ML100470060
| ML100470060 | |
| Person / Time | |
|---|---|
| Site: | University of Utah |
| Issue date: | 02/03/2010 |
| From: | Furse C, Parks T Univ of Utah |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML100470060 (3) | |
Text
VICE PRESIDENT FOR RESEARCH THE UNIVERSITY OF UTAH February 3,2010 United States Nuclear Regulatory Commission Docket Control Desk Mail Stop 0 12-G13 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738
Subject:
This is an exact copy of our previous letter dated 12-30-09, but with the oath and notarization attached.
UUTR Technical Specification Amendment Request - Clarification of the Administration Organization for UUTR Operation (License No. R-126, Docket No. 50-407) and -
Notification of new Administrator (Level 2)
This letter is to provide clarification of the University of Utah 100 kW TRIGA Reactor (License No. R-126, Docket No. 50-407) (UUTR) Administrative Organization chart existent in the Technical Specification ( Chapter 14) submitted together with SAR in 2005. This clarification is submitted as amendment #7, attached. The clarified organization chart is Figure 6.1, in Section 6:`10 Ai.6istfratiiv" C6ntr6Is,. in Cliipfer 14 Techni&al:Specification,'.pg:26.. :In.theattached file, Figure 6..1 §'s edrav'wn to more cl~aily :how'the facility Organizationwand.management;.1ines of communication and lines of responsibilityand reporting. This is designed to bein f*ill compliance with the ANSI/ANS 15.1-2007 and ANSI/ANS 15.4-2007 regulations. Section 6.0 Administrative Controls was also rearranged to follow NUREG 1537 Part 1 & 2, and ANSI/ANS 15.1-2007 and ANSI/ANS 15.4-2007 regulations. The clarifications in;Section.6.0 do not reflect 7 'any substantive changes in our administrative organization.
This letter is also to provide you with notificationof our new Level 2 Administrator.,In.a letter
,,,,dat6d&May 26, 2009, we confirmed that Dong-Ok Choe would be ser~ving as Interim Reactor
.1 JAdmlnistrator (Level 2) under our old organizational chart. In August 2009, we hired Chaired Professor Tatjana Jevremovic as the new Director (Administrator).of the Utah'Nuclear:,
"Engineering Program (UNEP) and Nuclear Engineering Facilities (NEF). We would now like to c*onfirm that she will be serving as the Level 2 Administrator (with responsibilities based on the revised Section 6.0 Administrative Controls), effective immediately. She will now be the priirmary point of contact between the University and the NRC.
ANs6 the Level 1 administrator is now Associate Vice President for ResearchDr. Cynthia Furse.
She is replacing Dr Ron Pugmire in this role. Please also update:your.c-ontact,,forour Vice President of Research This is now Dr. Thomas Parksreplacing Dr. Ray:Gesteland 201 Presidents Circle, Room 210, Salt Lake City, UT 84112-9011 1(801) 581-7236 1Fax (801) 585-6212 research@utah.edu Iwww.research.utah.edu
Page 2 of 3 United State Regulatory Commission Letter Contact information for Drs. Jevremovic, Furse and Parks is given below:
Tatjana Jevremovic, PhD Director, Utah Nuclear Engineering Program Joseph Merrill Engineering Building 50 Central Campus Drive, Room 2298 801/587-9696 tatjana.jevremovic@ utah.edu Cynthia Furse, PhD Associate Vice President for Research University of Utah 201 President's Circle, Room 210 Salt Lake City, Utah 84112 801/581-7236 cfurse@ece.utah.edu Thomas Parks, PhD Vice President for Research University of Utah 201 President's Circle, Room 210 Salt Lake City, Utah 84112 801/581-7236 tom.parks @ utah.edu I declare certify under penalty of perjury that the foregoing is true and correct.
Cynthia Furse, PhD Associate Vice President for Research rr Research homas N. Parks, PhD ice President for Research Utah
)
SS Salt Lake) d and sworn to (or affirmed) before me this __
day of FPd'
,20 /0 a Furse.
ýý///.I Subscribed and sworn to (or affirmed) before me this day of 2044_
20 b5 Thomas N. Parks.
9 Notary Public JACQUELIN~E L. WIN!ROWll 2
Commlission #578184 f
q My Commission Expires
~ ~.
State ofUtah I
y commi Notary Public qVy cormmis "sion expires September 14, 2011
Page 3 of 3 United State Regulatory Commission Letter cc:
Richard Brown, PhD Dean, College of Engineering Warnock Engineering Building 72 Central Camus Drive, Room 1650 Salt Lake City, UT 84112 801/585-7498 brown@coe.utah.edu Tatjana Jevremovic, PhD Director, Utah Nuclear Engineering Program Joseph Merrill Engineering Building 50 Central Campus Drive, Room 2298 801/587-9696 tatjana.jevremovicc @ utah.edu Dong-Ok Choe, PhD Research Assistant Professor Center for Nuclear Engineering Program 50 Central Campus Drive, Room 1205 Salt Lake City, UT 84112 801/581-4188 choe@nuclear.utah.edu Dffrey A. Wertz, P.E.
ýJect Manager search and Test Reactors
.\\Nuclear Regulatory Commission rslkA\\301/415-0893 C. 434/384-0726
< ý1 I