS-01617-WBT, Rev. 1 Specification Specification System Test Plan Testing Process for Common Q Safety Systems A

Completed

.WNA-PT-00058-GEN, Rev. 0 Software Design Spec Watts Bar 2 PAMS Software Design Spec A

March 2010 Documents not available at this time Software Development Plan Watts Bar 2 PAMS Software Project Plan A

Completed WNA-PD-00073-WBT, Rev. 0 Software Maintenance Plan Common Q Software Program Manual (Section 7)

S Completed ML050350234 Software Operation Plan Watts Bar 2 PAMS Technical Manual A

October 2010 Document not available at this time Application SRS Watts Bar 2 PAMS Software Requirements A

Completed WNA-SD-00239-WBT, Rev. 0 Specification I

IompletedWNA-SD-00239-WBT,_ev.

Software Safety Plan Common Q Software Program Manual (Section 3)

S Completed ML050350234

Watts Bar 2 - NRC Licensing Documents (List from January 13, 2010 NRC Meeting)

S A

Software Test Plan Testing Process for Common Q Safety Systems A

Completed WNA-PT 00058-GEN, Rev. 0

1) 00000-ICE-37722, Rev 00, dated November 11, 1999, "Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications";

2). WNA-CD-00O18-GEN, Rev 03, dated October 8, 2008, "Commercial Dedication Report for QNX 00000-ICE-37722, Rev. 00 Software Tool Verification 4.25G For Common Q Applications";

WNA-CD-00018-GEN, Rev. 03 Program

3) GWK F 700 778, Rev. 01, dated February 18, A

Completed GWKF700 778, Rev. 02 2000, "Generic Operating History Evaluation Report on Previously-Developed Software in ABB GWK F 700 777, Rev. 02 AC 160, 1/0 Modules and Tool Software";

4) GWK F 700 777, Rev. 02, dated February 22, 2000, "Design and Life Cycle Evaluation Report on Previously-Developed Software in ABE ACI60, I/O Modules and Tool Software" Software Training P Watts Bar 2 Software Training Plan (Utility A

WB2 TVA Responsibility

______________________Responsibility)

Software V&V Plan and Procedures Common Q Software Program Manual (Section 5)

S Completed ML050350234 Requirements Traceability Watts Bar 2 PAMS specific RTM A

September 2010 Document not available at this time Matrix Al Cards February 2011 Commercial Grade Dedication Commercial Grade Dedication Instructions for A1687, A

Documents not available at this time Report AI688, Upgraded PC node box and flat panels PC Node Box &

FP September 2010 WEC Level 11 QA Procedures WEC Commercial Grade Dedication WEC Level II QA Procedures WEC 7.2,7.3; RRAS A

Completed 7.2 (Rev 1), WEC 7.3 (Rev. 0)

Procedures Level II Procedures NA 7.4, 0

RRAS Level II Procedures NA 7.4

-1_

1 (Rev. 0)

Watts Bar 2 - NRC Licensing Documents (List from January 13, 2010 NRC Meeting)

S~~

I anbe WVNA-DS-01617-WBT, Rev. 1 Final Design Description Final Watts Bar 2 PAMS specific SysRS and SRS.

A September 2010 WNA-D-00617-WBT, Rev. 0 S D NA-SD-00239-v BT, Rev. 0 Final FMEA Final Watts Bar 2 PAMS specific FMEA S

September 2010 Document not available at this time Final Logic Diagrams Watts Bar 2 PAMS specific logic diagrams A

September 2010 Document not available at this time Final Reliability Analysis Watts Bar 2 PAMS specific reliability analysis A

September 2010 Document not available at this time A1687/688 November 2011 Final Report on Acceptance of Summary report on acceptance of A1687, A1688, A

Documents not available at this time Commercial Grade Dedication Upgraded PC node box and flat panels PC node box and FP September 2010 Final System Configuration Watts Bar 2 PAMS specific configuration drawings A

September 2010 Document not available at this time Documentation Final FactoryAcceptance Test Watts Bar 2 PAMS specific FAT report A

August 2010 Document not available at this time Reports Installation Test Plans and Watts Bar 2 PAMS specific SAT test plan and A

August 2010 Document not available at this time Procedures procedure Qualification Test Procedures EQ test procedures for AI687, A1688, Upgraded PC A

TBD Document not available at this time node box and flat panels A____Docuentotaailaleathitim Summary of Final EQ Test EQ Summary report for A1687, AI688, Upgraded PC A

TBD Document not available at this time Results node box and flat panels Summary of Test Results Watts Bar 2 PAMS specific IV&V Phase Summary A

September 2010 Document not available at this time (including FAT)

Reports System Test Procedures Watts Bar 2 PAMS specific FAT Procedure A

July 2010 Document not available at this time Software Management Watts Bar 2 PAMS specific Project Plan and Software A

Completed WNA-PD-00073-W'BT, Rev. 0 Implementation Procedures Project Plan Software Project Risk Watts Bar 2 PAMS specific Project Plan and Software A

Completed WNA-PD-00073-WBT, Rev. 0 Management Report Project Plan

Watts Bar 2 --NRC Licensing Documents (List from January 13, 2010 NRC Meeting)

1) Element Software Test Procedure, WNA-TP-00357-GEN Software Test Procedures A

June 2010

2)

Watts Bar 2 PAMS specific Processor Module Software Test Software Tool Analysis Report See Software Tool Verification Program A

Completed V&V Reports Watts Bar 2 PAMS specific IV&V Phase Summary A

September 2 reports