UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 19, 2010 Mr. Jon A. Franke, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708 SUB"IECT:
CRYSTAL RIVER UNIT 3 - EVALUATION OF THE REQUEST FOR AN EXTENSION OF ENFORCEMENT DISCRETION IN ACCORDANCE WITH THE INTERIM ENFORCEMENT POLICY FOR FIRE PROTECTION ISSUES DURING TRANSITION TO NATIONAL FIRE PROTECTION STANDARD NFPA 805 (TAC NO. ME2738)
Dear Mr. Franke:
On September 10, 2008, the U.S. Nuclear Regulatory Commission (NRC, the Commission) published in the Federal Register (73 FR 52705) a revision to its Interim Enforcement Policy regarding enforcement discretion for certain fire protection issues, allowing licensees the option to request an extended enforcement discretion period for submittal of a license amendment request (LAR) if they are pursuing transition to Title 10 of the Code of Federal Regulations Section 50.48(c), "National Fire Protection Association Standard NFPA 805."
This revision states that an additional period of enforcement discretion may be granted on a case-by-case basis, if a licensee has made substantial progress in its transition effort. This additional period of enforcement discretion, if granted, would end 6 months after the date of the safety evaluation approving the second pilot plant LAR. These changes are in accordance with COMSECY-08-0022, as approved by the Commission on August 19, 2008. The enforcement discretion will continue in place, without interruption, until NRC disposition of the site's LAR to transition to NFPA 805.
By letter dated November 25, 2009 (Agencywide Documents Access and Management System Accession Number ML093340428), Florida Power Corporation (FPC, the licensee) requested that the period of fire protection enforcement discretion for Crystal River Unit 3 Nuclear Generating Plant (CR-3) be extended until 6 months after the NRC's approval of both pilot plant LARs to transition to the National Fire Protection Association's risk-informed, performance-based standard for light water reactors (NFPA 805). In accordance with the new interim fire protection enforcement policy outlined above, a licensee may request an extension of its evaluation period beyond the 3 years of enforcement discretion previously provided.
To be granted this extension, a licensee must:
- 1.
Compile a list of all fire protection related noncompliances and the related compensatory measures for those noncompliances.
J. A. Franke
- 2
- 2.
Document that each Operator Manual Action put in place as a compensatory measure is feasible and reliable, in accordance with the guidance in Regulatory Issue Summary 2005-07, "Compensatory Measures to Satisfy the Fire Protection Program Requirements."
- 3.
Submit a description of the physical modifications performed to address existing risk-significant fire protection noncompliances.
- 4.
Submit a status report of the transition, including a schedule of milestones, for completing the fire probabilistic risk assessment (PRA). The status report should describe the progress made in the following areas:
classical fire protection transition nuclear safety performance criteria transition nonpower operation transitions the NFPA 805 monitoring program fire PRA development The lists of non-compliances, compensatory measures, and operator manual action feasibility determinations should be maintained onsite and up to date for inspector review.
The NRC staff reviewed FPC's request, and has determined that the licensee has made substantial enough progress in its transition to NFPA 805 to grant the additional enforcement discretion. Accordingly, the enforcement discretion period for CR-3 is hereby extended until 6 months after the date of the safety evaluation approving the second pilot plant LAR.
If you have any questions regarding this matter, please contact Farideh Saba, the project manager for the CR-3 at (301) 415-1447.
Sincerely,
/-101 ?
1/
_/ ~
L {-~--U~1._~;;' ~zX---'~_
Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302 cc: Distribution via ListServ
J. A. Franke
- 2
- 2. Document that each Operator Manual Action put in place as a compensatory measure is feasible and reliable, in accordance with the guidance in Regulatory Issue Summary 2005-07, "Compensatory Measures to Satisfy the Fire Protection Program Requirements."
- 3. Submit a description of the physical modifications performed to address existing risk-significant fire protection non-compliances.
- 4. Submit a status report of the transition, including a schedule of milestones, for completing the fire probabilistic risk assessment (PRA). The status report should describe the progress made in the following areas:
- classical fire protection transition
- nuclear safety performance criteria transition
- non-power operation transitions
- the NFPA 805 monitoring program
- fire PRA development The lists of non-compliances, compensatory measures, and operator manual action feasibility determinations should be maintained on-site and up to date for inspector review.
The NRC staff reviewed FPC's request, and has determined that the licensee has made substantial enough progress in its transition to NFPA 805 to grant the additional enforcement discretion.
Accordingly, the enforcement discretion period for CR-3 is hereby extended until 6 months after the date of the safety evaluation approving the second pilot plant LAR.
If you have any questions regarding this matter, please contact Farideh Saba, the project manager for the CR-3 at (301) 415-1447.
Sincerely, IRA by AHowe fori Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302 cc: Distribution via ListServ DISTRIBUTION:
PUBLIC RidsOgcRp PLain, NRR LPL2-2 RlF RidsAcrsAcnw_MailCTR HBarrett, NRR RidsNrrDorlLpl2-2 RidsRgn2MailCenter CMoulton, NRR RidsNrrLACSola RidsNrrDraAfpb (AKlein)
RGallucci, NRR RidsNrrPMCrystalRiver ADAMS Accession Number" ML100480260 NRR-106 OFFICE LPL2-2:PM LPL2-2:LA DRAlAFPB/BC LPL2-2:BC (A)
DORUDD NAME FSaba RSoia AKlein*
BMozafari JGiitter AHowe for DATE 2/18/10 2/18/10 01/07/2010 2/18/10 2/19/10
- by memo dated OFFICIAL RECORD COPY