Forwards Apps a & B of Indian Point 2,3rd Interval ISI Plan, Consisting of ISI Program P&Ids & ISI Program Oversize Equipment Drawings.Apps A-C Not Included in Util 940124 Submittal.App C Will Be Transmitted within Few Wks
ML100430459
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/08/1994
From: Bram S
Consolidated Edison Co of New York
To:
NRC/IRM
Shared Package
ML100430460 List:
References
NUDOCS 9402280384
Download: ML100430459 (2)


Text

Stephen B. Bram__

Vice President Consolidated Edison Company of New York, Inc.

Indian Point Station February 8, 1994 Broadway & Bleakley Avenue Buchanan, NY 10511 Re:

Indian Point Unit No.

2 Telephone (914) 734-5340 Docket No.

50-247 Document Control Desk US Nuclear Regulatory Commission Mail Station P1-137 Washington, DC 20555

SUBJECT:

Third Ten-Year Interval Inservice Inspection Program -- Plant Drawings In accordance with IWA-1400(c) of Section XI of the ASME Boiler and Pressure Vessel Code, on January 24,

1994, Consolidated Edison submitted the Indian Point Unit 2

Inservice Inspection (ISI) Program Summary for the period July 1, 1994 through June 30, 2004, which is the third 120 month interval.

Not included in that submittal were Appendices A-C, plant drawings.

Appendices A and B are transmitted herewith to support NRC review of the program and the relief requests.

Appendix C will be transmitted within the next few weeks.

Appendix A contains the Piping and Instrumentation Drawings (P&IDs) for the systems that are included in the ISI program.

Two sets of these drawings are provided.

One set is sized 11" x 170 and is color coded to identify the program scope.

The other set is full size to facilitate review of system details. Appendices B and C contain full size ISI program equipment drawings and isometric drawings, respectively.

Due to their bulk and awkward size, the full size drawings are being transmitted only to the Document Control Desk for the Public Document Room, the NRC Indian Point Unit 2 Project Manager and the NRC's contract reviewer in Idaho.

These transmittals are in accordance with NRC Project Manager and Resident Inspector direction.

Additional full size copies are available upon request.

Should you have any questions regarding this matter, please contact Mr. Charles W. Jackson, Manager, Nuclear Safety and Licensing.

Very truly yours, 9402290384 940208 PDR ADOCK 05000247 ra PDR

cc:

Mr. Francis J. Williams, Jr., Project Manager Project Directorate I-1 Division of Reactor Projects I/II US Nuclear Regulatory Commission Mail Stop 14B-2 Washington, DC 20555 Mr. Boyd W. Brown EG&G Idaho, Inc.

INEL Research Center 2151 N. Boulevard P.O. Box 1625 Idaho Falls, ID 63415-2209 cc with full size Appendix A and B drawings listed, but copies not included, in transmittal:

Mr. Thomas T. Martin Regional Administrator -

Region I US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector US Nuclear Regulatory Commission P0 Box 38 Buchanan, NY 10511